Wen Xi Huang

Wen Xi Huang

土建工程師

Followers of Wen Xi Huang287 followers
location of Wen Xi HuangTaipei, Taipei City, Taiwan

Connect with Wen Xi Huang to Send Message

Connect

Connect with Wen Xi Huang to Send Message

Connect
  • Timeline

  • About me

    Project engineering manager/Senior civil/Structural/geotechnical engineer

  • Education

    • National Chiao Tung University

      2000 - 2004
      工學學士 Civil Engineering
    • 國立中央大學

      2004 - 2007
      碩士 Civil Engineering
  • Experience

    • 北京鼎固頂好實業有限公司

      Mar 2008 - Apr 2010
      土建工程師
    • Moh And Assistance, Inc

      May 2010 - Oct 2011
      Geotechnical Engineer

      Responsibilities and accomplishments• Responsible for site investigation, writing of geotechnical factual and interpretive reports• Responsible for risk geotechnical analysis of Taoyuan Airport MRT• Analysis of deep excavation system and of Taipei Songshan metro line (excavation method, ground improvement, dewatering, drainage and retaining/shoring system)• Detail design of shallow/deep foundations• Detail design of diaphragm wall of Dapinglin metro station

    • Pacific Engineers & Constructors, Ltd

      Oct 2011 - Sept 2018
      Civil/Geotechnical Engineer

      1. Accomplishmenta. Riyadh Metro Project Line 1 & 2• Responsible for track slab drainage system, external utilities connection (storm drainage system) and civil design of ten stations• Site geotechnical information review along metro line 2 (future ground water and predicted flood level, physical properties of geotechnical unit, potential analysis of seepage)• Analysis and review of deep excavation system along metro line 2 (excavation method, dewatering, drainage and retaining/shoring system)b. Tai-Power Lung-Men Nuclear Power Plant Project• Leader of site survey (walk-down) team, survey pipes, utilities and pipe supports in the nuclear plant• Coordinator of Tai-Power company, civil contractor and assistant (Black and Veatch)c. Taoyuan Elevated Railway Chung-Li Section DL03 ECA Project• Responsible for proposed road drainage system (ditches along proposed road, main culvert and drainage pipe) under elevated railway• Responsible for utilities relocation and civil work (demolition, recovery and site investigation), arrange meeting with residents and client at the site• d. DORTS Taipei MRT System Circular Line Phase I, DF113 Project• Responsible for proposed road drainage system (ditches along proposed road, main culvert and drainage pipe) under elevated metro line• Responsible for utilities relocation and civil work, (demolition, recovery and site investigation), arrange meeting with residents and client at the site • Detail design of Tai-Power high voltage duct• Incorporation of energy saving and carbon reduction for sidewalk along metro line Show less

    • Kaotai Engineering consulting co.,Ltd

      Oct 2018 - May 2019
      Project Manager

      As a project manager and responsible for the projects of drainage system in Chiayi CountyAccomplishmentOpen contract of Area Drainage system in Chiayi county in 2018 & 2019

    • 台泥綠能股份有限公司/TCC GreenEnergy, Ltd.

      Jun 2019 - Mar 2022
      土木結構主任/Civil and Structural Director

      1. Responsibilitiesa. As a director and take charge of civil/structural/geotechnical/fundamental/underground pipe line engineering of green and renewable energy project.b. Technical document review based on global or Taiwan code. c. Supervision of construction schedule and quality control on site.d. Green and renewable energy potential assessment of the sitee. Project manager of Yangping Geothermal Power Plant2. Accomplishmentsa. Changhua Costal Park Wind Power Project, 7.2MW(台泥綠能彰濱廠區風力發電一期,7.2MW)b. Changhua Costal Park Solar Power Plant Stage 1&2, 12.1MW(台泥綠能彰濱廠區第一及二期太陽能光電廠,12MW)c. Rooftop Solar Power, 2.2MW(台泥集團太陽能屋頂平貼型發電,2.2MW)d. Chang-Wang Wind Power Project, 14.4MW(彰旺風力發電,14.4MW)3. Project in processa. Chiayi Fishery Solar Power Plant Stage 1, 43.4MW(台泥嘉謙綠能-嘉義義竹漁光案,43.4MW)b. TCC RMC Roof Solar Power Project, 2MW(台泥集團水泥製品廠太陽能屋頂棚架型及平貼型)c. Yanping Geothermal Power Plant, 1MW(延平地熱發電,1MW)d. Changhua Costal Park Wind Power Project Stage 2, 10.8MW(台泥綠能彰濱廠區風力發電二期,10.8MW)e. Chiayi Fishery Solar Power Plant Stage 2, 22.5MW(台泥嘉謙綠能-嘉義漁光案二期,25MW) Show less

    • 空氣化工產品有限公司

      Mar 2022 - now

      2 sets of PHG830 will support TSMC F18P9 for Hydrogen gas.1. First case as a whole project PEM in TW, lead all engineer functions included foreign design centers to complete the project.2. As a local PEM, discuss and coordinate with local design institute3. Work with PM & CM to handle the whole project, make it workable and cost less4. Construction quantities control5. Site survey NK9, with 2 sets of 560m3/hr LAR production equipments, is a suppiler of TSMC Tainan base1. Discuss and coordinate with local design institute2. Work with PM & CM to handle the whole project, make it workable and cost less3. Construction quantities control

      • Project engineering manager

        Jun 2024 - now
      • Project engineering manager/Senior civil/Structural/geotechnical engineer

        Mar 2022 - now
    • DASE Global

      May 2023 - now
      Senior Geotechnical Consultant

      As an individual geotechnical specialist/consultant in Taiwan, the duty is to help client solve the geotechnical issues and interpret geotechnial factul/analysis report for client for better understanding. Meanwhile, the provision of necessary design parameters are also needed for abroad design team to finish the foundaion design, such as mat-pile foundation system.

  • Licenses & Certifications