    Construction Manager EHV/HV Substation/SEC Approved (Open to Opportunities)

  • Education

    • Balochistan University of Engineering and Technology

      1999 - 2003
      Bachelor of Engineering - BE Electrical and Electronics Engineering
    • Mehran University Of Engineering and Technology, Pakistan

      2005 - 2006
      Post-Graduation Diploma in Electrical Power Electrical Power
  • Experience

    • Unicom Pakistan

      Jan 2005 - Nov 2006
      Site Manager

      Wateen Telecom Long haul Optical Fiber Networking Project in Sindh PakistanSite Supervision Quality.ReportingCoordination with Client and contractor.

    • Konnect Holding Pvt Ltd (Unicom Pakistan)

      Nov 2006 - Aug 2007
      Unit Manager(O&M)

      WateenTelecom Long haul Optical Fiber Networking Project Pakistan

    • Al Mashariq Company

      Aug 2007 - Aug 2014
      Site Manager/ Electical Engineer

      Approved by Saudi Electricity Company (Govt.) as Site In-charge, Project Site Manager, Site Engineer & QA/QC Engineer for different substation turnkey projects.-NGSA Work Permit Holder, Liaising with government authorities for work permit, PTW/outages and arranging temporary access to work in existing substation.-Overall substation construction activities including Electrical, Civil, Mechanical.-Overall supervision for construction, erection& installation of Major equipment for Substation construction, with light of Approved International Engineering Standards& Transmission line works of 230kV.-Preparation of documentation like work schedules, subcontracting plans, progress reports, -Preparation of inspection report/documentation (RFI) other reports required by higher management.-Allocation of Man Power as per quantum of work.-Managing operations involving resource planning, materials planning, team building.-Handling Base design, Detail Design and IFC coordination between vendors and client.-Perform quality Assurance/ Quality Control (QA/QC), filed inspection & progress reporting.-Handing over spare Parts & dismantling material to client.-Installation of GIS (Gas Insulated Switchgear) make, of different make 380kV, 132kV, 115kV and 110kV (Gas Insulated Switchgear.) Substation.-69kV, 33kV 13.8kV Switchgear Installation.-Control – Relay Communication Panels Installation.-Shunt Reactor, and Capacitor Bank Installation.-EHV Cable Pulling though Tunnel & Trench.-Installation & Assembly of Power Transformers of different make HHI, Best.-ACDC system installation, Cable Ladders, Cable race ways like conduct work, Main Groundings in New Substation & Lightning system as per approved drawings. Communication System, Gantry Installation. New Free Standing CTs & new CVTs, New Bushing Current Transformer in Oil Circuit Breakers, New SF6 115kV outdoor CB, Switchyard, MV Service Transformer Installation, lighting & small power systems, and etc Show less

    • Alstom Grid

      Oct 2014 - Dec 2016
      Site Manager-Electrical

      Overall construction Management New and Substation Projects, As Approved Site ManagerAlstom 380/132kV GIS and GIBs-Alstom Transformer Installations .- Schneider 69kV Switchgear Installation.-Interfacing between 69kV to Transformer.- 380kV cable installation-69kV 33kV &13.8kV Cable installation-Alstom 132kV GIS Extension work (coupling of Extension Bay)-Capacitor Bank Installation.Working live substation during Outage.-Control cable interfacing-Cable tray installation-Cable support structure-Cable and conduit schedule.-Perform quality Assurance/ Quality Control (QA/QC) & Safety.-Cable Ladders, Cable race ways like conduct work, underground concrete duct banks and cable trenches. Main Groundings in New Substation & Lightning system as per approved drawings.-Coordination with contractors sand sub-contractors at site.-HVAC ducting, Installation and Wiring of SUMP Pumps.-HVAC control panel, accessories, connecting the HVAC panels.- Gantry Installation. New Free Standing CTs & VTs, SA. New Bushing CT Etc Show less

    • WorleyParsons

      Mar 2016 - Mar 2017
      Construction Supervisor-Electrical

      Overall supervision for Construction, erection& installation of EHV Substation , PP13 CCPP.Installation of GIS (Gas Insulated Switchgear) make, of different make 380kV/132kV (Gas Insulated Switchgear.) & AIS Substation.• Supervision of Substation EHV installation of HHI GIS Equipment, SGT 380/132/13.8 kV 502MVA transformer installation• Facilitate all control interface wiring between the GIS, LCC panel, and Alstom protection panels• Facilitated all interfacing between PP13 Substation to PP12 Substation and Power Plant.• All 380kV cable installation• All 13.8kV Cable installation• All control cable interfacing• Cable tray installation• 380kV cable support structure• SGT installation. Including supports structures for cabling, GIB’s, etc…• Cable and conduit schedule13.8kV Switchgear Installation.Supervise and coordinate Major equipment for Electrical & Mechanical installations for:• All controls and electrical interfacing between the PP13 Substation to PP13 Combine Cycle Power Plant and PP12 Substation/ Combine Cycle Power Plant for backfeed capabilities.ACDC system installation, Cable Ladders, Cable race ways like conduct work, underground concrete duct banks and cable trenches.Mechanically knowledge of (erecting of PACU units, HVAC control panel, accessories, HVAC ducting, Installation and Wiring of SUMP Pumps.Fire Alarm& Fighting System (Installation of Detectors, Flame Detector, Smoke Detector, Bells with Strobe type connecting with existing system by auto dialer installation as per Approved Drawings, Show less

    • MSK- GE Grid Solutions

      Nov 2017 - Oct 2019
      Site Manager 380/110kV GIS/AIS/Static VAR Compensators SUBSTATION

      • Overall Site Managment for Construction, erection& installation of SVC Project.• Supervision of Substation EHV installation of Alstom(GE Grid Solution) GIS & Dynamic Static VAR Compensators(SVC) Equipment, installation• Cooing System, Fire Fighting system• Cable and conduit schedule, Cable tray installation• 13.8kV Switchgear Installation.• Supervise and coordinate Major equipment for Electrical & Mechanical installations.• Quality Management, Work planning. Resource Management.• Preparation of project progress reports.• Review and approve the Electrical Material and Equipment’s according to specification.• Monitor progress of cable schedules produced by contractors.• Review project drawings and apply standers and specifications.• Reporting to director projects update of risk notices and NCRs.• Follow-up implementation of project quality and safety plan. Coordinating with vendors and contractors to resolve quality and construction issues.• Follow up deliveries as per orders placed to suppliers. Coordinate and follow-up the materials from the head office and return to stores. Maintain customer satisfaction by providing technical solution and timely completion of project targets. Coordinates with Client for any site instructions and inspection of Works. Monitoring subcontractor like HVAC & Small power lighting for their daily activities & progress. Monitoring & Control of resources such as manpower, materials, consumables, equipment, tools, etc., required for substation related works prior to execution. Monitoring daily installation and testing activities and verifying that it complies with the project specification.• instrumentation cables, lighting works including installation of lighting fixtures for indoor & outdoor.• Installation of (cable trays/ ladders, conduits) for power, control Show less

    • GE Grid Solutions

      Oct 2019 - Jul 2023
      Construction Manager Faisalabad West 500/220/132 kV Substation

      • Served as Construction Manager 500/220/132kV AIS Substation with responsibility to plan and execute the projects within assigned timelines and budget.• Ensured that installation and operations conform to standards and customer requirements by reviewing electrical systems specifications, technical drawings, and topographical maps against standards.• Coordinate construction on the project which includes coordinating compliance with the schedule, safety, cost, and quality decisions in conjunction with the Project Field Manager.• Supervise & mentor all superintendents; monitors their activities and provides leadership.• Coordinate with procurement Manager to review all site procured materials for acceptance.• Responsible for the delivery of the EHV Works including management, quality, and construction in accordance with the Project Documents• Overseeing the logistical requirements of a project including the ordering and delivery of building materials and equipment.• Supervising the activities of subcontractors and other team members.• Regularly reporting on progress.• Reviewing timings, budget, labor, risk, and project plans to ensure work stays on track.• Resolve safety & quality issues with the safety & quality managers. Show less

    • Marubeni Corporation

      Jul 2023 - now
      Construction Manager 500kV Hybrid-GIS Substation

      • Construction, Installation, testing & Commissioning of 500kV Hybrid-GIS, AIS & 230kV AIS Substation.• Manage & coordinate all on-site subcontractor activities for compliance with the CPM schedule; Monitor & enforce compliance with subcontract requirements; Implement the Project Construction Execution Plan.• Supervising the activities of subcontractors and other team members.• Regularly reporting on progress

  • Licenses & Certifications

    • Alstom International EHS Passport

    • Basic Electrical safety Awareness (BESA

    • E-Learning High Risk Activates

    • Field Activities

    • OneWay Risk Management