Irfan Ahmed

Irfan Ahmed

Assistant Manager

Followers of Irfan Ahmed2000 followers
location of Irfan AhmedAbu Dhabi Emirate, United Arab Emirates

Connect with Irfan Ahmed to Send Message

Connect

Connect with Irfan Ahmed to Send Message

Connect
  • Timeline

  • About me

    Line Manager (Tissue Manufacturing) at Fine Hygienic Holding

  • Education

    • Govt. Pilot High School

      2008 - 2010
      Matriculation Physical Sciences 984/1050

      Activities and Societies: cricket, badminton

    • UNIQUE COLLEGE

      2010 - 2012
      Intermediate Pre-Engineerig 1003/1100

      Activities and Societies: Poetry, cricket, badminton

    • University of Engineering and Technology, Lahore

      2012 - 2016
      Bachelor of Science (B.S.) Mechanical Engineering 3.50/4

      Activities and Societies: Student Projects, American Society of Mechanical Engineers, Pakistan Students Welfare Organization During four years of my graduation I learnt team work, management, leadership and networking besides a lot of engineering concepts.

  • Experience

    • ASME (The American Society of Mechanical Engineers)

      May 2013 - Jan 2014
      Assistant Manager

      For year 2013-2014 Renewable Energy Section worked on a project "Ice Cooled Air Conditioner"As assistant manager my responsibilities included;>Organize meetings of all members>Giving presentations on project progress>Assigning work to members considering their interests

    • ASME (The American Society of Mechanical Engineers)

      May 2014 - Apr 2015
      Manager Renewable Energy Section

      For year 2014-2015 Renewable Energy Section of ASME UET worked on project " E-Bike with concept of Regenerative Braking"As manager my responsibilities included;>Selection of project for the section>Mailing relevant articles and data to Assistant Manager>Reporting project progress to Director Technical Sections>Approving work done by members

    • Nestlé

      Nov 2015 - Jan 2016
      Project Intern

      PROJECT TITLE: ENERGY AUDIT & EFFICIENCY IMPROVEMENT OF BOILER– Leadership: Led a team of four members to energy audit a fire tube boiler of capacity 20TPH at Nestle’s Sheikhupura factory. Improved efficiency of boiler by 5% to save fuel with vision to minimize global warming – Analytical Skills: Studied PFDs and P&IDs thoroughly to take readings for energy audit

    • Descon Engineering Limited

      Feb 2016 - Jun 2016
      Project Intern

      – Teamwork: Worked with three interns to thermally design economizer for a dual fueled fire tube boiler to improve its efficiency by 4% to save fuel– Software Skills: Developed MS Excel sheet for iterative calculations and report writing included use of MS Word

    • Bullehshah Packaging

      Jul 2016 - Apr 2017
      Maintenance Planner

      Its biggest paper and board mill in Pakistan. Prestigious and world-wide known StoraEnso holds almost half the shares. Responsibilities:– Planning:Conducted site visits to allocate man-hours and define resources and materials needed to perform the job– Scheduling: Scheduled weekly and shutdown maintenance tasks and development projects using SAP by having strong coordination with production department– Execution:Made sure on field execution of planned activities by arranging necessary resources in time to enhance compliance of maintenance plan– Inventory Control:Monitored inventory and ordered materials needed for routine maintenance tasks and development projects if not available in sufficient quantity – Budget & Resource Optimization: Optimized usage of resources (manpower, lifters, cranes) and continuously monitored costs against each work-order and on monthly basis to ensure compliance with maintenance budgetAchievements/Improvements– Introduced Supervisors Appraisal Schemethat improved manpower efficiency and enhanced wrench time.– Introduced new scaffolding method that reduced time needed for scaffolding by 50% – Developed various protocols to avail supports of other departments immediately during maintenance minimizing the delays, improving wrench time, and enhancing intra-department coordination– Improved the compliance of maintenance plan from average of 60% to average of 85%ProjectsWorked on following projects; ordering of materials as per BOQ, planning and scheduling of mechanical, civil, electrical, instrumentation and piping activities, interactions with execution crew to monitor work progress– HVAC System installation in MCC Room (in-house cooling load calculations)– Installation of Screen at CTMP Plant– Installation of Anti-Condensation Ceiling on Re-winder Machine Show less

    • APEX-MEP

      Apr 2017 - May 2017
      Mechanical Design Engineer

      - Meeting with clients to state their requirements technically- Design drainage system, HVAC, water supply network, fire fighting and fire alarm systems as per UAE standards- Be in touch with with client throughout project to ensure client satisfaction and to accomodate any change in requirements during execution of projects- Inspection of installed systems as per UAE standards

    • Crown Paper Mill

      Aug 2017 - Sept 2021

      PM3 is the latest and largest tissue machine not only at CPM but also in UAE with production capacity of 180TPD. My responsibilities as shift leader here include following tasks;>Production planning and management>Quality Assurance>Optimization>Minimizing downtime>Training shift staff about new policies and procedures>Innovations and improvements using tools such as lean, six sigma, statistical process control etc>Leading operators and supervisers>Maintaining various reports such as ISO IMS system Show less Tissue Machine Details:Valmet Supplied 200DCT, 5.6m deckle, 2200m/min design speed, Visconip Shoepress, 13-24 gsm range, Disc Filter white water system, Automatic Balance Control (ABC) Hood SystemMy Involvement In Project:–Inspection of P&ID’s in field and report non-conformities to Production Manager–Attended class-room and in field trainings arranged by Valmet Ltd. for future operation of machine–Thoroughly studied the technical manuals of machine–Gave internal trainings to CPM operators to ensure smooth operation of machine in future–Acted as coordinator between Solenis Ltd ( Chemical Supplier) and Valmet Ltd for the chemical system installation and its integration with DCS system –Developed Standard Operating Procedures (SOP’s) for all the future operations and activities of PM3. These SOP’s were made considering efficient operations, manpower and equipment safety Show less

      • Shift Engineer PM3

        Mar 2019 - Sept 2021
      • Start-Up and Commissioning of PM3

        Nov 2018 - Mar 2019
      • Shift Leader PM2

        Oct 2018 - Nov 2018
      • Shift Leader PM1

        Aug 2017 - Oct 2018
    • Fine Hygienic Holding

      Oct 2021 - now

      To summarize the role is about loss elimination (any kind of loss-8 types of wastes), being start-up leader of new equipment from Factory Acceptance Test (FAT) till Site Acceptance Test (SAT) and onwards ensuring accelerated start-up. Furthermore one of the key deliverables is increasing capability of teams through continuous training and coaching.At the site we have IWS system deployed and are using IWS tools such as LIR, UPS, WPI, WTM/WPA etc on regular basis to support us deliver the above mentioned deliverables. Show less

      • Category Line Manager

        Jul 2024 - now
      • Process Engineer

        Oct 2021 - Sept 2024
  • Licenses & Certifications

    • Lean Six Sigma Green Belt Certification

      University System of Georgia
      Sept 2021
      View certificate certificate
    • Six Sigma Yellow Belt Certification

      University System of Georgia
      Aug 2020
      View certificate certificate