
Dilini Soysa
Trainee Civil Engineer

Connect with Dilini Soysa to Send Message
Connect
Connect with Dilini Soysa to Send Message
ConnectTimeline
About me
Civil Engineer | Project Manager | ERP | Property Management
Education

Asian Institute of Technology
2011 - 2014Bachelor of Science (BSc) in Engineering Civil Engineering First Class Honours
Experience

International Construction Consortium Pvt Ltd
May 2012 - Aug 2012Trainee Civil Engineer
Civil and Structural Engineering Consultants
Jun 2014 - Dec 2014Structural Engineer%20Ltd.webp)
International Construction Consortium (Pvt) Ltd
Jan 2015 - nowCoordinate/Integrate planning and monitoring aspect of building projects.• Establish plans for Project duration, resources, revenues, costs and cash flows.• Establish and implement a system of monitoring progress of work, utilization of resources, Earned Values, costs and cash flows in relation to established project plans • Produce quarterly reports outlining deviations, highlights and course corrections (if any) for decision making at top management• Guide Project Planning Engineers to revise plans when necessary and obtain commitments from the project team.• Coordinate between project sites and head office with respect to planning and monitoring.• Data production to enable planning data to be acquired and stored methodically for use in future projects• Assisting the CEO in technical matters. Show less Project DescriptionPhase IV of Havelock City project consisted of the construction of two towers named ‘Peterson’ (Tower G) & ‘Edmonton’ (Tower H) of 32-storied height. Level 1 & 2 of these high-rise concrete towers are dedicated for common facilities while level 3 – 31 comprises of 332 dwelling units with 1, 2, 3 and 4 bedrooms. In addition to these levels both towers have a water tank at level 32 and a basement level in tower G facilitating access to service rooms. The approximate plan area of this phase is 1,682 square meters and sums up to a total floor area of 52,454 square meters. Project Cost: LKR 6108 MillionMy Role as the Project Planning Engineer• Prepared required technical data for variation claims and Extension of Time (EOT) requests• Represented the project site in all written and oral communication• Prepared the construction master schedule and updated the actual project progress against the originally scheduled program every week and submitted for client’s review• Prepared technical specifications and schedules for all import material under the Civil scope and evaluated technical aspects of probable material suppliers• Prepared site proposals for the shoring system, excavation plan, de-watering system, etc.• Checked design drawings to identify structural design problems when integrating the structure with architectural and MEP details and proposing possible alternatives to solve the problem to the design team by raising design clarifications• Checked shop drawings completed by the draughtsperson, submitted for approval and issued certified shop drawings to site upon approval• Identified practical issues after discussing with site staff during frequent site visits, and proposed alternative solutions to the consultant and obtained approval• Identified the strengths and weaknesses of the drafting team and assigned tasks accordingly, to manage the team in a productive way Show less Project DescriptionOrchid Apartment II is a medium rise structure comprising of a ground floor with parking facilities, a service floor, entrance level with common facilities and 12 residential floors. The project consisted of the construction of two buildings: Apartment building and car park building, which is approximately 2.0 Acres in extent.The twelve storied Main building operates as the residential tower while the two storied separate car park building satisfies the parking facilities of residents and visitors. These buildings sums up to a total floor area of approximately 27,400 m2.The 14 story tower is supported on a pile and pile cap sub-structure. All columns, beams and slabs are conventional in-situ concrete members and bay windows are precast members while ACOTEC precast wall panels are used as interior partition walls.Project Cost: LKR 2015 MillionMy Role as the Project Planning Engineer• Checked design drawings to identify structural design problems when integrating the structure with architectural and MEP details and proposing possible alternatives to solve the problem to the design team by raising design clarifications.• Simplified design details and issuing to site in a more elaborative form through shop drawings and site instructions• Checked shop drawings completed by the draughtsperson, submitted for approval and issued certified shop drawings to site• Prepared the construction master schedule and updated the progress on monthly basis• Prepared quarterly, monthly, weekly programs for all activities and micro programs for special activities• Prepared documents required for ISO audits under ISO 9001, ISO 14001 and ISO 18001• Submitted material applications• Prepared method statements for all major construction activities • Prepared proposals for temporary structures at site• Prepared site proposals for architectural details such as the swimming pool layout, entrance lobby finer details and external road and drainage arrangement Show less Project DescriptionOrchid Apartment 1 project at Malabe was a high rise Precast structure comprising of two basements, a ground floor and 11 residential floors. The project consisted of the construction of two buildings: Main building and the car park building, which is 1.23 Acres in extent, and located at Thalahena, Malabe, Sri Lanka. The twelve storied Main building operates as the residential tower while the two storied underground car park building satisfies the parking facilities of the residents and visitors. These buildings sums up to a total floor area of 11,600 square meters.The 12 story tower is the first precast midrise building in Sri Lanka. All columns, beams, bay windows, and bridge planks are precast members. The floor slabs used the SBS system and Wall panels were ACOTEC precast wall panels.Project Cost: LKR 900 MillionMy Role as the Project Planning Engineer• Checked design drawings to identify structural design problems when integrating the structure with architectural and MEP details and proposing possible alternatives to solve the problem to the design team by raising design clarifications.• Simplified design details and issuing to site in a more elaborative form through shop drawings and site instructions• Checked shop drawings completed by the draughtsperson, submitted for approval and issued certified shop drawings to site• Prepared the construction master schedule and updated the progress on monthly basis• Prepared quarterly, monthly, weekly programs for all activities and micro programs for special activities• Prepared documents required for ISO audits under ISO 9001, ISO 14001 and ISO 18001• Submitted material applications• Prepared method statements for all major construction activities • Prepared proposals for temporary structures at site• Prepared site proposals for architectural details such as the swimming pool layout, entrance lobby finer details and external road and drainage arrangement Show less
Planning Manager/ ERP Implementation Project Manager
Jun 2023 - nowPlanning Engineer - Monitoring and Coordination
Jun 2020 - May 2023Project Planning Engineer - Havelock City Apartments Phase 4, Colombo 06, Sri Lanka
Aug 2017 - May 2020Project Planning Engineer - Orchid Apartment 11 Project, Malabe, Sri Lanka
Apr 2016 - Jul 2017Project Planning Engineer - Orchid Apartment 1, Malabe, Sri Lanka
Jan 2015 - Apr 2016
Licenses & Certifications

Chartered Civil Engineer
Institute Of Engineers Sri LankaJan 2020
Honors & Awards
- Awarded to Dilini SoysaAIT Fellowship Asian Institute of Technology Sep 2013 Based on my excellent academic performance during September 2012 and January 2013 semesters, I was selected for the AIT Fellowship which entitled myself to a 50% reduction in tuition fee for September 2013 and January 2014 semesters in the AIT Undergraduate Program
Recommendations

Fia amalia
Lecturer | Doctor of Veterinary Medicine | Master of ScienceMalang, East Java, Indonesia
Roberta d'angeles andrade
Analista de Desenvolvimento OrganizacionalSão Paulo, São Paulo, Brasil
Tuqeer nasir
Nano Engineering | Thin Film Deposition | DOE & SPCSugar Land, Texas, United States
Gia evans
Human ResourcesPikesville, Maryland, United States
Ramesh j
Associate Production Manager | Printing & Packaging (FMCG & Pharma) | Graphics DesignNagercoil, Tamil Nadu, India
Lekshmy krishna
BI Engineer / Database Developer / Data AnalystIrvine, California, United States
Alena fields
MSIOP; BSBM; PMPLafayette, Louisiana, United States
Nicholas disalvo
Digital Distribution Manager at Stickman-RecordsBerlin, Berlin, Germany
Shahadat minto
Director at Phi Tex BDBangladesh
Janaki nair
MSc Psychology (conversion) at Cardiff University :-: Law graduateCardiff, Wales, United Kingdom
Ramona rahman
Senior Manager at Brunei Investment AgencyBandar Seri Begawan, Brunei-Muara District, Brunei
Bryanna sanchez
Student at Texas A&M UniversityBryan, Teksas, Birleşik Devletler
Marina masterova
Senior Audit Manager at KPMG Finland, DPPHelsinki, Uusimaa, Finland
Sofia joseph
Senior Manager at HCLTechChennai, Tamil Nadu, India
Sonia fernandez llado
Lead Account Manager, Telecommunications, Project CoordinatorGreater Sacramento
Muriel thokozile myeka
Administrative AssistantCity of Johannesburg, Gauteng, South Africa
Jiwon choe
Legal Counsel at Asurion KoreaSeoul, South Korea
Mª amparo merelo eres
Asesora inmbiliariaGreater Valencia Metropolitan Area
Ignacio kuchen
NDT Quality Sr. Analyst at TenarisArgentina
Alisher juraev
Regional Manager - ZTE CorporationUzbekistan
...