Truc Phan

Truc Phan

Planner

Followers of Truc Phan149 followers
location of Truc PhanVietnam

Connect with Truc Phan to Send Message

Connect

Connect with Truc Phan to Send Message

Connect
  • Timeline

  • About me

    Supply Production Leader - Decathlon VietNam

  • Education

    • University of Economics Ho Chi Minh City

      2011 - 2013
      Master of Business Administration (MBA) Business Administration and Management, General 7.2
    • Foreign Trade University

      2006 - 2010
      Bachelor's degree Foreign Economics 7.8

      Activities and Societies: Scientific club

  • Experience

    • Procter and Gamble

      Jul 2010 - now
      Planner

      2010-2012: Material Requirement Planner2012-2014: Project leader 2014-2016: Distribution Requirement Planner

    • Procter and Gamble Ltd.

      Jul 2010 - Mar 2014

      2012- 2014: Initiative planner / Project leader ensures finished product of good quality must be available at launch date and remnant will be managed as minimum as possible. - Respond to initiative request back to the initiator timely including the confirmation of supportable launch date and essential investment for technique together with capital expenditure, installation schedule etc.- Lead the development and own the tracking and review of the CPS for the execution of every initiative to get the stock ready at launch date- Lead the multi-functional team to make sure the successful execution (start-up planning, qualification and launch) for all initiatives.- Develop and track the conversion plan following new project’s conversion strategy to minimize remnant for both phase-out finished products and materials. Define root cause and action needed if unplanned operation happened and escalate to leader for getting help if needed- Ensure site operating parameters for the finished products launched have been finalized (e.g. costing, minimum of quantity, change over time, change over matrix sequence, site QA standards, lane set up for distribution network…) Show less 2010-2012: Material Requirement Planner is accountable for material availability to support production plan and inventory target  * Material Availability: - Develop and maintain a valid material requirement planning and supplier scheduling in short -term and long-term.- Handle daily communication with suppliers for material deliveries, material issues and improvements.- Identify area where material constraints and cannot support production plan and propose next steps- Execute phase in/ phase out for material changes - Check material availability to support the sudden market demand  * Inventory optimality- Develop and maintain an optimal inventory for material; control unproductive and remnant stock- Lead root cause analysis and action plan to deliver the inventory target- Support warehouse system owner in root cause analysis and action plan for capacity decision Show less

      • Initiative Planner/ Project Leader

        Apr 2012 - Mar 2014
      • Material Requirment Planner

        Jul 2010 - Apr 2012
    • Procter and Gamble Ltd

      Mar 2014 - Feb 2016
      Distribution Requirment Planner

      2014-2016: Distribution requirement planner (DRP) ensures the smooth execution of the planning process in order to guarantee the availability of the product while optimizing customer service, cost and inventory target- Verify the forecast validation/ accuracy together with assess the supply risk and create replenishment recommendation for distribution center.- Build the supply plan basing on the validated sales forecast, production plan, current inventory and distribution network parameters.- Determine the stock and supply parameters according to the objective of service rate, cost and global inventory target.- Manage stock level and analyze obsolete and slow-moving stocks. Define and implement the action.- Analyze the root cause of unfilled cases, propose action plan to be taken preventing further cuts happened.- Analyzing and adjusting the safety level as well as supply parameters quarterly in accordance to global inventory target while maintaining good customer service rate.- Execute the conversion finished product to ensure the availability of phase in code at launch date while keeping monitor shipment/ production of phase out code to minimum remnant. Show less

    • Decathlon VietNam

      May 2016 - now
      Supply Production Leader
  • Licenses & Certifications

    • Distribution Requirement Planner - Basic

      Procter and Gamble Ltd
      Sept 2014
    • Site Integrated Planning- Basic

      Procter and Gamble Ltd
      Sept 2011
    • Toeic

      Sept 2008