Ammar Jabbar

Ammar Jabbar

General Secretary

Followers of Ammar Jabbar2000 followers
location of Ammar JabbarPakistan

Connect with Ammar Jabbar to Send Message

Connect

Connect with Ammar Jabbar to Send Message

Connect
  • Timeline

  • About me

    Manager Mechanical - Project & Maintenance

  • Education

    • Adamjee Govt.Science College

      2010 - 2012
      Intermediate Pre-Engineering A-1

      Activities and Societies: Playing Volleyball , Generate funds for the Flood victims

    • Nasra School Malir Campus

      1998 - 2010
      Matriculation Science A-1

      Activities and Societies: Class Monitor, Captain of School Volleyball team, Captain of School Cricket Team, Debate team member

    • NED University of Engineering and Technology

      2013 - 2017
      Bachelor's degree Mechanical Engineering A-1

      Activities and Societies: Chairman of IMechE NEDUET Chapter in 2016, General Secretary of IMechE NEDUET Chapter in 2015, Captain of Volleyball team

  • Experience

    • Institution of Mechanical Engineers

      Jan 2015 - Nov 2015
      General Secretary
    • Fauji Fertilizer Company Limited

      Jun 2015 - Jul 2015
      Internee

      -Achieved an understanding of machinery and equipment maintenance and got to know about the job environment.-In machinery maintenance I have seen and learned the different aspects of the vehicle shop and workshop and the maintenance of different type of pumps and compressors. Also visit Tool shop and part inventory.-In equipment maintenance I was at the utilities where I achieved understanding of heat exchangers, cooling towers, pressure vessels, valves and other different equipment. Show less

    • Institution of Mechanical Engineers

      Jan 2016 - Nov 2016
      Chairman

      - Organized the biggest national RC plane competition of Pakistan 'PROPELLAIR16'- Organized several other competitions at south level that includes SOFE( Speak out for engineers), Bridge building competition.- Recruit IMechE Executive body and working body for the year 2016 & 17.- Manage co-ordination with different departments of university and other active student societies.- Also recruit sponsors not only for the events but also for the charity work.

    • Pak Suzuki Motor Company Limited

      Mar 2017 - Jul 2017
      Management Trainee

      -Learned about the production process, production planning and material handling in two-month on job training -Maintaining daily production check sheets -Worked in maintenance department, responsible for the preventive maintenance of the mechanical machinery and equipment in paint shop-Also, deal with the daily maintenance issues of cooling towers, welding guns, pumps etc

    • Lucky Cement Limited

      Jul 2017 - Jul 2019

      Operation & Maintenance -Working in operation and maintenance department of 15 MW waste heat recovery powerplant-Actively participated in 15MW steam turbine overhauling & maintenance done by HCTC -Supervise the maintenance and overhauling of boilers, pumps & other machinery & equipment during shutdowns to ensure timely availability of unit -Identify the abnormal parameters, predict potential faults and report/propose the remedial action. ----Also analyse plant operating parameters & raise job cards -Follow-up & supervise the efficient execution of periodic maintenance & stand-by changeover at the plant -Use SAP and manage work requests, work orders, purchase requests, bills etc-Cooling Tower & Condenser maintenance Show less Projects Undertaken (As a Project Incharge)-Erection & commissioning of Heat Recovery Steam Generator (AQC Boiler) having steaming capacity of 14 ton/hr in co-ordination with Sinoma Energy Conservation Ltd -Erection & commissioning of Heat Recovery Steam Generator (SP Boiler) having steaming capacity of 11 ton/hr in co-ordination of with Sinoma Energy Conservation Ltd -Installation of steam and feedwater outdoor pipeline between the boilers and turbine building -Installation of feed-water pump, condensate pump and lube oil cooler. Determined line size for the new condensate pumps Show less

      • Assistant Manager Operation & Maintenance

        Jul 2018 - Jul 2019
      • Trainee Engineer

        Jul 2017 - Jul 2018
    • K-Electric

      Jun 2019 - now

      BQPS-III 900 MW CCPP Project:KE’s flagship project BQPS-III consists installation of two RLNG based units of 450 MW having total cost of 450M USD approx.• As a member of contract finalization team from KE, I was indulged in negotiation with technical counterparts from Harbin Electric International and Siemens. • Coordinated for finalizing Onshore Contract and Schedules as per RFP requirements, technical settlements, and negotiation conclusions of 450 M$ project.• Responsible for Technical Evaluation and finalization of Owner’s Engineer Bid.• Led Basic and Detailed Design Review during technical evaluations with Design Institute and consultantand giving approval on part of KE.• Responsible for co-ordination with base plants, RLNG Supplier and EPC contractor for development & successful execution RLNG infrastructure and interfaces• Coordinated with contractor to address the location plan, construction feasibility and brown field integration for the project.• Responsible for Siemens Power Train installation works (2x SCC5- 4000F)• Responsible for finalization of site management documents and protocols for Mechanical works. RFI, MAS, ITP, MSRA Formats• Review of MSRAs, DCNs and QA/QC documents of individual systems• Carrying out quality control inspections as per approved ITP for all above mentioned structures and works to regulate the execution works as per international standards, design review and approved method statement. • Monitoring of site work progress w.r.t Project Schedule along with monitoring of equipment shipment status.• Responsible for all mechanical site execution works from Client side• Co-ordinated with OE and EPC for all site related technical solutions and decisions• Led all Mechanical machinery/equipment FATs included in project scope Show less BQPS-III 900 MW CCPP Project:• As a member of contract finalization team from KE, I was indulged in negotiation with technical counterparts from Harbin Electric International and Siemens. Coordinated for finalizing Onshore Contract and Schedules as per RFP requirements, technical settlements, and negotiation conclusions of 450 M$ project.• Responsible for Technical Evaluation and finalization of Owner’s Engineer Bid700MW Coal fired Powerplant Project:• Responsible for technical compilation of RFP for 700 MW Coal fired power plant.• Responsible for Bid evaluation, negotiations with contractor & initial design review of 1.1 B$ costed 700 MW Coal fired power plant project.• Technical Evaluation and finalization of Owner’s Engineer Bid for 700 MW project.• Lead for review and implementation of Feasibility Study of RLNG infrastructure of BQPS-III Complex Show less

      • Mechanical Project Manager

        Oct 2023 - now
      • Deputy Manager Mechanical

        Sept 2021 - Oct 2023
      • Assistant Manager - Business Development

        Jun 2019 - Sept 2021
  • Licenses & Certifications

    • Caesar II

      Profex Center
      Mar 2016
    • AutoCAD

      NED University of Engineering and Technology
      May 2013
    • Ansys

      MSLogics
      May 2015
    • Primavera P6

      PIM - Old Page / SHUTTING DOWN SOON
      Oct 2018
  • Honors & Awards

    • Awarded to Ammar Jabbar
      Scholarship Allied Scholarship Feb 2014
  • Volunteer Experience

    • Event Management

      Issued by Institution of Mechanical Engineers
      Institution of Mechanical EngineersAssociated with Ammar Jabbar
    • Youth Facilitator

      Issued by ASHRAE
      ASHRAEAssociated with Ammar Jabbar
    • To recruit sponsors for donation purpose

      Issued by Welfare Work
      Welfare WorkAssociated with Ammar Jabbar