Devnarayan Singh

Devnarayan Singh

Engineear Tranee to Sr.Engineear Production

Followers of Devnarayan Singh850 followers
location of Devnarayan SinghPalwal, Haryana, India

Connect with Devnarayan Singh to Send Message

Connect

Connect with Devnarayan Singh to Send Message

Connect
  • Timeline

  • About me

    General Manager Manufacturing | Mechanical Engineering

  • Education

    • Zakir Husain Colledge Of Engg. & Tech. AMU Aligarh.

      1986 - 1991
      Bachelor's degree Mechanical Engineering

      Activities and Societies: Mechanical 1985 to 1990

    • AMU City High School

      1980 - 1983
      AMU City High School Aligarh Science Schooling

      Activities and Societies: I passed my 10th from AMU City High School, G.T.Road Near Exhibition Ground Aligarh. in 1983

  • Experience

    • Usha International

      May 1991 - Oct 1996
      Engineear Tranee to Sr.Engineear Production

      A company performing the job for Hindustan Aeronautics Ltd. India in making different components of planes and Turbo dynamics by managing 325 technical floor workers.

    • Golden Engineering Works

      Nov 1996 - Jun 2003
      Sr.Mech.Engineear (Tender & Works)

      This company is especially famous for the Maintenance and manufacturing of Power plants spares & Specially Conducting Regular Maintenance Work in Hydro Power Generation, Thermal power Generation, Super Thermal Power Generation, Atomic power Generation projects after procuring tenders. They are also famous for the manufacturing of BFP & CFP and other pumps accessories.I Performed as. Filing Tenders in various power plants conducting biding, finalizing comparatives of tenders, handling of shutdown emergency jobs and controlling overall site working of different sites in control making all compliance of labor law department accordingly.Supervision of the fabrication work , Manufacturing & Maintenance Processes.Preparation of Detail Drawings & Assembly Drawings of Complete BFP & CFP Machine,during the job i attended hundreds of power plant for maintenance. Show less

    • Virraj Steel & Energy Ltd

      Jul 2003 - Jul 2005
      Dy.Manager Projects

      Assistance to GM Projects, Preparing of daily execution chart & Reports, Negotiate in tender placing of mechanical instrumentation requirement to concerned suppliers, Quality checking of supplied goods, quality checking of contractors work, Mainly Vender Development.Erection activities of entire plant in mechanical scope.Preparation of Machine Foundation Drawing & Checking of Machine layout drawings those came from different suppliers company.Technical Meeting with team and Consultants Engineers.Technical Meetings with site contractors.Complete Fabrication & Erection work of Sponge Iron Plant Cum fire tube Boiler (IBR)complete Erection work of overhead crane, Preparation of Material Requirement List & Checking & passing of Contractor Bill Show less

    • Indian Construction Company (P) Ltd

      Aug 2005 - Oct 2006
      Regnal Coordinator PROJECTS ( PB,HR&HP)

      Timely execution of the Turnkey Contracts on Cross country Pipe line / Effluent Treatment Plant, this include, follow up for preparation of drawings and follow up with client / consultant for approvals, negotiate and release purchase orders on approved vendors for manufacture and supply, follow-up for timely manufacturing, arrange inspection and then dispatch to site, erection contract finalization, visit sites regularly for erection and commissioning of the plant in schedule time.• Follow up for supply and erection payments, collection of all bank guarantees• Relocate site staff to other project sites. Company has done more than 100 projects in different areas of the country like (BHEL, Ranbaxy Laboratories Ltd., HONDA SEIL, Nuclear Power Corp. (RAPP), Modern Suiting Ltd., Century Pulp & Paper Ltd., Roulunds Braking India Ltd., Samsung Electronics India Pvt. Ltd., LG Electronics Pvt. Ltd., Hindustan Times Ltd., Taper Milk Production Ltd. ,Vindhayanagar NTPC, Punjab agro juices Ltd. At HSP & Abohar, Ranbaxy Mohali, PACL Nangal, Ashoka Leyland Panthnagar, etc. Show less

    • Dee Devlopment Engineers Ltd.

      Nov 2006 - Apr 2007
      Dy. Manager Projects

      Execute Turnkey Projects in Pipeline,Dual cycle Gas turbine Pressure piping• Actively involved in expediting design, purchase, manufacturing, coordination with clients and consultants for third party inspection,• Organize timely dispatch, billing Targets & Inter department Coordination since Procurement till Dispatch.

    • KORDANSKY PROJECTS(P) Ltd

      May 2007 - Sept 2011
      GM Works

      A Sister Concern Company of ICCPL. Hear i Develop procedures for project planning, scheduling, budgeting, billing,execution, procurement, expediting, reporting, resource mobilization, cost controls,ensures compliance by the project teams; Evaluating resource requirement and mobilization in light of the manpower productivity as well as the productivity . Analise contract commercially legally & clarify open points; Setting up a task force for the project,establish role clarity for each member; Conduct project risk analysis,finalize mitigation plans,review of same during course of execution of projects;Ensure successful and timely execution of processes /systems / procedures for the Projects;Oversee and monitor project progress of various sites with the Project Managers / project team at regular intervals to ensure that the project milestones are achieved and completed on schedule;To interact with Customer on project status,;Take corrective measures, develop and implement contingency plans with the project team;Review project profitability on a monthly basis;Monitor material wastage, manpower and P&E productivity.Comply to Country wise/region wise local laws, standards and local requirements.Ensure compliance to processes and defined quality standards and implementation of quality measures by the various project teams. Ensure timely preparation and submission of costing reports, operational reports, budget cash flows, billing reports, etc. with the PMs;Accountable for the contractual, financial, statutory, quality, safety, security and operational requirements and delivery of the projects with respective PM;Initiate changes in system procedures within department for effective project management;Putting in place a project closure system;Close project organization & transfer Project manager and team;Organise timely dispatch, billing, erection, commission, and final handing over of plant for use to customer and follow up by collecting payments and bank guarantees. Show less

    • Isolloyd Engineering Tech.Ltd.

      Oct 2011 - May 2012
      Dy.GM Works

      A Subsidiary Unit of Lloyd Insulation India Ltd. A 5000 Corer Group Serving in Power Sector since last 52 years by providing Hot ,Cold and Sound Insulation Equipments Technologies & PEB. to various reputed clients ie. BHEL ,L&T, Gammon India ,Hitachi Japan, GE USA etc. .Making Heat , Cold and Sound Enclosures of various power plant Equipments.Over all project Planning & Monitoring on daily, weakly & monthly target bases with all records as per ISO 9001,Techno Commercial review under the parameters of manufacturing capacity, Drawings/Technical Specs, availability of specific raw material, packing material, manpower etc Considering the Commercial inputs & Payment terms.Review of BOM Customer vise approved the same If deviation observed conduct meeting with the client to ensure smooth production and product activities, review the priority of the project and same to be implemented on shop floor ensuring the sequence of the production in accordance with flow chart / Q.A.P . Conducting/ Co coordinating with client site personal for smooth erection and commissioning activities.Techno Commercial & Admin of Acoustic Encloser Div Show less

    • Enviropol Engineers P Ltd

      Jun 2012 - Dec 2015
      Dy.GM Works

      • Timely execution of the Turnkey Contracts of Air/Ash pollution treatment Systems of Boiler exhaust and WTP, this include, follow up internally for preparation of drawings and follow up with client for approvals, contract followup for executing work at works, placing purchase orders for material, follow-up for manufacturing, erection and commissioning of the plant in schedule time• Follow up for supply , erection and Quality related guidelines at works.Over all project Planning & Monitoring on daily, weekly & monthly target bases with all records as per ISO9001,Techno Commercial review under the parameters of manufacturing capacity, Drawings/Technical Specs, availability of specific raw material, packing material, manpower etc Considering the Commercial inputs & Payment terms Total Control of Plant respect to Techno & Admin Operations. Show less

    • Food & Biotech engineers India (P) Ltd

      Jan 2016 - May 2019
      General Manager Manufacturing

      Looking both Production & Quality ,See www.foodbiotech.co.in

    • S. S. Gas Lab Asia Private Limited, Delhi

      May 2019 - Feb 2020
      General Manager Works
    • S S V VESSELS Private Limited

      Mar 2020 - now
      General Manager Manufacturing
  • Licenses & Certifications

    • Honers

      Aligarh Muslim University
  • Volunteer Experience

    • Safty Rules

      Issued by Isolloyd on Oct 2011
      IsolloydAssociated with Devnarayan Singh