Himanshu Chavan

Himanshu Chavan

QC Inspector

Followers of Himanshu Chavan205 followers
location of Himanshu ChavanAurangabad, Maharashtra, India

Connect with Himanshu Chavan to Send Message

Connect

Connect with Himanshu Chavan to Send Message

Connect
  • Timeline

  • About me

    Construction Manager

  • Education

    • M.G.M.'S College of Engineering, Ari Port Road, Nanded

      1996 - 2000
      Bachelor of Engineering - BE Civil Engineering First division with Distinction
    • M.G.M's Jawaharlal Nehru College of Engineering

      1996 - 2000
      Bachelor of Engineering - BE Civil Engineering First Class with Distinction
    • M.G.M.'S College of Engineering, Ari Port Raod, Nanded

      1996 - 2000
      Bachelor of Engineering - BE Civil Engineering First division with Distinction
    • Swami Ramanand Teerth Marathwada University

      1996 - 2000
      BE Civil Engineering First Class
  • Experience

    • BESIX Construct LLC Dubai UAE

      Jun 2005 - Jan 2007
      QC Inspector

      Project: 1) BURJ DUBAI. (World’s tallest-169 Storey tower project)Client: EMAAR PropertiesManagement by: TurnerConsultant: Hyder consultant2) Site: Business Bay Bridge (Longest bridge in UAE. Consists of Flyover on Land, Marine and Underpass)Client: Dubai MunicipalityConsultant: Parsons

    • ALDAR Laing Orourke Construction LLC Abudhabi UAE

      Sept 2007 - Jun 2009
      Sr. QA/QC Engineer

      Project : Al Zeina / AL Raha Beach DevelopmentConsists: 6- Precincts each B+G+14 Floors & totally 28 Core walls & one precinct for beach villas. Consultant: Pell Frischmann

    • AECOM Middle East Ltd Abudhabi UAE

      Jun 2009 - Oct 2011
      Structural Inspector

      Project: Etihad Towers. A mixed used development approx. 460,000m2 composed of a total of five towers from 53 to 77 floors, a large multi levelpodium & four level underground parking with a capacity of more than 3,200 cars.Client: Sheikh Suroor Bin Moh’d Al Nahyan Project Dept.Management by: Hill InternationalMain Contractor: ACC

    • EWAN Architectural & Engineering Consultancy

      Oct 2011 - Jun 2012
      Site Inspection Engineer

      Project: Presidential PalaceThe Palace will be utilized to house the offices of H.H. The President, H.H. The Vice President, H.H. The Crown Prince, and the Ministers. The development encompasses approximately 150 hectares, and will include the Palace and the required ancillary buildings. The Palace will exceed 160000m2 of built area and will contain several VIP wings, a Ministers wing, and several Majlis and Dining Halls. The Common Areas of the Palace will utilize an additional 5,614 square meters and will include a Main Entrance Hall, Main Hall, Fountain Courtyard, Media Hall, and a Press Center. The ancillary buildings, which incorporate over 23000m2, will include a Public Majlis, Mosque, Staff & Military Accommodations, a Services Compound, and various Gatehouses and Watchtowers. The project also includes 2000m of 6m seawall, 4 million m3 of dredging and 2500m of revetment.Client: The Executive Committee for Presidential Palace ProjectProject Manager: ARMSTRONGMain Contractor: CCC & Ghantoot JV Show less

    • AECOM

      Jun 2012 - May 2015
      Construction Supervisor

      Project: Crescent Development Project.The Crescent Development Project or The Crescent is an under construction skyscraper complex which is being built on the Caspian Sea coast in Baku. The project comprises an offshore 36-floors Hotel (Crescent Hotel), business center (The Crescent City) a 203 meter skyscraper with 39 floors + 4 Pent house level, (The Crescent Place) includes a 32-story + 3 Pent house level residential tower and a retail and entertainment center.• Client: Gilan Holding• Project Manager: AECOM• General Contractor: AECOM Show less

    • AECOM

      Jan 2016 - Nov 2018
      Construction Coordinator

      Abu Dhabi Plaza is a development under construction in Astana, Kazakhstan, consisting of office, residential, and shopping space and a hotel. When completed, the project will have one residential, one hotel & 3 towers reaching different heights, tallest reaching a height of 382 m with 75 floors and will be the tallest building in Central Asia• Client: ALDAR Properties• Project Manager: Mott McDonald• Construction Supervision consultant: AECOM• General Contractor: Arabtec - CCC JV Show less

    • Panchshil Developers

      Nov 2018 - now
      Construction Manager

      Construction of Row houses and apartment buildings within city

  • Licenses & Certifications

    • Managing Safely in Construction

      THE INSTITUTION OF OCCUPATIONAL SAFETY AND HEALTH
      Sept 2009
    • LEED Green Associate

      U.S. Green Building Council
      May 2011