Khaled Mujhem , PMP

Khaled Mujhem , PMP

Site Civil Engineer

Followers of Khaled Mujhem , PMP107 followers
location of Khaled Mujhem , PMPJeddah, Makkah, Saudi Arabia

Connect with Khaled Mujhem , PMP to Send Message

Connect

Connect with Khaled Mujhem , PMP to Send Message

Connect
  • Timeline

  • About me

    Senior Project Manager at MBL

  • Education

    • Aleppo University

      1994 - 2000
      Bachelor of Engineering - BE Civil Engineering

  • Experience

    • Syria General Telecommunication Company

      Nov 2000 - Feb 2003
      Site Civil Engineer

      Construction of Various Communication Buildings and Towers , Syria • Duties and Responsibilities• Manage and control the overall construction supervision of the project effectively.• Manage to implement the project within the required time, budget and at a high level of technical quality.• Supervise and critically monitors the construction duties on site such as civil, structural and architectural to ensure that the work is progressing in accordance with the plans, specifications, schedule, budget and quality standard.• Prepare project schedule, update and revise according to project requirements and parameters.• Conducts meetings with the Clients and Project Teams, identify possible problems that might occur during the course of construction and its recommendation and corrective actions to be implemented. Reporting of physical and financial accomplishment of the project to maintain the plan.• Prepares cost estimate.• Prepares weekly & monthly progress report.• Provides input to site inspection, cost and schedule controls and field engineering support. Material receiving and reporting, prepares site construction progresses & measurement. Review progress report and recommends for progress payment.• Direct, coordinate and monitors the day to day activities of the site supervision team.• Review and analyze change order cost proposal and contractors progress claim• Ensure that all the work is performed strictly in accordance with its Drawings, Specifications and Contract Conditions. Show less

    • AJA Trading and Contracting Company

      May 2003 - Jul 2005
      Project Engineer

      Construction of Educational Compound Wadi Al Dawaser , Riyadh, K.S.A • Scope of Work• Building facilities construction

    • Huta Group

      Sept 2005 - Jan 2021

      Shoaiba RO Phase 4 Desalination Plant Project , SWCC , Shoaiba , Makkah, K.S.A• Scope of Work Dredging works for Intake and Outfall GRP Pipes (Approximately 130,000m3) Offshore pipe laying, GRP 2.40 dia. pipe using coupling system ( 3.5 km) Earthworks, excavation, shoring and dewatering works Construction of Seawater pump station (35 m x 25 m ,depth 11 m, below seawater)  Shore protection works  Fabrication and installation of PC Seawater Intake Head Structure Navigation aids, Oil boom and permanent buoy installation. Show less Aramco Baish Corniche Development Project , Jizan Economic City , Baish, K.S.A • Scope of Work Dredging works of harbour area  2 KM Baish Beach Development with toe protections  Harbour Shore protection works  Coast Guard Jetty construction, fabrication and Installation of PC Blocks with marine accessories. Pile driving for Pontoon pile guide and Navigation Aids Construction of utilities including Fuel Tanks to supply North and South Breakwater fuel pumps. Construction of slipway Floating docks and services installation All related MEP works. Testing and commissioning Show less Shuqaiq Steam Power Plant Stage 1 Project , SEC, Shuqaiq, K.S.A• Scope of Work  Dredging and Reclamation works, dredging works for intake head, intake channel and the outfall area. Construction of Small Craft Berthing Facility, excavation, precast fabrication and installation. Fabrication and installation of Intake Structure, installation of Intake Channel GRP Pipes including GRP Chlorination Pipes. Construction of Intake Pump House, earthworks (excavation, shoring, dewatering, backfilling) including reinforcement and concrete works. Offshore Civil Structural Works, construction of Intake Bridge, Approach Trestle, Fuel Unloading Jetty (unloading platform, breasting and mooring dolphin and catwalk pier) , Foam Building Structure. Fabrication and Installation of Precast Structures for the above mentioned structure.  Shore protection works  Installation of Navigation buoys and bollards. Show less Qurayyah Independent Power Plant, ACWA, K.S.A• Scope of Work Dredging of Intake and Outfall Channel (Approximately 600,000m3) Offshore and Onshore GRP 4.0 m dia. pipe laying using coupling system ( 6.5 km) Construction of Seawater pump station (105 m x 95 m ,depth 12 m below seawater)  Construction of outfall seal pit structure (2 Nos.,29 m x 22 m , depth 6 below seawater level) Shore protection works Construction and installation of velocity cap (Seawater Intake head structure) Navigation aids, Oil boom and permanent buoy installation. Inland GRP pipe 2.70 m dia. Installation using lamination system. Show less Qurayyah Combine Cycle Power Plant , SEC, Dammam , K.S.A• Scope of Work- Dredging of Inner & Outer Basin in addition to Outfall area (800,000 M3).- Construction of Intake basin with breakwater (205mx300m) with an inlet of 52 Nos. of GRP pipes 2m diameter.- Precast concrete blocks for intake structure and end weir discharge canal and etc.- Construction of Reinforced concrete lining discharge channel (around 800L.m).- Construction of Rip Rap Revetments for Shoreline protection (Around 1.5Km).- Reinstatement of slope protection.- Construction of Cooling water Pump House with 14 bays approximately 215m x 53m, depth 9 m below seawater With R.C Walls provided with Reinforcement protected by cathodic protection. - Construction of Weir Box (55mx13m,depth 4 m below Seawater) Show less Storm water Flood Control and Evacuation and Rehabilitation of Waste Water Lake at Briman , Jeddah Municipalty , Jeddah , K.S.A • Scope of Work of STORMWATER FLOOD CONTROL PROJECT• Total length of pipe 7200 m with different dia. 200mm @ 300mm PVC slotted pipe with geotextile • Total number of manholes 84 , trench depth is start from 3 m to 6.5 m • the project completed within 3 months• Scope of Work of EVALUATION AND REHABILITATION PROJECTEvacuation and disposal of waste water (qty. 10 million cubic meter) from waste water lake Briman and the sludge to stockpile and treatment.Total area of the lake was divided into 260 numbers equal grid cell, each grid cell is equivalent to 1 hectares, soil samples is collected form each grid. Show less Improvement of Jamarrat Bridge and Surrounding Area, Mina, Makkah, K.S.A• Scope of Work• The project includes the 2nd, 3rd, 4th floors of the main bridge (segmental type) with their Ramps and 11 Escalator buildings (50Ms height).• From sept 2005 –Dec 2006: My job was execution of the underpass & logistic support including preparation of BBS and rft steel Fabrication for all ramps of the first floor & few foundation of main bridge.• From Jan 2007 –Dec 2007: I was responsible of the execution of 2nd Floor Ramp N-IN2 which leads to the main bridge.• From Jan 2008 –Dec 2008: I was responsible of the execution of 3rd Floor Ramp CL – OUT3 & 4th Floor Ramp which leads to the main bridge.• From Jan 2009 –Dec 2009: I was responsible of the execution of One Escalator building. Show less

      • Senior Project Manager ( Offshore & Onshore )

        Dec 2017 - Jan 2021
      • Senior Project Manager ( Offshore & Onshore )

        Apr 2016 - May 2018
      • Senior Project Manager ( Offshore & Onshore )

        Nov 2016 - Feb 2018
      • Senior Project Manager ( Offshore & Onshore )

        Dec 2016 - Mar 2017
      • Project Manager

        Apr 2014 - Nov 2016
      • Senior Construction Project Manager ( Offshore & Onshore )

        Mar 2011 - Jun 2014
      • Site Manager

        Mar 2010 - Jun 2012
      • Construction Project Manager

        Aug 2009 - Oct 2010
      • Site Manager

        Sept 2005 - Aug 2009
    • Huta Group

      May 2021 - Nov 2021
      Senior Project Manager ( Offshore & Onshore )

      • Scope of Work Construction of 75,450m2 Yacht Club Marina to accommodate up to maximum 96m (length overall) yacht.  Dredging works for area of 75,450m2 up to -7.50CD, -6.50CD levels, total qty=1,015,000m3. Excavation by land of 1,350 LM of Quay Wall area to -10.00 CD. Fabrication and Installation of various types Quay Wall precast blocks 2,489 total numbers for 1,350 LM by average 10m ht. by 4.5 average width quay wall. Supply & Installation various types of navigation buoys including concrete dead wt. Supply and Installation of concrete floating docks including accessories. Driving tubular piles for floating docks anchors. Construction of revetments utilizing various rock sizes. Construction of breakwater, installation of precast blocks and underwater in-situ concrete filling works. Show less

    • MBL - Modern Building Leaders

      Jul 2022 - now
      Senior Project Manager ( Offshore & Onshore )

      • Scope of Work  Marina Quay Wall, 2,515m, founded on dredged sea bed level of -3.00mCD, -5.00mCD & -10.00mCD, top level is +2.9mCD quay wall materials is combined various types of precast blocks, and various sizes/weights of rocks.  Sea Wall, Construction of 1,198m in approximate length of sea wall founded om existing seabed level at -0.70mCD top level is +4.5mCD.- Dredging of Marina Basin, Entrance Channel & Quay Wall Trench- Laying of Geotextile & Construction foundation rocks- Fabrication (formworks and casting), transporting, handling and placing of precast blocks- Rock fills behind quay wall- Construction of cast in-situ capping beams- Installation of quay wall furniture’s i.e., bollards, fenders ladders etch.- Installation of Navigation Aids  Supply and Installation of concrete floating docks (367 elements with area 12000 m²) including accessories. North Cruise Terminal: A 255-meter-long jetty with 172 steel piles, 21 precast elements (each weighing 200 tons), and 5,355 m² of cast-in-situ concrete. The terminal is designed to berth cruise vessels up to 200 meters in length. South Royal Berth: A 170-meter-long jetty with 148 steel piles, 16 precast elements (each weighing 200 tons), and 3,570 m² of cast-in-situ concrete. It serves vessels up to 138 meters in length. Deck on Pile Structure: A 455-meter-long structure with 162 steel piles and 842 precast elements. Central Pier Structure: A 338-meter-long structure with 242 steel piles, 1,210 precast elements, and 8,700 m² of cast-in-situ concrete. JCD Pier Hybrid: Comprises 187 steel piles and 4,500 m² of cast-in-situ concrete. JCD Pier Sea Gallery: Includes 195 steel piles, 152 bored piles, and 10,000 m² of cast-in-situ concrete. Revetment Works: Two revetments, one 1,200 meters long with a depth of -12.8 meters and the other 455 meters long with a depth of -3.8 meters. Core-Loc Casting and Installation: 4,000 units, including 1,800 units of 4 m³ and 2,200 units of 1.8 m³. Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
      Dec 2020