ZULFIKAR .

ZULFIKAR .

Field Work Practice

Followers of ZULFIKAR .719 followers
location of ZULFIKAR .Kota Cilegon, Banten, Indonesia

Connect with ZULFIKAR . to Send Message

Connect

Connect with ZULFIKAR . to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineering Students (STT Fatahillah Cilegon) | NDT MT PT UT Inspector

  • Education

    • SMK Negeri 1 Cilegon

      2019 - 2022
      Mechanical Engineering 86,84

      In this school I get a lot of knowledge that is very important for the industrial world. Such as Safety, Discipline, honesty in work.1. Learn to operate a Lathe Machine2. Learn to operate a Milling Machine3. Learn to operate a CNC Machine4. Learn Technical Drawing

    • SMP Negeri 5 Cilegon

      2016 - 2019
    • SD Negeri Jerang Ilir

      2010 - 2016
    • Sekolah Tinggi Teknologi Fatahillah Cilegon

      2022 -
      Bachelor of Engineering - BE Mechanical Engineering
  • Experience

    • PT. Tokki Engineering And Fabrication

      Aug 2021 - Sept 2021
      Field Work Practice

      Field Work Practices started from August 2021 to September 2021 many experiences I can get here. Starting from knowing how the industrial world and what tools are used in the industrial world.Job Desc: - Practicing Operating production equipment in the form of welding machines, drill machines, drill machines, Lathe machines.- Maintaining work areas to ensure safety, cleanliness and nil for work safety.- Observe the NDT penetrant test procedure

    • PT Radiant Utama Interinsco Tbk

      Jul 2022 - Feb 2023
      NDT Inspector

      Annual Shutdown MaintenancePT. Asahimas Chemical 2022 (VCM, CA, PVC & Power Plant)Job Desc: - Prepare the penetrant & ultrasonic testing tool- Perform penetrant & ultrasonic testing - Make a penetrant & ultrasonic testing report

    • Ohtori Indonesia

      Feb 2023 - Jun 2023
      QC Inspector

      Job Desc: -Penetrant test using ASME 8 div 1 app 8 standards -Check thickness of the paint on the Valve -Check dimensions of the valve -Record and report non-conforming valves-Final inspection witnessed by the customer

  • Licenses & Certifications

    • CNC Machine Operation (Level 2)

      LSP SMK Negeri 1 Cilegon
      Mar 2022
      View certificate certificate
    • Lathe Machine Operation (Level 2)

      LSP SMK Negeri 1 Cilegon
      Mar 2022
      View certificate certificate
    • Non Destructive Test (NDT) Penetrant Testing (PT) ASNT Level 2

      ASNT (The American Society for Nondestructive Testing)
      Oct 2022
      View certificate certificate
    • Kamp Kreatif SMK Indonesia / 3D Printing

      Kementerian Pendidikan dan Kebudayaan (Ministry of Education and Culture Republic of Indonesia)
      Nov 2021
      View certificate certificate
    • Non Destructive Test (NDT) Magnetic Particle Testing (MT) ASNT Level 2

      ASNT (The American Society for Nondestructive Testing)
      Oct 2022
      View certificate certificate
  • Honors & Awards

    • Awarded to ZULFIKAR .
      JUARA 2 Teknologi Tepat Guna Pemerintah Kota Cilegon