Vladimir Voitenko

Vladimir Voitenko

3nd Engineer

Followers of Vladimir Voitenko269 followers
location of Vladimir VoitenkoKlaipėda, Klaipėdos, Lithuania

Connect with Vladimir Voitenko to Send Message

Connect

Connect with Vladimir Voitenko to Send Message

Connect
  • Timeline

  • About me

    Chief Engineer DP

  • Education

    • Lithuanian Maritime College

      2001 - 2005
      Bachelor's degree Marine Engineering
  • Experience

    • Boskalis

      Jul 2005 - Jul 2007
      3nd Engineer

      Position held 3 Engineer on TSHD Waterway and STHD Coastway. North Sea and Bahrain.Responsible for operation and maintenance of all main and auxiliary machinery. Daily log book and PMS updates, spare parts control, watchkeeping. Align daily activities with 1st Engineer.

    • Stolt-Nielsen Limited

      Sept 2007 - May 2011
      3rd engineer

      Position held 3nd Engineer on Chemical Tanker Stolt Sea and Stolt Vinland/WorldwideMain Activities:Responsible for all HFO, MDO and LO systems, Thermal oil and Steam boilers, Compressed air systems and Auxiliary Engines . Daily log book and PMS updates, spare parts control, watchkeeping. Align daily activities with 2nd Engineer, Work permits and risk assessments

    • Boskalis

      Jul 2011 - Oct 2012
      2nd Engineer

      Position held 2nd Engineer on TSHD Seaway.Main activities and responsibilities Responsible for Deck hydraulic systems and Pump rooms equipment, watchkeeping. PMS and Log book updates.

    • Poseidon Offshore Pte Ltd

      Nov 2012 - Oct 2023

      Offshore Accommodation Vessel ''Aquarius Brasil' DP 2 (K-POS 31)Kind of business: Continuously connected in DP mode to the client's (Petrobras) rigs by means of Marine Aluminum telescopic gangway (38.5 +/- 7 m).Position held Chief Engineer In charge of technical department. Responsible for safe operation and maintenance of all equipment on board, Class Status Reports, Dry Dock Preparations, Annual DP trials and FMEA. Daily, weekly, monthly, quarterly and yearly Technical Reports. Cooperation with Client representatives, Superintendents & Fleet Manager, Technical Director, Vendors and Service companies. Accommodation: 500 persons. Power plant 33.6 MW, 6.6 kV Main Engines - Wartsila 9L38 (4X 5500 kW) & 8L32 (2X3500 kW) Propulsion : Wartsila Retractable thrusters FS225-240 MNR (3 x 1.7 MW)ABB Azipods C - Type(3 x 3.5 MW)Short description of equipment Brunvoll FU74 tunnel thrusters (2 x 1.3 MW) Gangway : Marine Aluminum offshore gangway 36 +/- 7 meters. DP system : Kongsberg KPOS 31 DP reference systems : Kongsberg Spot Track, Radius, Cyscan, Darps. Potable water production plant: RO desalination units SW 8040/15 (2 x 180m3/day) Cranes : 15 and 50 Ton Italgru. Air Conditioning Plant : Johnson Controls CHS compressors 3 x 700 kW and 2 x 575 kW Show less Offshore Accommodation Vessel ''Aquarius Brasil' DP 2 (K-POS 31)Kind of business: Continuously connected in DP mode to the client's (Petrobras) rigs by means of Marine Aluminum telescopic gangway (38.5 +/- 7 m).Position held 1st Engineer Supervising daily operations and maintenance in the engine room andaccommodation.Class Status Reports, Dry Docks. Annual DP trials and FMEA.Daily, weekly, monthly, quarterly and yearly Technical Reports.Daily work planning of Engine department, PMS, work permits andrisk assessments. Cooperation with Client representatives. Accommodation: 500 persons. Power plant 33.6 MW, 6.6 kV Main Engines - Wartsila 9L38 (4X 5500 kW) &8L32 (2X3500 kW) Propulsion : Wartsila Retractable thrusters FS225-240 MNR (3 x 1.7 MW)ABB Azipods C - Type(3 x 3.5 MW)Short description of equipment Brunvoll FU74 tunnel thrusters (2 x 1.3 MW) Gangway : Marine Aluminum offshore gangway 36 +/- 7 meters. DP system : Kongsberg KPOS 31 DP reference systems : Kongsberg Spot Track, Radius, Cyscan, Darps. Potable water production plant: RO desalination units SW 8040/15 (2 x 180m3/day) Cranes : 15 and 50 Ton Italgru. Air Conditioning Plant : Johnson Controls CHS compressors 3 x 700 kW and 2 x 575 kW.Kongsberg KPOS 31 DP reference systems : Kongsberg Spot Track, Radius, Cycan, Potable water production plant: RO desalination units SW 8040/15 (2 x 180m3/day) Cranes : 15 and 50 Ton Italgru. Air Conditioning Plant : Johnson Controls CHS compressors 3 x 700 kW and 2 x 575 kW.Kongsberg KPOS 31 DP reference systems : Kongsberg Spot Track, Radius, Cycan, Potable water production plant: RO desalination units SW 8040/15 (2 x 180m3/day) Cranes : 15 and 50 Ton Italgru. Air Conditioning Plant : Johnson Controls CHS compressors 3 x 700 kW and 2 x 575 kW Show less Conversion of Ro –Ro passenger ferry to Offshore Accommodation Vessel DP2Position held 1st Engineer Ensured that all aspects of an upgrade/conversion project arecorrectly designed, installed, tested and maintained. Attended dailymeetings with vendors and shipyard representatives, performedtroubleshooting tasks, monitored progress, performed tests andconducted audits. DP trials and FMEA DP trials.Cooperation with Vendors, Shipyard, Commissioning Engineers, Superintendent & FleetManager. Show less

      • Chief Engineer

        Jan 2020 - Oct 2023
      • 1st Engineer

        Dec 2012 - Jan 2020
      • 1st Engineer

        Nov 2012 - Feb 2013
    • Prysmian

      Dec 2023 - now
      Chief Engineer

      Cable-laying vessel Prysmian Ulisse.Position held: • Head of the technical department.• Responsible for safe operation and maintenance of all equipment onboard. • Status report, Dry dock preparations • Daily, weekly, and monthly technical reports. • Cooperation with the Superintendent, OIM Kind of business:Ulisse cable-laying vessel is a Prysmian Group cable-laying vessel that has been engineered for beaching and operating in shallow waters, with movements along the route by controlled tension 8-point mooring positioning systems and independent 140 T pulling anchors, allowing her to meet stringent operational requirements. It is capable of simultaneously laying and burial with a variety of tools, including a vertical injector, Rock saw, and Prysmian Hydro plow.Short description of equipment:7000 tons Cable Carousel DRAKA • Pick up arm and cable tensioner 3-ton • Cable tensioners 1x15 ton and 1x7.5 ton, 3-wheel pair and 1-wheel pair. • Tugger winches 2x10 • Cranes: 1x10 tons Jessen&Jessen , 1x3 tons Pax Ocean, 1x20 tons HEILA, 1x2 ton HEILA • Deck space for HVDC installation layout and cable jointing facility, dedicated ROV and WROV locations • 57-person accommodation • An 8-point mooring positioning system comprising winches and swivel head fairleads, an anchor wire 52 mm diameter 1500m maximum length, and single drum Promoter winches. The rated pull of each winch is 60 tons, with a holding capacity of 150 tons. • Spud jacking system 3x55 ton 28 m OSBIT • 4 x Caterpillar Diesel Generators C32, 1175 KVA 994 kW 440 V • 4 x Agrekko power pack, 1500 kW each, 690V. • 2 x Shottle ASD thrusters Show less

  • Licenses & Certifications

    • SOLAS A - VI

      Lithuanian Maritime Academy - LAJM
      Nov 2021
    • Security Training for Seafarers with Designated Security Duties VI/6

      Novikontas Training Center
      Oct 2013
    • Engine Room resource management A-III

      Lithuanian Maritime Academy - LAJM
      Oct 2020
    • Proficiency in Fast Rescue Boats

      Lithuanian Maritime Academy - LAJM
      Dec 2021
    • Chief Engineer III/2

      Lithuanian Maritime Academy - LAJM
      Oct 2020
    • Proficiency in survival craft A-VI

      Lithuanian Maritime Academy - LAJM
      Oct 2020
    • Passenger ship personnel A - V/2

      Novikontas Training Center
      Apr 2018
    • Advance Fire Fighting A - VI

      Lithuanian Maritime Academy - LAJM
      Nov 2021
    • BOSIET + HUET + CA/EBS

      Reval Marine & Offshore Training
      Oct 2022
    • Medical First Aid A-VI

      Lithuanian Maritime Academy - LAJM
      Oct 2020