Mohit Kumar Gupta

Mohit Kumar Gupta

Graduate engineering trainee

Followers of Mohit Kumar Gupta641 followers
location of Mohit Kumar GuptaUdaipur, Rajasthan, India

Connect with Mohit Kumar Gupta to Send Message

Connect

Connect with Mohit Kumar Gupta to Send Message

Connect
  • Timeline

  • About me

    Electrical Enginner at Hindustan Zinc Ltd--

  • Education

    • Birla Institute of Technology and Science, Pilani

      2020 - 2022
      Master of business administration - mba business statistics 9.0
    • College of Technology and Engineering, Udaipur

      2007 - 2011
      Bachelor of engineering - be electrical engineering

      electrical engineering from college of technology and engineering udaipur with 76.70%

  • Experience

    • Vedanta Group

      Jul 2011 - Jun 2012
      Graduate engineering trainee

      -installed and commissioned electrical equipment's like hv panels, pcc, mcc, switch gears and pmac relays for motor protection. -erected & commissioned 1.32mw diesel generator set, eot cranes and lt & ht motors.-converted cabin operated eot cranes into remote controlled cranes.-expert in sap preventive maintenance & material management module.

    • Vedanta Resources Plc

      Apr 2012 - Mar 2014
      Project engineer

      -installation, testing and commissioning of electrical equipment’s involving- ht switchboard, relay coordination, pmcc & imcc, lv vfd, 11/0.433 kv oil type distribution transformer, vcb & acb, bus ducts, apfc, ups, battery charger, earth pit, imcc protection relay, lt & ht motors.-reviewed vendor drawings, specifications and data sheets like control drawing, scheme finalization between incomer and bus coupler, wiring diagram, sld & equipment datasheet.-anchored erection & commissioning of equipment’s and ensured completion of project in minimum turnaround time with effective resource utilization to maximize the output. show less

    • Vedanta Group

      Apr 2014 - Sept 2022

      -detailed engineering of project, selection and sizing of electrical equipment’s as transformer, hv & lv switchgears, apfc banks, bus ducts, cables, ups & battery charger, earthing & lighting protection system etc.-installation, testing and commissioning of electrical equipment’s involving- 11 kv ht switchboard with abb ref615 and chinese dvp relay, pmcc and imcc, lv and mv vfd, 11/0.433 kv distribution transformer, vcb & acb, ups, battery charger, earth pits, simocode and siprotec siemens protection relay, lt and ht motors.-acted as a member of du-pont (industrial safety consultant) safety implementation committee, managed overall safety in the plant as per iso safety standards and implemented general electrical safety management, permit to work and loto standard in whole unit.-managed operations including resource planning & material planning, in-process inspection, team building and coordination with cross functional reviews.-managed project elements for successful execution: cost, resources, schedule, risk and quality. show less -performed detailed engineering, electrical design and commissioning of brown field, capex, energy conservation and other improvement projects (fip, sga & kaizen) of the dariba location based on payback period, to increase the reliability of the plant to decrease manual activities, safety improvements and cost reduction.-played a key role as asset care module owner of pm and cbm in asset optimization module in making my unit advanced ao+ from normal ao unit (asset optimization).-implementation of ims system with regard to sop, smp, hira, aspect & impact, objectives and targets, moc, jsa.-managed preventive maintenance, conditional monitoring and breakdown maintenance for following equipment’s as per sop's and smp's: lt & ht motors (250 kw to 1120 kw), 11 kv sub station, mcc, pcc, dg, distribution, preheater and electric arc transformers, air circuit breaker & vacuum circuit breaker, vfd and soft starter panels, eot cranes (5t, 10t &15t) and hoists.-developed predictive & preventive maintenance schedules to increase machine up time & equipment reliability, reduced mttr and increased mtbf.-performed failure mode analysis using tools and techniques dmaic, fmea, conditional appraisal. show less

      • Associate Manager-Electrical

        Apr 2018 - Sept 2022
      • Assistant Manager

        Apr 2014 - Mar 2018
    • Atul Ltd

      Sept 2022 - now

      -detailed engineering, design criteria and equipment specifications for electrical as per project requirements with epc, epcm & turnkey engineering consultant.-preparation of itps, pre-commissioning & commissioning check lists. review & finalization of commissioning spares in coordination with o&m team & completing procurement actions.-accountable for all the electrical discipline activities, coordination with construction management at project site, coordination within the design and construction team of internal and consultant and ensure that all capital projects delivered are technically fit for purpose and meet the statutory requirements.-equipment selection & sizing of transformer, cables, lighting system, earthing system, motors, dg, vcbs, mcc/pcc panels, apfc, voltage drop calculation, lux level calculations, ups & battery charger, cable tray sizing, etc. show less

      • Manager-Central Engineering

        Apr 2023 - now
      • Manager-Expansion Projects

        Sept 2022 - now
  • Licenses & Certifications

    • Power BI Essential Training

      LinkedIn
      Oct 2021