Ramesh Dadhich

Ramesh Dadhich

Foreman

Followers of Ramesh Dadhich102 followers
location of Ramesh DadhichGandhinagar, Gujarat, India

Connect with Ramesh Dadhich to Send Message

Connect

Connect with Ramesh Dadhich to Send Message

Connect
  • Timeline

  • About me

    Project Implementation

  • Education

    • Associate Member of Institute of Engineers, Culcutta, India

      1982 - 1984
      AMIE Electronics & Telecommunications Engineering
    • Nirma University, Ahmedabad, Gujarat, India

      2013 - 2014
      Diploma in Management Project Management 2.848
  • Experience

    • Shriram Fertilisers & Chemicals

      Nov 1982 - Jul 1985
      Foreman

      Control and Instrumentation of captive thermal plant

    • Rajasthan Rajya Vidyut Utpadan Nigam Limited

      Jun 1985 - May 2007
      Executive Engineer

      Suratgarh Super Thermal Power Station (5X250 MW), Rajasthan Rajya Vidyut Utpadan Nigam Limited, Suratgarh (Rajasthan); supervised maintenance work of Station C&I (DDC) Package ‘Procontrol System” of Unit-3&4 and ‘Symphony Melody System’ of Unit-5; finalized scope/specifications of C&I packages for proposed Unit-6 Erection, testing, commissioning and maintenance of: ATRS (Turbine Control) Procontrol System supplied by M/s BHEL of Unit-1&2 (1997-1999) DCS (Station C&I) Procontrol System supplied by M/s BHEL of Unit-3&4 (1999-2007) DCS (Station C&I) Symphony Melody System, ABB Germany, supplied by M/s IL Kota Show less

    • Adani Infra (India) Limited

      May 2007 - Mar 2022

      Spearheaded Project Management and Control for EI part of 2X800 MW Godda Thermal Power Plant, Copper Business, Water Business and Due Diligence of various M&A opportunities for Coal Based Thermal Power Plants. Recommending and getting the layout modified and configuring system for better, optimum, efficient and easy maintenance of system for Thermal Plant, Copper Plant and Water Systems. Directing finalization of technical specifications, drawings/ documents. Directing finalization of project schedule, cash flow and deployment of resources.Recommending cost estimates with various aspects involved to support management decision. Show less Spearheaded Project Management and Control for 2X660 MW Kawai, Rajasthan Coal based Thermal Power Plant with consultant M/s DCPL, various china and Indian suppliers, design institute NWEPDI, China and others for material delivery and erection, testing and commissioning as per Project schedule. Steered following tasks:o Reviewing & finalizing:• L1/L2 Schedule in line with management objectives.• S Curves for execution as well as financial to meet the targets• Annual Budget for supplies, services and other pre-operative expenses• Monthly Cash Flow requirements • Various MIS as per Management guidelines o Finalizing:• Technical aspects in consultation with engineering group, erection methodology in consultation with site team, and deployment of various resources like contractor manpower, material handling /erection equipment as per project requirement.o Recommending and getting the layout modified and configuring system for better, optimum, efficient and easy maintenance of system Directing finalization of project schedule, cash flow and deployment of resources. Show less Spearheaded detailed engineering with consultant M/s Fichtner, The Suppliers M/s SCMEC, China, design institute NWEPDI, China and others for finalization of specifications of all C&I equipment and control logics with protections & Interlocks for entire C&I system for 4X330 MW Mundra Power plant Steered following tasks at Distributed Control System for BTG:o Reviewing & finalizing:• Process & Instruments Drawings (PIDs) furnished by SCMEC (BTG Supplier) for Phase-1 & 2 & so on 4X330 MW Units in respect of C&I Part; prepared database as per finalized PIDs• Technical offer furnished by M/s GE, China and incorporated significant requirements for better and efficient operation of the system• Drawings & Documents furnished by supplier• Spares requirement for trouble-free operation of the system o Finalizing:• Technical specifications, hardware/software and instruments for DCS System, System Configuration, Network Frame, I/O Listing Grouping of Controllers, Panel Layout, SOE, Alarm List, Hart List, History in DCS with SCMEC/GE/ BSTG vendors to get maximum efficiency of the system• Technical aspects, erection, testing of DCS System of 330MW Unit-1 including discussions with supplier GE Xinhua, NWEPDI, SCMEC for C&I workso Recommending and getting the layout modified and configuring system for better, optimum, efficient and easy maintenance of system Directing finalization of technical specifications, drawings/ documents in respect of C&I Part for all BOP sub systems; conducting review and technical analysis of tenders, reviewed drawings and documents, inspecting, arranging delivery and supervising erection, testing and commissioning of UPS system for DCS and all BOP packages Show less

      • Associate Vice President

        Aug 2020 - Mar 2022
      • Associate Vice President

        Apr 2016 - Aug 2020
      • General Manager

        Apr 2010 - Mar 2016
      • Sr Manager

        May 2007 - Mar 2010
    • Aditya Birla Renewable Co

      Apr 2022 - Mar 2023
      Site Head

      Successfully Implemented 2X78 MW Solar Project with a team of 25 employees.

    • Torrent Power

      Jul 2023 - now
      Site Head

      Heading Team of 50 Employees for Implementation of 2X150 MW Solar Project

  • Licenses & Certifications

    • Certificate in Project Management

      Institute of Project Mangement Certification
      Aug 2011