Victor Campos  V.

Victor Campos V.

Production Assistant

Followers of Victor Campos  V.4000 followers
location of Victor Campos  V.Peru

Connect with Victor Campos V. to Send Message

Connect

Connect with Victor Campos V. to Send Message

Connect
  • Timeline

  • About me

    Civil Eng.| Project Manager | Construction Manager | Contract Manager | MBA | PMP® | PMI-RMP®

  • Education

    • Universidad de Piura

      2008 - 2009
      Diplomate in Project Management based on PMI
    • Universidad de Piura

      2000 - 2005
      Civil Engineer Civil Engineering

      Activities and Societies: Tercio Superior

    • Universidad Peruana de CIencias Aplicadas

      2022 - 2024
      Master en Dirección de la Construcción Construction Management
    • PAD - Escuela de Dirección de la Universidad de Piura

      2010 - 2012
      Master of Business Administration MBA
  • Experience

    • Dino S.R.L. (Cementos Pacasmayo)

      Mar 2007 - May 2007
      Production Assistant

      •Premixed concrete quality control.•Concrete mix design.

    • GyM S.A.

      May 2007 - Oct 2009

      •Field Engineer in charge of the civil works of zinc roaster, gas cleaning and acid plant, disposing efficiently human, materials, financiers and technological resources in order to accomplish the quality requirements of and time of the construction , optimizing the project cost-saving results. Management of 70 to 100 workers in their different activities. •Supervisor of Subcontractors responsible for the HVAC, architecture and finished project, daily monitoring of work progress according to the work schedule, review of work schedule, certification of constructive quality on site (materials, tools, equipments, personnel), and also management of the daily news of work. •Responsible for corrective remarks in different areas.•Execute the timing diagram and critical path studies. •Planning, scheduling and control of field works (manpower and materials). Show less •Field Engineer and activities coordinator for work personnel. Management of 70 to 100 workers in their different activities. •Supervisor of COPER Subcontractor (Responsible for the architecture and finished project), daily monitoring of work progress according to the work schedule, review of work schedule, certification of constructive quality on site (materials, tools, equipments, personnel), and also management of the daily news of work. •Provide efficiently human resources, materials, financial and technological in order to accomplish the quality requirements and construction time, optimizing the company cost-saving results. •Execute the timing diagram and critical path studies. •Planning, scheduling and control of field works (manpower and materials).•Responsible for corrective remarks in different areas in the mine.•Elaboration and sustain the quotations for Gold Fields La Cima S.A. Company (Contract 1550 GyM).•Responsible for the progress control of the civil works of the project.•Realization of the civil works´ quantities.•Construction material requirement.•Solution planning in cases of civil drawing incompatibilities. •Improvement of technical inquiry process to the client. Show less

      • Project Control Engineer - Phosphate concentrator plant - VALE Mine

        Sept 2009 - Oct 2009
      • Field & Technical Office Engineer - CAJAMARQUILLA 320K PROJECT (Votorantim Metais)

        Jun 2008 - Aug 2009
      • Field & Technical Office Engineer - Cerro Corona Mine Project (Gold Fields La Cima S.A.)

        May 2007 - May 2008
    • Kallpa Generacion S.A.

      Nov 2009 - May 2012
      Project Coordinator - 854 MW Combined Cycle Conversion Project

      •Supervised earthworks, reinforced concrete structures, special foundations and steel structure erection during the construction of the conversion to combined cycle of an existing 3 gas turbines (574 MW) through the installation of a 280 MW steam turbine.•Properly managed project objectives and plans; including delineation of scope, budgeting the project contract value of USD 400 MM, reviewing and approving the monthly payment certificate from the main contractor (POSCO E&C).•Systematically managed the project schedule, key milestones control, implemented corrective action plans for any delays and held project update meetings. Achievements:•Successful execution of the project; within scope, budget and on schedule. Show less

    • Cerro del Águila S.A.

      May 2012 - Jan 2017
      Site Manager - Intake Works - 525 MW Hydroelectric Power Plant Project

      •Responsible for overseeing all field construction activities carried out by GyM-Astaldi where successfully lead a multi-disciplinary team of 14 engineers during construction of the gravity dam (500,000 m3 of RCC and conventional concrete), deviation and headrace tunnels (4 km.), intake structure (15,000 m3 of concrete), 10 MW mini hydroelectric power plant (8,000 m3 of concrete), 2200 kV transmission line and substation, and infrastructure facilities such as access roads, bridges, permanent camps and industrial plants. •Efficiently monitored and controlled contract progress, focusing on the project schedule, compliance with technical specifications, drawings, construction procedures, as well as meeting safety and quality standards. •In charge of final reviews and approval of monthly payment certificates, negotiating contract variations, additional work scope and claims submitted by the main contractor (contract valued over USD 700 MM).•From October 2016 to January 2017, during the operation of the plant, worked as senior Civil Engineer in charge of civil works maintenance, addressing civil works items contained in the punch list and supervision of additional civil works.Achievements:•Participated in technical team meetings that resulted in a decrease of 50% of the claim submitted which amounted to USD 100 MM.•Completed the Project within the scope, timeline and foreseen budget. Show less

    • Deloitte

      Feb 2017 - Jan 2019
      Contract and claims Manager at PMO (Talara Refinery Modernization Project)

      •Leading the team in charge of the contracts management, properly evaluate the merits of the contractor’s requests and to establish strategies for construction claims prevention, mitigation and management

    • Arcadis

      Jan 2019 - Aug 2021
      Deputy Project Manager - Quellaveco Project (Anglo American)

      • Leading the team in charge of construction support, QA, Field engineering and record engineering in mine tailing disposal system that includes earthfill starter dam (2MM m3), drains and a subdrain a seepage collection system (conveyor channel, seepage collection sump, spillway) and the instrumentation of the dams, overland conveyor tunnel, tailing tunnels, access roads, tailing channel, and bridges.• Responsible for the delivery of engineering solutions (designs and EETT) and responses to RFIs from contractors to the AAQ/SMI client, following coordination and review of solution alternatives with technical specialists from the central office and field.• Responsible for fostering strong client relationships and negotiating project scope expansion. Show less

    • CONSORCIO BESALCO STRACON

      Jan 2022 - Aug 2024
      Project Director / Site Manager (NEC 3: Engineering and Construction Contract Option F)

      • Manage the project whose scope is the elaboration of the engineering and constructing Package 2 of integral solutions which consists of three sub-projects:1.-Tumbes Riverbank Defenses: In design phase (estimated amount: S/ 1,600 million soles), primarily involving 104 km of longitudinal dikes along the river and contributing streams.2.-Corrales Creek Riverbank Defenses (S/ 80 million): The project includes the construction of 5 km of longitudinal dikes, 2 transverse dikes (250 m and 150 m), 6 km of access roads, culverts and fords, construction of DME's and DMO's, and the landscaping areas.3.-La Jardina Creek Riverbank Defenses (S/ 40 million): The project includes the construction of 1.6 km of longitudinal dikes, 2 transverse dikes (100 m and 60 m), 2.5 km of access roads, culverts and fords, DME's and DMO's, and landscaping areas.• Managed and directed project execution and progress to ensure adherence to the schedule within budget constraints in accordance with our contractual obligations.• Managed a multidisciplinary team comprising engineering, construction, technical office, HSE, contracts, land release, social, and quality assurance.• Oversaw financial control (cash flow, operating results).• Fostered and maintained client relationships within the project to ensure collaborative partnerships. Show less

  • Licenses & Certifications