Anthony Ceroni

Anthony Ceroni

Followers of Anthony Ceroni287 followers
location of Anthony CeroniDecatur, Illinois, United States

Connect with Anthony Ceroni to Send Message

Connect

Connect with Anthony Ceroni to Send Message

Connect
  • Timeline

  • About me

    Quality Manager at Caterpillar Inc.

  • Education

    • University of Wisconsin-Platteville

      2002 - 2004
      Bachelor of Science (B.S.) Mechanical Engineering 3.7

      Activities and Societies: Tau Beta Pi

    • Highland Community College

      2000 - 2002
      Associate of Science (A.S.) General Studies- Engineering
  • Experience

    • Caterpillar Inc.

      Jan 2005 - Dec 2007

       Managed 16 hourly employees on four machining lines (3600 Blocks and Rods, 3520 Blocks, and C-175 Blocks) Improved employee engagement by 22% over previous year. Achieved record-level production levels on all four lines in 2006. Oversaw a 10% efficiency gain from 2005 to 2006 across all lines Reports sustained a total of 2 injuries in 2006 (0 recordable, 0 lost time). Reduced cost per cylinder on 3600 rods by 9%, resulting in $119K savings vs. 2005 level. Reduced cost per cylinder on 3520 blocks by 28% resulting in $776K savings YTD vs. 2005 level. Reduced 3600 Block Line’s scrap cost per cylinder 74% ($20.32) from 2005 levels. Maintained 98% or greater delivery performance on all lines. Provided coaching and facilitated transition of two technicians into company positions. Show less

      • Manufacturing Engineer

        Jan 2007 - Dec 2007
      • Operations Supervisor

        Jan 2006 - Dec 2006
      • Logistics Planner

        Jan 2005 - Dec 2005
    • Caterpillar Inc.

      Feb 2008 - now

      Supervisor over a team of 3 people executing Quality Control processes at Caterpillar's Decatur, IL manufacturing plant. Responsiblities include:- Managing quality issues between the Decatur facility and other Caterpillar plants and reporting outbound quality levels (in PPM) on a monthly basis. - Planning of Quality Inspection process for inbound material to Decatur facility in alignment with APQP principles.- Lower Powertrain Quality - Execution of Caterpillar Quality Management System in alignment with Lean Built In Quality principles.- Stopping the flow of product defects as close to the point of generation as possible, running containment and establishing rapid interim corrective action (ICA) and robust permanent corrective action (PCA).- Facilitating communication between the factory Operations team and Engineering team to resolve quality issues.- Fostering professional growth and development of 3 full time management employees. Show less -Deployment of quality initiative on prime product assembly lines that in a 79% reduction in defects per unit (DPU) found at pre-delivery inspection prior to shipment of machine to customer.-Oversight of Assembly area compliance to Caterpillar Production System principles.-Ran transformation project on inbound logistics that reduced $8M in pipeline inventory and improved receipt posting to warehouse storage in less than 24 hours by 25%.-Ran two rapid projects to move kitting operations from off site to on site warehouse that delivered $835K in savings.-Ran rapid project to in-source tire build from transportation vendor that reduced tire build cost by $401 per domestic unit and $143 per export unit, delivering $125K in savings.-Ran two rapid projects to in-source subassembly areas from third party provider netting a combined $250K in savings.- Ran project to improve receiving operations that allowed for a 27% in receipts processed from 2010 to 2011 and generated $110K in savings. - Ran 3PL Contract Management project that put in place standardized job codes for 3rd Party Logistics employees and 3PL performance management via a metrics dashboard. Generated $427K in savings.-Ran transformation project for kitting that created 7,376 new storage locations, reduced kit picking cycle time by 8 minutes per kit, increased inventory record accuracy by 16% and generating a savings upon closure of $1.9M. Show less - Oversaw a 40% reduction in usage of steel banding across the Decatur facility and 95% reduction in usage of steel tubs on motor grader assembly line. - Implemented kanbans for finished motor grader front axles and miscellaneous after paint assembly parts that led to a $90,000.00 reduction in inventory.- Oversaw design of new product packaging that generated $1.5M in savings.- Oversaw planning of material replenishment for the consolidation of two assembly lines in separate builldings into one.- Implemented wrapping process for kit carts and incoming engines and transmissions to improve contamination control.- Oversaw drafting of Standard Work instructions for receiving, storage, kitting, and distribution operations.- Supported introduction of Tier 4 new product implementation programs through timely processing of engineering change orders and loading of packaging requirements into database. Show less

      • Quality Supervisor

        May 2016 - now
      • Project Manager

        Aug 2010 - Apr 2016
      • Deployment Champion- Caterpillar Production Systems

        Apr 2009 - Jul 2010
      • Process Engineering Supervisor

        Feb 2008 - Mar 2009
  • Licenses & Certifications

    • 6 Sigma