    Welding inspector/ Piping inspector.

  • Education

    • Asia e university

      2013 - 2015
      Executive bechelor in managment human resourse managment
  • Experience

    • Airpex m&e sdn bhd

      Jan 1993 - Apr 1994
      Qc inspector for structure (sub contractor)

      GUNTUNG D (EPMI) PLATFORM & BRIDGE Scope of workResponsible for all Quality Control as per test planMonitoring all production activities until finish product,Monitoring all quality plan ,like fit-up visual, welding activities and documentation.

    • Kejuruteran abadi sdn bhd

      Jan 1993 - Nov 1993
      Semi skill fitter piping (sub contractor)

      DULANG C (PETRONAS CARIGALI) Scope of worksPiping installation , piping support installation. Mark and cut,

    • Airpex m&e sdn bhd

      Jan 1994 - Mar 1996
      Qc structure (sub contractor)

      M1&M3 Living Quaters ( Sarawak Shell Bhd) Sime Sembawang Eng Pasir Gudang ,Johor.LAWIT – A Promet Fabricator Sdn Bhd at Teluk RamuniaJohorScope of workMvr,Fit-up and Visual Inspection ,dimensional check before and after weldingNdt and documentation.Responsible for all quality as per test plan

    • Multiforce engineering sdn bhd

      Jan 1994 - Nov 1994
      Qc assistant (sub contractor)

      M3PQ-A Intergrated production Module(Sarawak Shell Berhad) Scope of workMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test plan

    • Kay well engineering sdn bhd

      Jan 1994 - Jan 1994
      Qc structure for jacket (sub contractor)

      M3-DR-A JACKET(Sarawak Shell Bhd) at Promet Fabricator Sdn Bhd Teluk Ramunia JohorScope of workMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test plan

    • Fmc petrolium equipment (m) sdn bhd

      Jan 1996 - Feb 1998
      Qc inspector

      Marine Loding Arm Project Marine Loding Arm involvedNKK Thailand project 3 armGasos for Kuwit 3 arm,KNPC project 3 armChyoida Melaka TNTC 3arm ,Van Ommeron Singapore 3armHyundai Korea 3 arm,Shenzen China 3 armMetalic Petronas 3arm ,Bintulu (JGC) 3 armPetrobras Brazil 2 arm ,Bharat Shell India 2armModec 3 Base riser ,Qatar 2 arm ,L .Givina Vietnam 2 armScope of workCheck incoming material ,fit-up and visual inspectionCheck dimensional check before and after welding, Request for NDT if any, Witness NDT process like dye penetration, for siling surface (swivel and flanges)Witness for hydrotest ,numetic test,and function testCheck calibration certificate for pressure gauge and other equipmentCheck welder qualification recordRe-visual for material before blasting paintingCheck surface material after blasting with profail gaugeCheck Dft (dry filem thickness) and X cross cut after painting.Record all Dft. (dry filem thickness)Install all mechanical and electrical equipmentCheck function test. and filing MDR Meno dettagli

    • Airpex m& e sdn bhd

      Jan 1998 - Jan 1999
      Piping qc ( sub contractor)

      Resak RCPP (Petronas Carigali) Scope of workMvr,Fit-up and Visual Inspection ,dimensional checkRequest for Ndt asper NDT requirementCheck NDT status before hydrotest ,line workCheck flusing activities and hydrotestCheck punchlistCheck calibration certificate Documentation

    • Cyclect company (m) sdn bhd

      Mar 1998 - Jan 1998
      Assistant production supervisor(sub contractor)

      Titan Cracker No 2( Pressure Vessel Platform)Client – Japan Gaslin Coperation(JGC)Scope of work.Plan and duty roster to meet production scheduleresponsible all Quality for over Quality Control/assurance of raw material in process and finished product to ensure that production schedule and qualityperforming any other duties assigned by the management

    • Ate engineering sdn bhd

      Jan 1999 - Jan 2000
      Materials controller

      Fan Cooler projectScope of workMaterial identificationMark and cut asper drawingSent material to snc Machine

    • Airpex m& e sdn bhd

      Jan 2000 - Mar 2002

      SATELLIT PROJECT( EPMI) HELANG PROJECT (NIPPON OIL)Scope of WorkMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test plan E-11P-A SARAWAK SHELL BERHADScope of workMvr,Fit-up and Visual Inspection ,Request for NDT Check NDT status before hydrotest ,line workCheck flusing activities and hydrotestCheck punchlistCheck calibration certificateCheck reinstatement after hydrotestDocumentation Larut - A project (EPMI) Scope of workMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test plan

      • Structure QC (Sub Contractor)

        Nov 2001 - Mar 2002
      • Piping QC (Sub Contractor)

        Jan 2000 - Jan 2001
      • Structure QC (Sub Contractor)

        Jan 2000 - Nov 2000
    • Land survey management

      Jan 2002 - Jan 2004
      Qc inspector

      North Lukut & Penara(Petronas Carigali)Scope of work at OnshoreMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test planScope of work at OffshorePipeline Installation and Inspection for all activities for pipeline installation 8”& 12”Fit-up ,visual inspection and check Ndt report alsowitness holiday testMonitor welding activitiesWitness for dewatering ,drying and swabbing process for pipelineHook-upCheck fit-up, visual and witness ndt for pipe conductorMake red line marking all modification platformDocumentation.CommissioningCheck pipe spool installation ,witness flushing ,hydrotesting and leaktestCheck punchlist and other equipment if damage and make red line marking for all modificationTouch –up paint on surface pipe spool.Check radiography report, fit-up report,visual report before hydrotestCheck calibration certificate equipment before hydrotest and documentation Meno dettagli

    • Edward and son engineering

      Apr 2002 - Jan 2002
      Qc coordinator (sub contractor)

      Tapis F, (Exxon Mobil) Scope of workResponsible for all Quality Control as per test planMonitoring all production activities until finish product,Monitoring all quality plan ,like fit-up visual, welding activities and documentation.

    • Land survey management sdn bhd

      Jan 2004 - Feb 2005
      Qc structure (jacket & pile make-up)

      Bunga Raya E-Jacket Client – TalismanScope of workMvr,Fit-up and Visual Inspection ,Dimensional check before and after weldingNdt and documentationResponsible for all quality as per test planMonitor project welding quality

    • Land survey management

      Jan 2005 - Jan 2005
      Structure qc hull

      Turkimenistan Project(Mataguly Drilling riser a)Client – Petronas Carigali Sdn Bhd Scope of workResponsible for all Quality Control as per test planMonitoring all production activities until finish Prepare red-line markingMonitoring welding repair if anyDimensional control before and after weldingMonitoring all quality plan ,like fit-up visual, welding activities and documentation

    • Nusa damai engineering (m) sdn bhd

      Apr 2005 - Jan 2005
      Mechanical foreman

      E-8 DR-A Sarawak Shell project Client – Sarawak Shell BerhadScope of workTesting commissioning for E-8 DR-A projectCrane installation ,aligment pump,test run diesel generatorVessel Cleanning , Vessel tank installation ,Check punchlist

    • Land survey management

      Jan 2006 - Mar 2006
      Structural qc(topside)

      Kikeh Dry Tree Unit Client- TechnipScope of workResponsible for all Quality Control as per test planMonitoring all production activities until finish Prepare red-line markingMonitoring welding repair if anyMonitoring all quality plan ,like fit-up visual and documentation

    • Land survey management

      Apr 2006 - Feb 2007

      Staybrow &Kikeh EPSO TURETClient -FMC, SBMScope of workMonitoring all production activities like welding,ndt until finished productResponsible for all quality as per test plan Review NDT reports on welding work for which the Weld Inspection level 2 is responsible; Check punchlist ,witness hydrotesting and flushingCheck status ndt before hydrotestCheck calibration certificate before hydrotestMonitoring welding repair and do revisual inspectionMonitoring welding activities at night shift asper request. Meno dettagli

      • QC inspector (piping)

        Jan 2006 - Feb 2007
      • Structure QC

        Apr 2006 - Jan 2006
    • Ellite cwi sdn bhd

      Mar 2007 - Mar 2008
      Welding inspector and structure qc

      Mopustor tank Client – Single bouy moring (SBM)Scope of workResponsible for all Quality Control as per test planMonitoring all production activities until finish ,Check status ndt before major liftingDimensional check before and after welding Monitoring welding repair if anyMonitoring all quality plan ,like fit-up visual, welding activities and documentation.Ensure that the requirements for all weld, welder and welding activities are correctly specified and carried out in accordance with the relevant codes, client specifications and contract standards.Confirm during welding that only specified and accepted welding procedures (approved by the appropriate quality, technical or regulatory authority) are used and applied Preparation of inspection reports such as daily welding reports and all related documents. Daily surveillance of daily welding and welding consumables. Monitoring weekly and monthly welder’s performance. Meno dettagli

    • Velosi(m) sdn bhd

      Apr 2008 - Jan 2009
      Senior engineering inspector (sarawak shell bhd)

      B11-Sub structure Jacket & Topside Scope of workInspectionPlan, organize and implement a system of quality control over the welding and inspection process; Review Drawings, Specifications and Procedures to ensure project requirements are implemented correctly. Witness welding procedure and personnel qualification and testing and evaluate acceptability. Verify materials, consumables, fit-up, welding, repair work, weld profiles and work completion is in compliance with project requirements. Checks to ensure workmanship practices are correctly and consistently applied throughout steel work fabrication, verification and testing. Ensure qualified and approved welding procedures and personnel are correctly assigned to the work. Verify and monitor material tracking, weld and NDE traceability, and correct identification of carry over work. Supervise Weld Inspection Level 1 and Weld Inspection level 2 personnel; Verify structural materials and weld consumables are in compliance with the project requirements. Dimensional checks to verify as-built butt alignments and cruciform alignments are within the allowable tolerances. Review and comment on Structural drawings and Specifications. Review status of final NDE reporting and results. Check punchlist and identify and prepare a list of outstanding structural items Documentation. Meno dettagli

    • Oceancare corporation sdn bhd

      Jan 2009 - Jan 2010
      Senior engineering inspector (sarawak shell bhd)

      July 2009-Oct2010B11-KA TopsideScope of workInspection for structure asper code Aws D1.1 Review and comment on Structural drawings and SpecificationsVerify incoming materials and weld consumables are in compliance with the project requirements Understand and discharge all of the responsibilities for Weld Inspection level 2; Review radiography film and monitoring welder rejection rateReview welding inspection reports, verify welder performance qualification Verify implementation of nondestructive and destructive evaluation methods Verify visual inspection requirements asper client specification.Verify NDE requirements and ndt operator qualificationConfirm that welding equipment used for the work is in good conditionDocumentation and punchlist Meno dettagli

    • Kpoc project (kbb petroleum)

      Apr 2011 - Jan 2012
      Structure inspector

      Inspection for structure asper code Aws D1.1&PTS,EMUA 158All activites follow as per test plan(ITP)Check and witness for incoming material inspectionCheck dimensional mark and cut(MVR)Check consumable control,storage and handling.Verify that joint preparation and fit-up are in accordance with specifications; Preparation of inspection reports such as daily welding reports and all related documents. Daily surveillance of daily welding and welding consumables. Monitoring weekly and monthly welder’s performance. Witness WQT(Welder qualified test) and WPQT .Control and monitoring dimensional before and after welding Monitoring welding repair and do revisual inspectionMonitoring welding activities at night shift asper request.Monitoring all quality plan ,like fit-up visual, welding activities Documentation. Meno dettagli

    • Oceancare corporation

      Jan 2012 - Jan 2014
      Lead engineering inspector/senior welding inspector

      Working at f14& f29 Sarawak shell project .for Topside ,module ,jacket and subsea (plet) .AWS D1.1&SES 10.1,EMUA 158DEP 30.10.00.01 for Piping.All activites inspection follow as per test plan(ITP)Review of inspection reports such as daily welding reports and all related documents. Monitoring weekly and monthly welder’s performance. Control and monitoring dimensional before and after weldingCheck consumable control, storage and handling.Review radiography film and monitoring welder rejection rateVerify implementation of nondestructive and destructive evaluation methods Verify visual inspection requirements as per client specification.Verify NDE requirements and ndt operator qualificationConfirm that welding equipment used for the work is in good conditionDocumentation. Meno dettagli

    • Crc-evans pipeline international sdn bhd

      Jan 2015 - Mar 2016
      Welding inspector

      Total - Badamyar, Swiber (ONGC),Emas project pipeline.Scope of workAs per code API 1104 21st Edition Sept 2013.Conduct and Inspection WPQT&WQT .Check parameter using ALX Data Logger and U log.Check bevelling before fit-up.Visual inspection.Prepare documentation

    • Worldwide offshore service ltd

      Apr 2015 - Jan 2015
      Qc inspector( pipeline)

      JDA Block B-17&B17-1 Phase 111,Pipeline ProjectCarigali-PTTEPI Operating Company(CPOC)Scope of work.As per code API 1104 21st Edition Sept 2013.AWS D1.1 for structure.Conduct and Inspection WQT ,WPQT for CPOC project.Conduct and monitoring buttering procedure

    • Cc7 chungkuo chemical no 7,rapid steam cracker complex project

      Jan 2016 - Feb 2017
      Steel structure inspector for petrochemical project(rapid)

      Scope of work.• Supervise and witness inspections, check reports and documentation.• Ensure that all sites activities are carried out according to reference documentationfor parts of the plant within his area of responsibility, authorizing their acceptance at quality control completion.• Reinforcing steel and steel structure work, erection inspection ,Alignment check, Bolt tightening etc.• Check project specification, drawing and quality control plans and procedure.• Ensure that the tests, controls and inspection are carried out and that personal have access to all required project documentation.• Check incoming inspection,fit-up,visual inspection and request nondestructive test inspection if any.• Inspection grouting activities and monitor testing.• Documentation Meno dettagli

    • Nsf engineering sdn bhd.

      Mar 2017 - Feb 2018
      Steel structure inspector for dangote clam bouy,plem and pile project (sofec inc)

      • Responsible for all Quality Control as per test plan and monitoring all production activities until finish .• Check status nondestructive test before blasting painting • Dimensional check before and after welding also monitoring welding repair if any.• Monitoring all quality plan ,like fit-up visual, welding activities and documentation.• Ensure that the requirements for all weld, welder and welding activities are correctly specified and carried out in accordance with the relevant codes, client specifications and contract standards.• Confirm during welding that only specified and accepted welding procedures (approved by the appropriate quality, technical or regulatory authority) are used and applied. • Preparation of inspection reports such as daily welding reports and all related documents. • Daily surveillance of daily welding and welding consumables. • Monitoring weekly and monthly welder’s performance.• Check and monitoring leak test activities after visual inspection.• Documentation. Meno dettagli

    • Seconded petronas(ptssb).

      Jan 2018 - Mar 2019
      Welding inspector/ piping inspector.

      Scope of work• Reporting directly to the Site QAQC Discipline Supervisor and indirectly to the Quality Manager.• Check consumable control and material, storage and handling.• Verifying that all necessary inspections and tests, as required of the project requirement.• Monitoring and implementation of WPS Procedures and ITP.• Coordinating quality activities with subcontractors and any other individual parties who may be working on the same site • Coordination with third party inspection, in accordance with approved ITP, for agreed witness inspections & tests• Reviewing Sub contractor Procedures related to Piping Work Fabrication, Construction and Testing including fit-up,visual ,NDT and hydrotest as required .• Review inspection (Hydrotest package before test) & test reports of completed inspections & tests• Ensuring all equipment's, tools and materials meet with the project quality requirements and that personnel have been adequately trained to use them safely• Monitoring Installation of Piping systems and verifying the related QC documentation.• Review of calibrated equipment's and informing Subcontractor QC for expediting arrangements with Calibration agencies for timely calibration of the equipment's. Meno dettagli

    • Mmhe

      Jan 2019 - Jan 2024

      All activities as per test plan (ITP).Check and verify the code or specification that applies for the job is up to date and approved’Check and verify the fabrication or construction drawing are correct and have the latest revision.Monitor report on the fabrication and installation of steel structure.Ensure the material and welding consumables are stored and handled correctlyEnsure welding machine, baking oven, holding oven and quivers are in good condition with calibration sticker and valid calibration period.Check join configuration, cleanliness before starting welding.Check the pass of welding personnel position and prosses.Review inspection reports (fit-up, final visual, dimensional ) before and after welding.Monitor welding sequence, fairing, distortion and weld repair.Review NDE report (UT. RT&MPI).Issue NCR if activities do not meet specification and client requirementsCheck and review punchlist before sailway.Aware of HSE regulation to subordinate and contractor.Attend quality walkabout and quality meeting daily activities.Final documentation Meno dettagli All activities follow as per test plan (ITP).Check site procedure, personnel qualification, equipment calibration records and drawing Revision status to ensure using latest revision and meet project requirement.Support the contractor to ensure site quality control, in particular monitor compliance with the project specification and procedure.Monitor the activities of the sub-contractor inspector to ensure a consistent approach to welding, construction and NDE issues.Monitor, check and witness for incoming material inspection.Monitor, verify dimensional mark and cut (MVR).Monitoring activities related to ensuring that inspection of it-up assemblies is completed to the requirements.Perform in –process fit-up inspections on poles and structural steel weld assemblies.Has overall responsibility (monitor, verify and check) for performing the dimensional checking of fit-up and after welding accordance with specifications.Monitor welding sequence, fairing, distortion and weld repair.Monitor and check consumable control, storage and handling.Preparation of inspection reports such as daily welding reports and all related documents.Daily surveillance of daily welding activities. (QAN) Meno dettagli To follow any process inspection as per QC procedures and Inspection and Test plan (ITP)To undertake check and verification of all QC related activities in Stainless, Duplex and GRE piping.To verify all relevant QC documentation for Piping Test Pack..and punch listTo check and witness or verify the Piping Test for hydro test inspection activity, pneumatic test, flushing air blow and check dew point.To request any Non-Destructive Testing (NDT) activities and check of NDT reportsTo read and interpret the various drawings (P&ID, GA Drawings, Isometric & spooling) required in the Piping fabrication & erection workCheck and verify join misalignment after welding.Verify spool before blasting paintingTo support the structure of any activity’s inspection.Final documentation Meno dettagli

      • Welding inspector/ Structural QC Inspector.

        Jan 2023 - Jan 2024
      • Structural Steel Inspector/welding inspector

        Mar 2020 - Jan 2023
      • Welding inspector/ Structural QC Inspector.

        Jan 2019 - Feb 2020
  • Licenses & Certifications

    • Welding technology managment

      Malaysian skill diploma
      Feb 2022
    • Cswip 3.2 senior welding inspector

      Twi certification ltd
      Sept 2023
      View certificate certificate