TIRUMALARAO KOTTEDA. B.E.,(Civil Eng) MIE, Ceng. Kolkata, India.

Tirumalarao kotteda. b.e.,(civil eng) mie, ceng. kolkata, india.

bookmark on deepenrich
location of TIRUMALARAO KOTTEDA. B.E.,(Civil Eng) MIE, Ceng. Kolkata, India.Muscat, Masqaţ, Oman
Followers of TIRUMALARAO KOTTEDA. B.E.,(Civil Eng) MIE, Ceng. Kolkata, India.306 followers
  • Timeline

  • About me

    Structural Engineer

  • Education

    • Msnc high school kakinada

      1975 - 1979
      10 th class high school

      Activities and Societies: National cadet core 10 th standared

    • Osmania university

      1988 - 1992
      Bachelor's degree civil engineering

      Activities and Societies: Member of Institute of Engineers, Kolkata, India. And Member of Saudi Council of Engineers, Riyadh, KSA. Bachelor in Engineering

  • Experience

    • M/s recondo-knr construction ltd

      Nov 1992 - Sept 1996
      Site engineer

      From Nov 1992 to Sept 1996 Employer : M/s Recondo – K.N.R. Constructions Ltd. Position Held : Site EngineerProject : Widening & strengthening of Andhra Pradesh State Highway, APSH – 1 (Hyderabad– Karimnagar – Ramagundam Road) Rajiv Gandhi Highway Consultant : C.E.S., DelhiProject Cost and duration : 225 Crores – 36 Months Jobs Handled : Earth Work in Embankment,WBM, PCC, DBM-1,DBM-2,Bituminous Concrete Layers and Pavement Quality concrete Roads.Strengths: My motivation is to complete the assignments entrusted to me with strong ability, dedication, and team building ahead of the schedule completion. Also I like to perform as a good and dedicate manager i.e. in the level of AGM/ DGM with pleasing to the management of the organization. Show less

    • M/s siddhartha civil works pvt. ltd

      Oct 1996 - Oct 1999
      Senior site engineer

      Employer : M/s Siddhartha Civil Works Pvt. Ltd. In association with IRCON International Ltd Position Held : Senior Site EngineerProject : Widening & strengthening of Andhra Pradesh State Highway (APSH) – 1B (Warangal – Raipatnam Road) Funded by World BankConsultant : Louis Berger International Inc., USAProject Cost and duration : Rs. 120 Crores – 36 MonthsJobs Handled : Preparation of Sub-grade, Granular Sub- base Crushed Rock Base, Asphalt Concreting and CD works. Show less

    • Nice - lbii (usa)

      Nov 1999 - May 2006
      Senior engineer

      A Sister Concern of Aarvee Associates, Hyderabad).; Roads & Bridges), Karimnagar District.Project : Andhra Pradesh Economic Restructuring Project With World Bank Assistance to develop roads 540 Km length of Roads and 25 Major and Minor Bridges. Project Cost and duration : Rs. 450 Crores - 6 years.Jobs Handled for Road Works : Completed 3 Road Packages about 90 kmSite clearance & Survey works.Construction of Earth work, sub-grade, GSB, WBM, Prime Coat, OGPC and Seal Coat.Construction of CD worksPreparation of Revised Estimates & Bills.Preparation of Progress Reports.Jobs Handled for Bridge Works : Construction of High Level Bridge overMulavagu at Hanumaji pet Vemulavada,Karimanagar. Span arrangement7 ventsof 25.36 mtrs. C/C.Construction of High Level Bridge overManair vagu near mallapur in Karimnagar District. Span arrangement 31vents of 17.10 mtrs. C/C.RCCT-beam girder Slab, Well and Open FoundationBridge.Construction and Placing of cutting edges, Well Curbs, Well Steinings, Well Caps, Piers, Bed Blocks, Bearing Pedestals, RCC T-Beam Girders, Slabs, Railing works and approaches Show less

    • M/s. transstroy india ltd

      Jun 2006 - Oct 2008
      Sr. highway engineer/dy. project manager

      A joint venture of HUDA & INCAP)Construction of 6/8-lane access controlled express way as outer ring road to Hyderabad City, Phase – I, Package from Km 0/000 – 11/000 (Gachibowli – Appa junction) Project Cost and duration : Rs. 220 Crores - 30 Months.Jobs Handled : In-charge for Km. 0/000 to 6/000 For both Highways and Structures. Structures:Construction of 450 mts 4-Lane Major fly-over at Gachibowli Junction of Span15x30 mts T-beam PSC girder Slab Construction of 136 mts Major Bridge across the Musi River of aprox 30 degree skew and span 4x34.00 mts of T-beam PSC girder Slab.Construction of RCC Retaining Walls about 1.2 Kms. And Reinforced Earth (RE) Walls with facia blocks about 800 mts.Construction of 4 VUPs,2 pups and 6 RCC Box culverts. Show less

    • M/s. ramky infrastructures ltd

      Nov 2008 - Aug 2011
      Project manager

      A joint venture of HUDA & INCAP)Construction of 8-lane access controlled express way as outer ring road to Hyderabad City, Package from Km 23/700 – 35/000 (Patancheruvu – Mallampet) Project Cost and duration : Rs. 350 Crores – 30 MonthsJobs Handled : Total Technical In charge for Structural works. Consisting 3 no’s MIBs, 14 No’s Box Culverts, 7 No’s Vups and 6 no’s Pups

    • M/s. madhucon projects ltd

      Aug 2011 - Sept 2014
      Agm / sr project manager (roads and bridges)

      Worked as Assistant general manager for 4-Lane Trichy-Tanjavur Expressways. Participated in the Construction of Pre-stressed concrete girders and launching of girders.Quantity surveying for Roads & Bridges. Preparation of Bills and EstimatesConducting various field tests in quality control aspects as per MORT & H specification; EPC DIVISION)Project : Design,Engineering,Finance,Construction,Operation and Maintenance of Thanjavur-Trichy Section from Km 80.000 To 136.490 of NH- 67 in State of Tamil Nadu Under NHDP-IIIA on Build, Operate and Transfer(BOT)Basis. Project Cost and duration : Rs. 320.00 Crores – 30 MonthsJobs Handled : Total Package Technical In charge for 4-Lane Road cum Structure works. The Quantities are as fallows Earth work in Embankment – 16,68,655 cum Earth work in Cutting – 73,465 cumSub grade – 9,68,095 cumGSB – 3,81,885 cum WMM- 3,30,560 cum DBM- 1,86,110 cum BC- 91,110 cumBox culverts – 37 No’s Pipe culverts- 57 No’sUnder passes – 12 No’sMinor Bridges – 21 No’sMajor Bridges – 2 No’sROBs – 2 No’s Show less

    • Saudi pan kingdom company - sapac

      Nov 2014 - Oct 2015
      Sr. bridge engineer

      Worked as a Sr. Bridge Engineer for a 1.5 km flyover at Arar, Kingdom of Saudi Arabia.

    • Ikam engineering consultants. muscat, sultanate of oman.

      Nov 2015 - Oct 2017
      Bridge engineer

      From Nov 2015 to Nov 2017Employer : IKAM Engineering Consultants. Muscat, Sultanate of Oman.Position Held : Bridge Engineer.Project : Construction of Grade Separated Junctions along Batinah Highway Stage 3 (Part-1) Client : Ministry of Transport and Communications Director General of Roads & Land Transport. Sultanate of Oman. Project Cost and duration : OMR. 25 Million – 20 MonthsJobs Handled : 1. Constructed 4 no’s Dual carriage way 6- lane Vehicular underpasses consisting PSC post tensioned Inverted T beam girders of Length 25.10 mts each. 2. Total no of Girders 100 no’s 3. Constructed MSE wall 32,000 sq. m 4. Box Culverts New-11no’s.Extended-13nos 5. Pipe culverts Extended- 23 no’s 6. Concrete Quantity— 25,000 Cum 7. Steel Quantity—5,000 MT Construction of Grade-Separated Junctions Along Al Batinah Highway, in Sultanate of Oman. Show less

    • Renardet sa & partners

      Nov 2017 - now
      Civil structural engineer

      Working as a Civil Structural Engineer(Bridges) for the Dualization of the Al Ansab- Al Jafnain Road Project. It's a 6-lane access-controlled expressway consisting of 15 km of road and 7 Nos Interchange Bridges and also comprises 264 Bored cast in-situ RCC piles, 100 PSC I-girders, One voided slab,50 Nos Boxculverts, 2 km MSE wall and 2.2 km RCC retaining wall.

  • Licenses & Certifications

    • Member of institute of engineers. kolkata, india.

    • Member of saudi counsil of engineers

      Saudi counsil of engineers, riyadh.