Qudus Adeola ADIO

Qudus adeola adio

bookmark on deepenrich
Followers of Qudus Adeola ADIO522 followers
  • Timeline

  • About me

    Senior Project Engineer

  • Education

    • Chartered financial analyst (cfa) programme

      2014 - 2014
      Cfa level 1 exam passed financial reporting and analysis, corporate finance, economics, portfolio management, derivatives...
    • University of lagos

      2000 - 2006
      Bachelor of science (b.sc.) civil and environmental engineering

      Activities and Societies: Member of Civil Engineering Class of 2000 football team

    • University of lagos

      2008 - 2010
      Master of business administration (mba) business administration and management, general
  • Experience

    • Iwa-ogundipe and partners (consulting engineers)

      Mar 2003 - Dec 2006
      Trainee engineer/draughtsman

      Co-prepared preliminary and final construction and approval drawings for various residential, commercial and civil works projects including:• Honeywell Superfine Foods factory, Ikeja, Lagos; first phase detailed drawings ready within two weeks of contractor mobilization• Supervised Civil Works for an MTN base station T336 Surulere, Lagos; civil works was completed, and cell site commissioned within three months• Attic floor slab and roof beam details for a residential development at Bayo Kuku, IkoyiSoftware design and detailing packages training such as AutoCAD, SAFE, StaadPro and SCALE. Show less

    • Oceanic bank international plc

      Mar 2007 - Dec 2008
      Customer service personnel, marketing officer, assistant cash officer

      Marketing efforts included: Presentation of specialized bank products to retail and corporate customers with modification options to meet specific customer demandsProcessing customers’ requests for retail, corporate and investment banking facilities and productsProviding financial advisory services to customersCustomer Service Personnel duties included among others: Request for customers’ debit cards, cheque books and withdrawal booklets and issuance of same to such customersUpdating and creating customer files coupled with scanning and uploading account details onto bank databaseTypically assisting the Cash Officer involved:Preparation of weekly departmental (unit) report and presenting such at branch meetingsPreparation of vault currency registers and currency proofsLiaison with local CBN branch and verification of transaction tickets. Familiarity with the rudiments and workings of general banking, investments, risk asset creation and financial advisory alongside use of the banking software, FinacleCore and others such as the Customer Relationship View (CRV) and the Online Signature System (OSS). Show less

    • Design implications and fieldmaster contracting limited

      Sept 2010 - Mar 2011
      Project monitoring and evaluation consultant

      • Reviewed construction drawings and work programmes for:o Fencing of Nnamdi Azikiwe International Airport in Abuja (contractor: Plycon Nigeria Limited)o Completion of construction of Loveworld Convocation Arena, Oregun (several contractors)o Road and bridge construction work in Ondo State (contractor: Moreno D.C West Africa)o Renovation and expansion of CBN office in Ogun state (contractor: Cedra Nigeria Limited)o Construction of terrace houses in GRA, Ikeja (contractor: Turnkey Construction Limited)• Attended project site meetings and prepared project monitoring reports for aforementioned projects• Maintained formal communication with all consultants and reviewed project stakeholder engagement documents• Co-reviewed progress reports by other project consultants Show less

    • Afri-projects consortium

      Apr 2011 - Aug 2012
      Assistant consultant, engineering business management

      • Prepared technical and financial bids as responses to Requests for Proposals (RfPs) from:o International Development Corporations and Agencies such as the World Bank and United Nationso Government Ministries Departments and Agencies (MDAs) including the Bureau of Public Procurement/World Bank Economic Reform and Governance Project (BPP/ERGP), Nigerian Communications Commission (NCC), Federal Ministry of Works (FMW), Federal Ministry of Environment (FME), Zamfara State Government and Ministry of Niger Delta Affairs (MNDA)• Prepared project briefs for the company such as the OSSAP-MDG DRGs funded project under The Presidency (Federal Republic of Nigeria), Galaxy Backbone Project (NICEP) and Construction of Silo Complexes nationwide by the National Food Reserve Agency (NFRA)• Prepared a draft strategic outlook for Global Projects Consortium (an affiliate of Afri-Projects Consortium)• Engineering Business Management (EBM) presentations to clients, prospects and at company strategy retreats• Identified business opportunities in existing and emerging sectors of the built environment in Nigeria and Sub-Saharan Africa• Prepared an advocacy strategy proposal for the Association of Consulting Engineers Nigeria (ACEN). Advocacy programme kicked-off with support from the Department for International Development (DFID) and was tagged ‘DFID/ENABLE ACEN Advocacy Project’ Show less

    • Saipem

      Apr 2013 - Jul 2014

      • Prepared Global Analysis Technical Notes for critical Production, Water Injection and Gas Export risers• Designed the Contingency Hang Off Collars (CHOCs) in ABAQUS FEA environment• Design review of other riser components – centralizer, gooseneck, top and bottom assemblies, buoyancy tank, etc.• Global Riser Interference Analysis Phase II with Wood Group MCS/Dover team in Lagoso Prepared and co-reviewed riser interference pairing selection criteriao Conducted critical riser pairing selection assessmento Riser Drag-to-Apparent-Weight (DAW) verificationo Delivered global riser static, quasi-static and dynamic interference analyses ahead of issuance target dateo Results collation, summary and issuance of related design reports Show less Review of EGINA System R Company and Contractor FEED documents prior to detailed design phaseModeling Production, Water Injection and Gas Export risers with mooring lines in Flexcom environmentComputation of offset magnitudes and current heading and subsequent Quasi-static interference analysis between adjacent field structures (including flexible jumpers)Preparation of technical memos and notes per results of quasi static interference analyses conductedDiscussion and review of master SHR and COR TTR MTO and Flexcom queriesPreliminary regular and irregular wave dynamic analysesFlexcom and Shear 7 advanced user training with MCS including extreme, fatigue and dynamic analyses, RBS, Umbilical and SHR modeling and analysis. Show less

      • Riser Global Analysis Engineer

        Sept 2012 - Jul 2014
      • Riser Global Analysis Engineer, EGINA Project

        Apr 2013 - Sept 2013
    • Saipem

      May 2018 - Feb 2022

      • Prepared the project fibre optic cable system technical specification and requisition • Delivered the EPCIC digital project delivery plan 4 weeks ahead of target issuance date • Co-reviewed project pre-commissioning, commissioning and start-up deliverables and responsibility matrix• Participated in project workshops including OMAR, HAZOP, project execution risk assessment and REX• Coordinated internal discussions on technical bid subjects including performance tests and guarantees, plant reliability run, facility operations and progressive handover to SHELL• Co-developed the project commissioning and start-up philosophy and presented to SHELL ahead of the cut-off date• Peer-reviewed project technical and ITT documents. Presented comments 1 week before review deadline Show less • Liaised with consortium partners and prospective project vendors and subcontractors• Prepared umbilical work package preliminary technical specifications, requisitions, design basis and premises ahead of target dates• Internal (engineering, installation, fabrication) and external (Client, vendor) interface management • Identified and evaluated alternative technical and commercial proposals for umbilical system design• Participated in and co-led some project workshops – HAZOP, EPCI risk assessment, REX and lessons learned from previous similar project (EGINA)• Continuous project risk and opportunity identification and management Show less • Managed communication and contractual correspondence with TOTAL, other project contractors (FPSO, umbilical and SPS packages), vendors and subcontractors• Interfaced with other work package managers - engineering, fabrication, installation, offshore operations, procurement and project control• Co-reviewed umbilical post-FAT test procedures and witnessed some pre-loadout tests (TDR, IR, CR, hydraulic pressure tests, OTDR)• Participated in umbilicals loadout, sea-fastening and transportation from Newcastle and temporary yard storage in Nigeria (pre-installation). Shipments were delivered in sufficient time to meet planned installation dates • Co-reviewed umbilical installation analysis and method documents • Peer reviewed umbilical technical documents – cross section design, accumulated plastic strain calculations, packing and trans-spooling, precommissioning and commissioning• Worked with offshore operations and fabrication teams to ensure umbilical installation aids were ready in time for installation campaigns• Prepared and managed project targets (financial, schedule etc.) for the umbilical and RIMS packages• Assisted the offshore operations team during installation, wet storage and hook-up (pull-in) of the dynamic umbilicals • Coordinated onshore pre-commissioning of umbilicals with the designated subcontractor. All tests were completed before for load-out dates• Completed dynamic umbilical electrical, fibre optic and mechanical termination activities on the FPSO• Successfully completed RIMS commissioning ahead of TOTAL’s first oil target date Show less

      • Senior Project Engineer, HI (FEED) Development Project

        Apr 2020 - Feb 2022
      • Package Manager and Interface Lead, Umbilical and Heating Systems, Preowei Project

        Aug 2019 - Apr 2020
      • Deputy Package Coordinator, Umbilical and Riser Integrity Monitoring Systems

        Aug 2014 - Jul 2019
      • Offshore Business Development Team (Brief Secondment)

        May 2018 - Jul 2018
    • Ripen marine contractors ltd.

      Feb 2023 - Mar 2024
      Senior project engineer, shell bonga fpso top chain replacement project

      • Prepared several package SoWs and draft contracts. Draft contracts peer reviewed by the project contracts manager• Worked closely with the project leadership, contracts manager and cost control functions in reviewing the project baseline budget and forecasting completion costs • Participated in project contracts review sessions including clarification sessions with SHELL and key sub-contractors• Designated focal point for the FPSO mooring line tension instrumented sensing assembly scope including review of technical documents for engineering, subsea retrieval, fabrication, pre-commissioning, commissioning and reinstallation• Internal communication and interface management within the engineering, HSSE, security, quality, project controls functions• External interface management with SHELL and critical Contractor Group entities• Served as a reference person for the deployment and successful integration of ROV system and personnel components on the dive support and main installation vessels• Prepared the project risk (and opportunity) management plan. Document jointly reviewed with some project steering committee membersand project team• Jointly reviewed the project management of change procedure• Co-prepared power point presentations for and participated in SHELL’s quarterly Business Performance Reviews (BPRs)• Acted in the deputy Project Manager capacity Show less

  • Licenses & Certifications

    • Msmean

      Member, society for monitoring and evaluation, nigeria (smean)
      Feb 2012
    • Micen

      Member, institute of chartered economists of nigeria
      May 2008
    • Mnim

      Associate member, nigerian institute of management (nim)
      Dec 2007
  • Honors & Awards

    • Awarded to Qudus Adeola ADIO
      Graduated in top one percentile in the UNILAG MBA Class of 2008 - May 2010
    • Awarded to Qudus Adeola ADIO
      Graduated in top ten percentile in the UNILAG Civil Engineering Class of 2000 - Aug 2006
    • Awarded to Qudus Adeola ADIO
      Course representative, Civil Engineering class of 2000 - May 2005
    • Awarded to Qudus Adeola ADIO
      Best graduating student in Senior category of the Secondary School Leaving Certificate - Jul 2000
    • Awarded to Qudus Adeola ADIO
      Senior Prefect, Ansar-Ud-Deen College, Isolo, Lagos - Jul 1999
    • Awarded to Qudus Adeola ADIO
      Best graduating student in Junior category of the Secondary School Leaving Certificate - Jul 1997