Alaa Khalil

Alaa Khalil

Field Engineer & Surveyor

Followers of Alaa Khalil109 followers
location of Alaa KhalilAbu Dhabi Emirate, United Arab Emirates

Connect with Alaa Khalil to Send Message

Connect

Connect with Alaa Khalil to Send Message

Connect
  • Timeline

  • About me

    Specialist Civil Engineer (ADNOC ON SHORE)

  • Education

    • Alexandria Universty

      1982 - 1988
      B.Sc Civil Engineering good

      NICET III: National Institute for Certification in Engineering Technologies (Transportation/Highway Construction Level 1-2-3) USA.ACI : [American Concrete Institute] USA 2005D.D.C. CONCRETE INSPECTION CERTIFIED (Department Of Design and Construction N.Y.C

  • Experience

    • Alexandria Contracting Corp

      Nov 1987 - Oct 1993
      Field Engineer & Surveyor

      Applying design drawing on site as per specification Surveying prior to the projects for roads and building foundation and infrastructure utilities. Inspection of Rebar's detail as per plan including measurement.Supervising all Measurement and payment quantities, Reports and change orders.

    • DARA CONTRACTING CO. MEMPHIS

      Nov 1993 - May 2000
      Field Engineer

      Inspection of building material as per plan and specificationConcrete Tests (Slump Test and Air Test) , Sampling Concrete Cylinders .Calculating Areas and Volumes of Work Done On the SiteStandard Surveying and Using Topographic MapsDaily report and payment calculation Scope of Work:Highway Repair Reinforced Concrete and Pavement (12 million dollars).Milling And Re Paving Interstate 80 (Phase II) (8.5 million dollars).Supervising of Detour Lanes and traffic flow. Show less

    • BENDIX CONS. INC

      May 2000 - May 2002
      Highway, Field Engineer

      Reviewing & Approval of design drawing on site as specification of the state requirements.Inspection & Approval of Rebar's detail as per plan including measurement and on site inspection.Inspection of Median Barrier and Guardrails Installations.Basic Maintenance and Protection of Traffic.Supervising all Measurement and payment quantities and Reports and change orders Scope of Work: (CLIENT: D.O.T.) (10.8 million dollars).Reconstruction of Interstate 45: Construction work on this $10.8 million rehabilitation and preservation of INTERSTATE 45 EXIT #7 TO EXIT#11 involved milling, asphalt, replacement curb and shoulder rebuilding, base and median barrier repair, and drainage rehabilitation. Construction inspection services for this effort. Most of the work was performed at night, in order to permit full shutdown of the roadway.Reviewing design and details of: steel composite girders and steel column. Reinforced concrete abutments and retaining walls. Inspection of: Catch Basin Installation and All Connection According To Drawings.Supervision: Excavating and Fill WorkSupervision: Milling and Asphalt for 18.00 milesDesign Revision & detailing of steel composite girders and steel column. Show less

    • Urbitran Associates

      May 2002 - Sept 2007
      Project Manager

      Responsible for performing quality assurance inspection and administering contractsEnsuring that all quality standards are met and that construction projects are completed in a safe and timely manner with minimal extra coasts. Responsibility of applying all blue prints on site based on the latest specifications {D.D.C spec.}and {D.O.T.}Supervise all surveys, measurement, reportsSupervise all tests done on site and lab. Samples Safety requirements based on O.S.S.H.A (federal standers) Scope of Work: Infrastructure Projects (240 million dollars).Reconstruction; This 240 million US dollar project includes the installation of trunk and distribution water mains from 8 inches to 72 inches, combined sewers from 15-inches to 54 inches, catch basins with chute connections, relocation of utilities, removal of old trolley tracks and contaminated and hazardous soil, installation of new street lighting and traffic signals and complete roadway reconstruction with concrete base, curb and sidewalk as well as monitoring MPT. Show less

    • Talaat Mostafa Group

      Sept 2007 - Jan 2010
      Senior Project Manager

      Define the Terms of Reference for Engineering Stage.lead value engineering at all project life period.lead EPC commercial bids and final value table.Responsible for contracts review and change order and contractor claims. supervise the consultant-contractor relation Ensuring that all quality standards are met and that construction projects are completed in a safe and timely manner with minimal extra coasts.Ensure and apply the time schedule as planned and solve upcoming problems Responsibility of applying all blue prints on site based on the latest specifications {D.D.C spec.}And {.Egyptian code.}Supervise all surveys, measurement, reports, all tests done on site and lab. Samples.Safety requirements based on O.S.S.H.A (federal standers) Scope of Work Main infrastructure network: (water lines, Irrigation line, sewer line, roads).Water Tanks: (elevated water tank with a capacity of 7000 m3 using lift slap methodology and under ground irrigating tanks with a capacity of 42000 m3, fire tanks, and irrigation tanks).Bridges and over paths: supervise 80 m span concrete bridges with asphalt road final layer )Tunnels and culverts: (supervise 6 to 12 m golf cart tunnel with utility lines constructed throughout the Skelton).Golf course and nursery : ( constructing 18 holes golf course including grass nursery , seven lakes, hard and soft landscape, irrigation system , water pumps and supervise the American contractor and the consultant )Open Air Mall :( supervise the concrete Skelton and steel structures of the mall buildings and supervise the Italian contractor Water park :( supervise the concrete Skelton of the mall buildings and supervise the Italian contractor Sewer Treatment plant : supervise the contractor- consultant Show less

    • ADNOC (Abu Dhabi Company for Onshore Oil Operation)

      Jan 2011 - Jun 2024
      QA/QC Specialty Engineer

      Auditing ( Internal & External ) as per ISO 9001-2008Contractors and Manufacturers' Technical evaluation for contract awarding.Prequalification for contractors as per client requirements.Project Quality Plan (PQP) reviews and approval.Quality Control Plan (PCP) reviews and approval.Project Management (BVAP) business value assurance procedure Scope of Work Accommodation and administration buildings for oil fieldsInfrastructure and utilities: ( water lines, Irrigation line, sewer line, roads )Sewer treatment plant.Over head power transition lines: (including under ground cables, grid and secondary power station.Helicopter pad : (including all require facility ) Show less

    • LRQA

      Jan 2023 - now
      Senior Civil Engineer
  • Licenses & Certifications

    • Prince 2 Project Management in government environment

      Jun 2013
    • Project Management (BVAP) business value assurance procedure

      Mar 2013
    • Estidama Qualified Professional

      Abu Dhabi Urban Planning Council
      Apr 2012
    • Auditor

      ABSG
      Oct 2011
    • ACI Concrete certified testing

      American Concrete Institute
      Mar 2010
    • (NICET III )Transportation Engineering technology & High Way Construction

      National Institute for Certification in Engineering Technologies
      Jul 2009
    • Project Management

      American universty of cairo
      Apr 2009