
Timeline
About me
Mechanical Engineer
Education

University of indonesia
2014 - 2018Bachelor's degree mechanical engineering 3.47
Sma negeri 39 jakarta timur
2011 - 2014Natural sciences
Experience

University of indonesia
Feb 2016 - May 2016Assistant lecturer of mechanical visualization and modelling-Monitor mechanical student in every project-Create 3D design in autodesk inventor

University of indonesia
Sept 2016 - Dec 2016Assistant lecturer of engineering drawing-Monitor mechanical student in every project-Guiding student by holding assistance

University of indonesia
Feb 2017 - Apr 2017Laboratory assistant of metrology & measurement-Operate & control surfcom as measument tool-Measure roughness of Al plate-Create the report

Pt pgas solution
Jul 2017 - Sept 2017Maintenance engineering intern-Responsible in Gas Chomatograph Maintenance at gas transmission station, Muara Bekasi. -Create RCM assessment to Gas Chromatograph -Risk assessment pipeline in bekasi region-Calculate lifetime of pipe based on corrosion factor
.webp)
Pt.pertamina (persero)
Aug 2018 - Jun 2019Hsse m&t-Control & Monitor Health & Safety program on Pertamina MOR III-Create HIRADC (Hazard Identification Risk Assessment & Determining Control) for 13 bussiness unit on Pertamina MOR III-Control & monitor 12 life saving rules implementation at Pertamina MOR III environment

Pt. rekayasa industri
Jun 2019 - Jul 2022Project : CDU Revamp Project Pertamina RU VI Balongan- Phase 1In charge as Field Coordinator for Pumps during Turn Around phase on Refinery RU VI Balongan. There are 14 pumps package, each pump consists of 11 package OH2 & 3 package BB2 of API 610 Centrifugal pumps. As Field coordinator, main responsibility to be handled are:1. Supervise sub-contractor & develop construction method since erection, demolish/replacement existing pumps until final alignment & Site Running Test of pumps2. Control the logistic of all pump's material is well received & completed for installation phase.3. Coordinate with construction team for all activity of construction shall be done based on schedule. 4. Monitor & troubleshoot pump performance during start-up & commissioning phase. Show less Project : CDU Revamp Project Pertamina RU VI Balongan Phase-1-Responsible as Rotating engineer for API 610 BB2 type pumps & Barepumps1. Two typical BB2 pumps completed with sealplan (API 682) & pressurized oil system (API 614), motor driven pump with power 800 kW. These pumps will be handled crude oil with high temperature 200 degC2. Barepumps, consists of two type API 610 OH2 & BB2, those pumps will be installed with new baseplates & existing driver.- Mechanical Activity 1. Prepare datasheet, requisition, technical bid evaluation & vendor print check.2. Review & check vendor data document as per standard, project specification or FEED documents during detail engineering.3. Coordinate & interface to other discipline to ensure all technical matters is corrected4. Monitor fabrication process & Factory Acceptance Test.5. Solving Problem for mechanical issue during engineering or construction phase. Show less Project : RDMP RU V Pertamina Balikpapan Project-Responsible as Rotating & Packaged engineer for pumps & compressors, those equipments that i handled are: 1. IAPA Package, consists of six Integrally Geared Centrifugal Compressor(API 672) each compressors have 2.7 MW power consumption & two trains dryer to produce Plant & Instrument air for plant utility purpose.Those compressors are driven by steam turbine (API 611) & IEC Motor. 2. API 610 Pumps, BB1, VS4 & VS6 type. These pumps will be installed with complete seal plan & lubrication system.3. Emergency Air Compressor Package, consists of screw compressor manufacturer standard completed with API 614 pressurized lube oil system and air dryer system to produce instrument air during black startup & black out plant condition.- Mechanical Activity 1. Prepare datasheet, requisition, techincal bid evaluation & vendor print check2. Review & check vendor data document as per standard, project specification or FEED documents during detail engineering.3. Coordinate & interface to other discipline to ensure all techical matters is corrected4. Monitor fabrication process & Factory Acceptance Test.5. Solving Problem for mechanical issue during engineering or construction phase Show less
Field Coordinator
Feb 2022 - Jul 2022Rotating Engineer
Apr 2021 - Jul 2022Rotating & Packaged Engineer
Jun 2019 - Jul 2022

Tripatra
Jul 2022 - nowMechanical rotating engineerResponsible as Rotating Engineer in some Projects :1. BDEP SHELL Chrysalis2. FEED TPPI OLEFIN3. FEED KIDECO O&M (Fuel Facility Improvement)4. PROPOSAL EPC TPPI OLEFIN5. FEED TOTAL PNG Phase-26. EPC MEDCO E&P Dayung Facilities Optimization (DFO)7. EPC AKASIA BAGUS Project - PT Pertamina EP8. PROPOSAL EPC Polypropylene Plant Balongan (PPB) Project - PT Polytama Propindo9. FEED SAF NS1 Project (Green Refinery)10. APA EPCI of a FPSO for ENI Kutei Project11. PROPOSAL EPC REPSOL Sekakemang12. FEED Green Refinery Cilacap (GRC) RU IV Cilacap - PT Kilang Pertamina Internasional Show less
Licenses & Certifications
.webp)
Sertifikat pelaksana utama pemeliharaan pltd (pembangkit listrik tenaga diesel) - level iii
Ministry of energy and mineral resources (esdm)Aug 2022
Volunteer Experience
Head of Sports & Arts Department
Issued by Ikatan Mahasiswa Mesin (IMM) FT UI on Dec 2015
Associated with Ary Virgiawan ZaelaniHead of Operations - PATO FTUI
Issued by Universitas Indonesia on Sept 2015
Associated with Ary Virgiawan ZaelaniStaff of Sports Department
Issued by Badan Eksekutif Mahasiswa FTUI on Jan 2015
Associated with Ary Virgiawan ZaelaniVolunteer - KERSOS FTUI
Issued by Badan Eksekutif Mahasiswa FTUI on Jun 2015
Associated with Ary Virgiawan ZaelaniVice Project Officer - Mechanical League
Issued by Ikatan Mahasiswa Mesin (IMM) FTUI on Oct 2015
Associated with Ary Virgiawan ZaelaniEvent Committee - Rekinnovation 2020
Issued by PT. Rekayasa Industri on Oct 2020
Associated with Ary Virgiawan Zaelani
Languages
- enEnglish
- jaJapanese
- baBahasa indonesia
Recommendations

Ashumi jhaveri
Sustainable Architect and Permaculture DesignerSurat, Gujarat, India
Abrham negash gelan
Aspiring Software Engineer | Recent Computer Science and Psychology GraduateArlington, Virginia, United States
Muhammad masood aslam
Chemical Engineer at Besmaya Power Station 4500MWatt in Baghdad-iraqPakistan
Tejas more
Service now, GRC and BMC Remedy and ITSM administrator in PwCPune, Maharashtra, India
Javier m.
Water Quality Manager at Montgomery County Parks DepartmentWashington DC-Baltimore Area
Wojciech wszołek
Product OwnerCracow, Małopolskie, Poland
Albert waters
Peace Corps Volunteer working with communities to improve rural water access and treatmentPeru
Robin singh
Software Developer @ PC Solutions | React.js | TypeScript | SPFx | Sharepoint Online | Power Apps | ...Delhi, India
Erik rogério
Assistente Administrativo | Estudante de Engenharia EletrônicaCanoas, Rio Grande do Sul, Brazil
Dalma deák
Frontend Developer at Novin Bt.Budapest, Budapest, Hungary
...