Sufyan Durrani

Sufyan Durrani

Trainee Engineer

Followers of Sufyan Durrani203 followers
location of Sufyan DurraniBaluchistan, Pakistan

Connect with Sufyan Durrani to Send Message

Connect

Connect with Sufyan Durrani to Send Message

Connect
  • Timeline

  • About me

    Project Director at Balochistan Water Resources Development Sector Project, Irrigation Department

  • Education

    • COMSATS Institute of Information Technology, Islamabad

      2013 - 2014
      M.S. Project Management
    • F.G. Degree College Quetta Cantt.

      1997 - 1999
      HSSC Pre-Engineering
    • Beaconhouse Public School

      1995 - 1997
      O'Levels Physics, Chemistry, Biology, English
    • Balochistan University of Engineering and Technology

      2001 - 2005
      B.E. Civil Distinction with 2 Gold Medals
  • Experience

    • Environment Foundation Balochistan

      Jan 2001 - Jan 2002
      Trainee Engineer
    • National Highways Authority

      Jan 2005 - Mar 2005
      Trainee Engineer

      I received on-site training on quality control by NHA field engineers during construction of the Wangu-Ratodero section of the National Highways. Included in this training were various soil testing techniques as demonstrated by NHA trainers.

    • Balochistan University of Engineering & Technology

      Mar 2005 - Feb 2006
      Lecturer

      • Delivering lectures and conducting written / viva voce examinations for the subjects of Mechanics, Mechanics of Solids, Hydrology and Soil Mechanics to undergraduate students.

    • Public Health Engineering Department

      May 2006 - Feb 2007
      Assistant Engineer

      I was responsible for management and execution of works i.e. water supply schemes and projects within the sub-division. Prepared project documents (PC-I, II & III), engineering specifications, cost and quantity estimates for projects. Noteworthy projects in this regard were water supply schemes in Marsina, Kaza Viala, Walang Haqdad and water purification plant Barshore Town in District Pishin, Balochistan. Prepared request for proposal, reviewed proposals, and participated in the selection of consultants and contractors, administered contracts and monitored work performed. Arranged and supervised the actual works in the subdivision in accordance with sanctioned estimates, specifications and drawings. Maintained check on the property and equipment taken in charge including buildings of pump houses and kept them in proper state of repairs by timely action and wise utilization of government funds. Measured works and recorded them in the measurement books. Complete charge of PHE sub-divisional office at Barshore, District Pishin, Balochistan. Show less

    • Irrigation & Power Department

      Apr 2007 - Feb 2008
      Assistant Engineer

      I performed professional engineering work involving comprehensive engineering studies and projects; designed, modified and/or enlarged irrigation channels and small dams. Prepared project documents (PC-I, II & III), engineering specifications, cost and quantity estimates for projects. Exercised professional engineering judgement in accordance with accepted practices and appropriate laws, codes and regulations. Prepared request for proposals, reviewed proposals, and participated in the selection of consultants and contractors, prepared and administered contracts and monitored work performed. Arranged and supervised the actual execution of all works in the subdivision in accordance with sanctioned estimates, specifications and drawings. Maintained constant awareness of assigned projects to ensure compliance with standards, designated time and cost schedules. Reviewed and commented on a wide variety of plans, specifications, technical reports and studies. Show less

    • Planning Commission

      Feb 2008 - Apr 2013
      Assistant Director

      I was responsible for project management activities and procurement of goods, works and services according to the World Bank and public procurement (PPRA) rules ensuring proper, transparent and effective use of Government and World Bank resources. Reporting directly to the Project Director. Completed procurement assignments ensuring timely delivery and World Bank’s requirements. Managed complete procurement cycle, including advertising, answering queries in pre-bid conference, short-listing/pre-qualification, preparation of Request for Proposal (RFP), Request for Quotations (RFQ), bid receipt and bid opening, evaluating Technical and Financial Proposals, negotiations and drafting contractual terms & conditions. Promoted local capacity building in procurement by conducting workshops. Liaised and coordinated with the World Bank and its supervision missions. Contract Administration/Management and monitoring progress of suppliers and consultants according to the terms of contract. Developed appropriate procedures, controls, checks, rules, etc. preventing frauds, pilferage etc. in the procurement process. Assisted in many researches and analytical work. Kept close contact with concerned officials (focal points) of national and international organizations (World Bank, ADB, JICA) dealing with transport and trade. Maintained proper documentation of all activities and procurements. Show less

    • Trade & Transport Facilitation Unit, Ministry of Commerce

      Apr 2013 - Dec 2013
      Project Management & Procurement Specialist

      Responsible for the overall management and procurement activities of the project, reporting directly to the Project Director. Serve as the focal point for all management and procurement matters and provide comprehensive managerial and procurement support. Spear head development of work plan, scheduling activities, budget and cost control. Responsible for the coordinated management of multiple related activities directed toward project objectives. Maintain continuous alignment of project scope with government’s strategic trade facilitation objectives, and make recommendations to modify the project to enhance effectiveness. Build credibility, establish rapport, and maintain communication with stakeholders at multiple levels, including those external to the organization (government, World Bank etc.). Coach, mentor and lead personnel within a technical team environment. Prepare, monitor and control procurement plan. Prepare bidding documents, evaluating proposals, and management of contracts. Provide guidance to all implementing agencies and maintaining compliance with World Bank and public procurement procedures. Show less

    • Balochistan Integrated Water Resources Management & Development Project, ID, GoB

      Aug 2015 - Sept 2015
      Procurement Engineer
    • Construction of 100 Dams in Balochistan, Irrigation Department, Government of Balochistan

      Sept 2015 - Jan 2020
      Assistant Project Engineer
    • Balochistan Water Resources Development Sector Project, Irrigation Department, Govt. of Balochistan

      Jan 2020 - Sept 2022
      Deputy Project Director / Executive Engineer
    • Irrigation Department, Government of Balochistan

      Jul 2022 - now
      Project Director, Balochistan Water Resources Development Sector Project (ADB funded)
  • Licenses & Certifications

    • Professional Engineer

      Pakistan Engineering Council