Md Wasif Iqbal, IRCA®-QMS

Md Wasif Iqbal, IRCA®-QMS

Mechanical HVACEngineer

Followers of Md Wasif Iqbal, IRCA®-QMS493 followers
location of Md Wasif Iqbal, IRCA®-QMSRiyadh, Saudi Arabia

Connect with Md Wasif Iqbal, IRCA®-QMS to Send Message

Connect

Connect with Md Wasif Iqbal, IRCA®-QMS to Send Message

Connect
  • Timeline

  • About me

    QA QC Mechanical Engineer - Certified Lead Auditor :: ISO 9001:2015 | SCE Approved

  • Education

    • Taiba Engineering and Consultant Hyderabad

      2016 - 2016
      Execution Commissioning Designing and Drafting in HVAC System

      ☑️Heat Load Calculation through HAP Carrier☑️ESP Calculation of Duct and Pipe☑️Calculation of Ventilation - Car Parking, Kitchen Hood and Toilet☑️MCquay Duct Sizer☑️MCquay Pipe Size

    • Marwari College Ranchi

      2008 - 2010
      Intermediate Science mathematics physics chemistry
    • Annamalai University

      2010 - 2014
      Bachelor's of Engineering in Mechanical Engineering 8.5 out of 10

      First Class with Distinction

  • Experience

    • Daikin Applied Americas

      Jul 2014 - Feb 2016
      Mechanical HVACEngineer

      ☑️Installation and Start-up of York Air-Conditioner Equipment & Hitachi Air-Condition.☑️15,000 TR Cooling Capacity from 6 centrifugal VFD chillers and cooling towers of 2500TR each.☑️3.1 lakh sq m of ducting of various categories running 110km in length.☑️80 AHUs, some with HRWs of 4600mm dia, delivering 31 lakhs CFM air with 1.2 lakh CFM fresh air.☑️521 ceiling suspended units(CSU), handling 5.5 lakh CFM.☑️Over 350 ventilation fans.☑️Integration with BMS and other services.☑️1450 VAVs.☑️21 pumps of capacity 7500 USGPM/335 HP onwards.☑️27 km of piping with sizes upto 1300mm dia, including pre-insulated pipes 1100mm onwards.☑️YORK water cooled Centrifugal Chiller, (1000*6) tons capacity. ☑️DX Type unit, AHU, FCU, Cassette type unit, Mini Split unit, Copper tubing, Brazing, leak Pressure ☑️Testing, Vaccumizing and Gas Charging, and Air Balancing.☑️Responsible for Maintenance issues.Analyze and evaluate A.M.C. Operational Risk plan, execution plan. B.M.S control and E.LV. system operations. Conduct lifts emergency release procedures as required.☑️Implementing high quality MEP maintenance services, including required preventive maintenance in order to minimize the break downs, improving the service provided to the building which is an added value for the property and will reduce the operation cost. ☑️Good Experience in Maintenance Scheduling & Planning. ☑️Maintenance of all buildings fixtures and fittings to ensure they are in safe condition and take action when any unsafe situations arise. ☑️Responsible for the health and safety of the building. Communicate directly and indirectly with the tenants and service providers to insure the implemented works are in line with the company guidelines and authorities regulations. Show less

    • Galfar Al Misnad Engineering and Contracting W.L.L.

      May 2016 - Dec 2021
      Mechanical Engineer-QAQC

      ☑️Air Distribution System by Velocity Reduction Method, Equal Friction Method and Static Regain Method following SMACNA Standard.☑️ESP Calculation for Fans & Blowers.☑️Toilet & Kitchen Ventilation system Designing. ☑️Staircase pressurization system Designing.☑️Head Loss calculation for Primary & Secondary pump system.☑️Design of Expansion tank sizing.☑️Selection of Chiller, AHU’S, FCU’S ,FAN’S, Exhaust Fan, Blower, Window AC, Cooling Tower, Desert Cooler and other Equipment’s.☑️Installation and Start-Up Trane Chiller, York Chiller (Water-Cooled Condensation type), (1000*6) tons capacity, AHU, FAHU, FCU, HVAC Control Instrument, Control panel, DDC & Loop test for Commissioning, Exhaust Fan, Supply Air Fan Preventive Maintenance, Servicing & troubleshooting etc.☑️Mcquay water cooled Centrifugal Chiller, (2500*8) tons capacity. ☑️Daikin water cooled Centrifugal Chiller, 2500 tons capacity. York Air Handling Unit 9381 CFM. Capacity. ☑️Mcquay Air Handling Unit 6194 CFM Capacity.☑️AHU, FAHU, FCU, Package Unit, Duct able Split Unit, Mini Split Unit, Freezer, EF, SAF, Bleed Fan, Pressurization Fan and HVAC control Systems handling.• Preventive Maintenance, Servicing and Troubleshooting etc.☑️Extensive knowledge of plumbing (water supply system, drainage system)along with special leak detection system.☑️Reject or accept the materials in accordance with the specifications.☑️Apply method statement / checklist at site and generate targeted work order closing.☑️Stabilized the Maintenance procedure, Achieved 99% PPM & CM completion rate. Improved client satisfaction and team Participation. Improved System & work standards.☑️Planning and execution of Operation and Preventive maintenance of Chiller Daikin (water cooled 15X 5TR), Trane (Air cooled 4X 270TR) and McQuay (Air cooled 12X 250TR) chiller, Package unit(150X 11TR), FCU (1500X 5TR), AHU (600X 36000CFM),Variable Air Volume units, split Air conditioning and associated pumps and cooling tower. Show less

    • AL Ansari Engineering and Consultant

      Jan 2022 - Oct 2022
      Mechanical Quality Engineer

      ☑️Meeting with clients to discuss their technical and engineering needs.☑️Analysis and assessment of technical issuesResearching, planning and executing advanced technical solutions☑️Preparation of submittals Material approval, Shop Drawing and etc. ☑️Preparation of Technical Queries and Field changeMaintaining accurate record of work done on site and remaining work to be done on safe.☑️Preparing Power Point Presentation about the work progress By - weekly to the Management☑️Maintaining the records of RFI, MIR, Method of Statement, and ITP for Each activity.☑️Maintaining records for DCN and Red - Line Drawings.☑️Verify all materials used in the construction and ensured that they are of premium quality.☑️Review of Project specifications, Procedures, Method statements, ITP.☑️ In charge for building inspection and overall installation of HVAC Equipment's (e.g. Air Handling Units,Air Cooled Air Conditioning Units, Air Cooled Water Chillers, Fans, Exhaust fans, Fan Coil Units, etc.) Ducts / Chilled water Pipes & Fire water Pipes / Condensate Drainage System.☑️Inspection of Plumbing Underground, & Aboveground piping and in process.☑️Inspection of the HVAC installation, Chilled water pipe, Fire water pipe, Structural scope, Plumbingabove ground underground scope & Elevator.☑️Inspection of the HVAC installation, start-up, air balancing, pre-commissioning and commissioning ofthe AIR CONDITIONING SYSTEM, HVAC & MEP.☑️Inspection and Copper Pipe Clearance of Fit up, & weld visual of all and in process.☑️Coordinates other disciplines' interfaces like electrical and Instrumentation department, civilunderground distribution and facilities, and with Mechanical Works.☑️Marking Request for Inspection Formats (IR) and Field Inspection Reports.☑️Review, comment and recommend approval on contractor's shop drawings, technical fieldqueries, Method Statements, Inspection and Test Plans. Show less

    • Arail Construction & Industrial Co. Ltd.

      Nov 2022 - now
      Mechanical QAQC Engineer

      Mechanical Quality Engineer with having 9+ years of Experience in the field of Mechanical Engineering on Infrastructure construction Projects including Metro Rail & Fuel systems.Project: Riyadh Metro Rail - Deep Underground Station Project Package 1, Line 1

  • Licenses & Certifications

    • Mechanical Engineer - PROFESSIONAL ACCREDITATION

      Saudi Council of Engineers
      May 2023
    • ISO 9001:2015 Lead Auditor (Quality Management System)

      IRCA | International Register of Certificated Auditors
      May 2023
      View certificate certificate