Jacobo Vázquez

Jacobo vázquez

bookmark on deepenrich
location of Jacobo VázquezBarcelona, Catalonia, Spain
Phone number of Jacobo Vázquez+91 xxxx xxxxx
Followers of Jacobo Vázquez610 followers
  • Timeline

    Dec 2008 - Sept 2017

    Project Manager

    Prointec
    Algeria
    Oct 2017 - Nov 2022

    Project Manager

    SENER
    Current Company
    Oct 2022 - now

    Project Manager

    Prointec
  • About me

    Project Manager, PMP

  • Education

    • Universidad politécnica de madrid

      2003 - 2009
      Msc aeronautical engineering. airports
    • Udima universidad a distancia de madrid

      2010 - 2011
      Master in occupational risk prevention health & safety management
  • Experience

    • Prointec

      Dec 2008 - Sept 2017

      Project Manager in supervising the construction of the "New Car Park at Airport of Algiers" (PEM: €80M), with a surface area of 240,000 m2 and 4,500 spaces, a 350 m long viaduct on two levels and a 530 m long footbridge. The main challenges that have been achieved include:• Making decisions and solving problems in real time and under pressure.• Quality assurance and compliance with deadlines. • Preparation of monthly financial statement and new unit prices review.• Coordination of the technical development for the Modified Project.• Regular coordination meetings with contractors, subcontractors, clients, local authorities and other statutory bodies. Show less Coordination between the various disciplines intervening in the project “New Terminal Zone of Algiers Airport” (PEM: €800M); including a terminal building of 70,000 m2 distributed over 5 levels for 10M pax, 240,000 m2 of parking area for vehicles with more than 4500 spaces and 570,000 m2 of apron and taxiways with 17 stands. The main challenges that have been achieved include:• Arrange and lead coordination meetings between discipline heads (structures, facilities, enabling works and architecture).• Operational Safety Manager.• Management and technical development of new project proposals and improvements.• Resolution of interferences between the different lots of the project (terminal building, airside and car park).• Regular coordination meetings with contractor, client, local authorities and other statutory bodies.• New unit prices review. Show less Civil Works Manager on the contract: "Management and Administration Service of regular maintenance projects at Peruvian airports: Anta, Cajamarca, Chachapoyas, Iquitos, Pucallpa, Tarapoto, Tumbes, Talara, Piura, Chiclayo, Trujillo and Pisco". The main challenges achieved:• Coordination of works carried out simultaneously at different airports. • Human resource management (up to 16 engineers).• Making decisions in real time and under pressure at operational airports.• Planning of activities and work phases.• Elaboration of improvements proposals through a technical and economic analysis.• Weekly coordination meetings with the client to report the work progress and solutions to incidents detected. Show less Civil works manager in monitoring on-site works and expert engineer in aeronautical pavements for “Airfield rehabilitation of Arequipa, Ayacucho, Tacna, Juliaca and Puerto Maldonado Airports. The main challenges achieved:• Coordination of works carried out simultaneously at different airports. • Human resource management (up to 20 engineers).• Making decisions in real time and under pressure at operational airports.• Regular meetings with contractors, customers and local authorities.• Technical development of improvement proposals.• Preparation of monthly financial statement. • Report of work progress and incidents to the client. Show less Project Manager for "Technical Assistance for the Control and Supervision of Construction for the Expansion of Terminal T2 at Valencia Airport" (PEM: €60M). Client : AENA (Spanish Airports SA).I was involved in planning, direction and coordination of on-site works supervision, in order to ensure quality, program and budget. Principal challenges achieved: • Coordination with client and authorities for bringing into service the new terminal zone.• Development of work phases by keeping the operation of existing terminal. • Coordination between different disciplines of the project.• Financial control, including audit defence.• Reporting progress and cost to client. Show less

      • Project Manager

        Nov 2016 - Sept 2017
      • Works Coordinador

        Apr 2015 - Oct 2016
      • Civil Works Manager

        Apr 2014 - Mar 2015
      • Civil Works Manager and Expert Engineer

        Feb 2014 - Dec 2014
      • Project Engineer

        Sept 2013 - Jan 2014
      • Project Manager

        Jun 2012 - Sept 2013
      • Works Coordinator and Operational Safety Manager

        Jun 2011 - May 2012
      • Civil Works Manager

        Jan 2010 - Jun 2011
      • Project Engineer

        Dec 2008 - Jan 2010
    • Sener

      Oct 2017 - Nov 2022
      Project manager

      Project Manager for the development of several multidisciplinary tasks during the design phase of the London-Birmingham high-speed railway line.The main challenges achieved: technical development in different railway disciplines, direct communication with the customer, contract management, quality assurance, schedule and budget.Tasks assumed:CALVERT IMD STUDYDevelop a study for the Calvert IMD (Infrastructure Maintenance Depot) focusing on the feasibility of building a fully functional depot within the current footprint. This study includes a design of the Rail-Head (Construction Base) to be executed prior to the IMD, within the footprint established.SWITCHES & CROSSING DETAILED SPECIFICATIONSTechnical specifications for the Switches & Crossings for HS2 line. This document includes the Switches & Crossings of the Stations, Main Line and Depots, focusing on all the different aspects of the turnout and crossover, such as geometry, components, manufacturing, constructions, testing, etc. STRATEGIC REVIEW OF TELECOMMUNICATIONS PROVISION TO BE DEPLOYED FOR HS2 Develop a strategic to procure and implement a telecommunications network designed to be leading edge thought its’ operational lifetime.GRID CONNECTIONS – TECHNICAL SUPPORTFor Phase One works associated with Railway Systems, provide appropriate resource to HS2 to support the specification and delivery of the grid connection works for both Transmission and Distribution Connections. Show less

    • Prointec

      Oct 2022 - now
      Project manager
  • Licenses & Certifications

    • Project manager. technical course

      Certificacionpm®
      Jul 2021
      View certificate certificate
    • Procore certified: project manager (core tools)

      Procore technologies
      May 2020
      View certificate certificate
    • Project management professional (pmp)

      Project management institute
      Aug 2021
      View certificate certificate
    • Procore certified: project manager (project management)

      Procore technologies
      May 2020
      View certificate certificate