Mehrdad Tiyouri

Mehrdad Tiyouri

Site Engineer

Followers of Mehrdad Tiyouri1000 followers
location of Mehrdad TiyouriBrisbane, Queensland, Australia

Connect with Mehrdad Tiyouri to Send Message

Connect

Connect with Mehrdad Tiyouri to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Azad University (IAU)

      2000 - 2006
      Bachelor’s Degree Mechanical Engineering

      Activities and Societies: Mechanical Engineers Society

  • Experience

    • JALKEH EPC Co.

      May 2008 - Mar 2013
      Site Engineer

      • Safety observation and ensure all activities adhered to and compliant with HSE at all time• Planning & coordinating each step of construction to meet quality, budget and timeframe• Site coordination and supervision for all activities and sequences of fabrication, fit up, welding, installation and coating for tank parts, mechanical equipment, pipes & structures • Generate TQs/RFIs, change suggestions and troubleshooting as per project needs• Assist to prepare/maintain quality documents and check sheets, red marks and as built drawings and Isometrics, and quantity surveying• Lead and manage subcontractors and respond to their technical queries • Liaise with client representatives to plan/deliver works in accordance with project specifications, milestones and budget• Analyse project activities and provide progress report for project controls and client• Implement and monitor total engineering management systems, policies and procedures that comply with relevant legislation, regulations, standards and codes of practice • Inspection and receipt of mechanical items as per data sheets, inspection and quality plans• Complete material take-offs, generate purchase orders based on best prices obtainedProject Details:• EPC construction of 5 Fixed Roof Oil Storage Tanks, Capacity: 32000 m³ each, including boilers, firefighting systems, all piping of different sizes and materials and pumps, Karaj, IranMajor Achievement:• Suggested to change abrasive type for metal surface preparations which resulted in less contamination, more cost effective, faster process and cleaner metal surface • Suggested a better cutting method (Plasma in lieu of Oxy-Fuel) for plates, which saved substantial amount of time and money and made the cutting edges far more precise Show less

    • Iranian Oil Terminal Company

      Apr 2013 - Apr 2014
      Site Engineer

      • Adhere to the priority of Health, Safety and Environment (HSE) in every activity of project• Manage priorities & schedule performance for development & optimisation purposes• Prepare/ review progress reports for project controls and the client• Plan, observe and control all fabrication and installation activities relevant to piping, tank parts and structures to ensure all milestones are met and quality is adhered to • Inspect and sign off the mechanical equipment and material delivery as per specifications • Quality control and advise on rectification of quality behaviors per Project Quality Plan, ITP, Procedures and applicable Inspection check sheets• Scope management including writing, validating, and controlling project scopes• Perform routine project engineering work requiring application of standard engineering techniques, procedures and criteria• Liaise with managers, other engineering disciplines, subcontractors, and client • Review and respond to TQs/RFIs as well as raise/ monitor/ investigate and close out NCRs• Review/approve work permits and controlling check lists prior to all associated activities Projects Details:• EPCM construction of 4 Floating Roof Oil Storage Tanks, Capacity: 1M bbl. each, including fire protection system and all AG/UG pipes, mechanical equipment installation, heavy duty structures and supports and associated buildings in Kharg Island Tank Farm, IranMajor Achievements:• Received an Appreciation Letter for sincere efforts and outstanding performance from IOTC• Prevented unnecessary procurement of pipes due to discrepancies with drawings as well as through updated data base of stock list, which saved about $100,000 (2013) Show less

    • Applus+ Velosi Australia

      Jun 2015 - Nov 2016
      Quality Engineer - Mechanical

      • Ensuring inspections and controls are carried out and documented in accordance with Quality Plans and Inspection & Test Plans• Performing manufacturing process audits, dimension and workmanship checks on fabrication process as per approved drawings, Specs, QC requirements and ITPs• Reviewing and verifying all relevant technical documents and Welding Procedures • Reviewing material certificates, calibration certificates, MDRs (Manufacturer Data Reports)• Witnessing performance/factory acceptance tests as per QC plan & ITP and ensuring the project’s quality requirements/specifications are adhered to • Conducting pre-shipment inspections on manufactured steel structures • Control of marking, tagging, packing & shipment of fabricated items as per QC plan & ITP• Coordination, management and witnessing Non-destructive examination activities• Performing visual inspections of welding and manufactured structural steelworks• Ensuring all welding data and drawings are current and up to date• Inspecting metal surface preparation and coating and painting process as per QC plan & ITP• Checking welder qualifications and assuring all jobs performed as per generated documentsProjects Details:• Fabrication of heavy structures for Combined Cycle Power Plant at Ichthys LNG, Darwin I worked as a third party QC/QA Inspector for CH2M Hill-UGL joint ventureMajor Achievements:• Been complemented by both the client and my employer for my performance and effort which resulted in high quality fabrication and on-time delivery • Developed and maintained a positive relationship with both the client and subcontractor Show less

    • Sun Engineering (QLD) Pty Ltd

      Mar 2017 - Aug 2019
      Project Manager

      At Sun Engineering, I have been managing / delivering diverse range of projects in field of construction, fabrication and supply for mining, oil/fuel storage, water treatment plant, steel structures, transport and main road jobs etc. Below are some of my day-to-day tasks and responsibilities as a project manager:• Contribute and promote the zero harm and non-negotiable safety policy at all time• Review the contracts & baseline documents after award and identifying risks & bottlenecks• Create/develop budget, planning/scheduling and initiating projects, based on contract milestones, project specs and client’s statutory requirements• Allocating resources, arranging team members, and set kick-off meetings for projects• Generate, review and submit documents for client’s approval as specified by contract• Review the IFC drawings, identify discrepancies and generate/ manage RFI/ TQs• Obtain prices, select vendors/subcontractors, arrange procurement• Lead/manage subcontractors and maintain positive relationship based on mutual interests• Engage with other departments and disciplines and hold meetings to escalate and discuss issues• Liaise with clients and other parties ensuring all statutory expectations are satisfied • Estimate/ quote/ submit variations to clients as well as maintain variation register ensuring all costs additional to scope of work are captured and claimed• Generate/ issue Notice of Delays, Extension of Times, Notice of Variations to clients• Update progress claims and submit to clients monthly to maintain cash flow• Review/ approve/ generate procurement requisitions for material, equipment, and servicesProjects Details:• Demolition and Reconstruction 2 Aviation Fuel Storage Tanks, Papua New Guinea• Construction of 5ML Diesel Storage Tank, Papua New Guinea• Fabrication of Low Loader Trailer for Mining industry• Supply & fabrication of structural & mechanical equipment for Moranbah Coal Mine• Crane Rail Extension of Moranbah Coal Mine Show less

    • SAUNDERS INTERNATIONAL LIMITED

      Aug 2019 - Jun 2021
      Project Manager
    • Sun Engineering (QLD) Pty Ltd

      Jul 2021 - Jun 2022
      Project Manager
    • CB&I

      Jun 2022 - now
      Project Manager
  • Licenses & Certifications

    • Training course on ASME and AWS standards

      Sanaat Pazhoohan Matrah Consultant Engineering Co.
      Sept 2007
    • Process Plant Piping According to ASME B31.3 Series and API

      ISME. Mechanical Engineers Society
      Aug 2007