
Mário Frasinelli Silva
RF Engineer (Oi/Vivo/Claro 2G/3G RNP/RNO)

Connect with Mário Frasinelli Silva to Send Message
Connect
Connect with Mário Frasinelli Silva to Send Message
ConnectTimeline
About me
RF Engineer
Education

FAMEESP (Faculdade Metropolitana do Estado de São Paulo)
2021 - 2022Postgraduate Degree Data Science and Big Data Analytics
Externato São José
1989 - 1996Basic Education Basic Education
Universidade de Taubaté
2001 - 2005Bacharel Telecommunicationdefended the standard of digital television to be adopted in Brazil

Universidade de Taubaté
1997 - 2000Technical Education Eletronic
FGV - Fundação Getulio Vargas
2016 - 2018Master of Business Administration - MBA Project Management
Experience

AIRCOM International
Aug 2005 - Jul 2008RF Engineer (Oi/Vivo/Claro 2G/3G RNP/RNO)Vivo GSM/UMTS – Huawei Project – RNO: November/2007 – July/2008 – Porto Alegre, RS – Brazil- Responsible for 2G Optimization based KPIs (Logical / Physical Changes), Traffic Analyses (TRX´s Expansion), New Sites Planning (RF Parameters), Creation in the BSC and Implantation 1.900/850 MHz.Claro UMTS - Huawei Project - RNP: June/2007 – November/2007 – Lima -Peru / Recife, PE - Brazil - Pos-processing using TEMS, Nemo Analyzer, MapInfo and Ranopt to Acceptance Reports elaboration (Customer approval), Cluster reports elaboration showing improvements and Coordination of Drive Test Teams.Vivo GSM Huawei Project - RNP / RNO: December/2006 – June/2007 RNP/RNO – Porto Alegre - RS- Pos-processing using TEMS and MapInfo to Acceptance and Optimization Reports, answering complains from the costumer (Complain Reports), Training for new Drive Test Teams and coordination of 25 Aircom DT Teams.Claro / Oi GSM Drive Test Project - RNP: August/2005 RNP – December/2006 – Northeast of Brazil - Drive-test Performance in GSM/GPRS, Search Ring and Reports Elaboration: PDRF, QRF, PFRF, TSS, DT Reports Acceptance with commentaries for Optimization. Show less

Alcatel Lucent Latam
Jul 2008 - Apr 2009RF Design Engineer (Oi GSM RNP)- Responsible for New Sites Planning and Quality (Prediction, Link Budget, Neighbor, RF Logical-Physical Parameters and KPIs Analyses), Coordination and Analysis Drive Test (Acceptation and Cluster) and Reports elaboration: PDRF, TAD, TAP, Acceptance and SITAR for Oi GSM Network.

Huawei Technologies Co., Ltd.
Apr 2009 - May 2011- Responsible for All Sites of Santa Catarina State monitoring the KPIs (Worst cells) in: * Accessibility – CSSR: Resources of CEs, Codes, Users, Licenses, Power / Extended Coverage / Pilot Pollution / Parameters / Boards and Failures after Admission-TX * Drops Calls - CDR: Overshooting and Coverage Hole (RSCP), Neighbors, IRAT, RTWP and IuR;- Parameters Audit and Assisting customer complaints making Traces in NodeB (3G).- Document Analysis 2nd Carrier, SSV, PDRF, QRF, PFRF, Sitar and Radiometric Report;- Improve the Throughput of the Sites (VC Configuration, IuB Congestion and Activated 64QAM);- Proposed New Sites for the Quality of the network expansion program;- Drive Test Coordination and Analysis (Cluster, VIP and Acceptance).Oi GSM/UMTS (Oi GSM/UMTS - SWAP): April/2009 – June/2010 – PR/SC/RS/CO - Brazil:- RF Team Leader: Coordination of the RF Engineers and Customer Interface (Weekly Meeting);- KPIs Analyses and troubleshooting for the New and Swap Sites (w/ Physical and Logical Parameters);- Responsible for RF Parameters Application in BSC/RNC for the best Performance (KPI);- Drive Test/TSSR Coordination and Analysis (Cluster, VIP and Acceptance);- Scenery Study and Application for the best option of the Swap Sites (Hot-Swap);- Sitar, VSWR, Radiometric Report, All Sites elaboration, analyses and Update;- Traffic and E1 Analyses to Expansion (TRXs and Technology); Show less - RF Team Leader: Coordination of the RF Engineers and Customer Interface (Weekly Meeting);- KPIs Analyses and troubleshooting for the New and Swap Sites (w/ Physical and Logical Parameters);- Responsible for RF Parameters Application in BSC/RNC for the best Performance (KPI);- Drive Test/TSSR Coordination and Analysis (Cluster, VIP and Acceptance);- Scenery Study and Application for the best option of the Swap Sites (Hot-Swap);- Sitar, VSWR, Radiometric Report, All Sites elaboration, analyses and Update;- Traffic and E1 Analyses to Expansion (TRXs and Technology); Show less
RF Engineer (Claro Optimization 3G Project)
Jun 2010 - May 2011RF Engineer (Oi SWAP/ RNP/Initial Tunning 2G/3G Project):
Apr 2009 - Jun 2010

Ericsson
May 2011 - Aug 2014- Responsible for Cluster in Capital City of Angola (Luanda) for RNP&O- RNP (2G/3G) Responsible for the capacity, geographical Coverage and Commercial Target;- RNO by Worst Cells Monitoring (KPI), Costumer Complains and Drive Test;- Weekly Analysis Worst Cell 2G (SDCCH and TCH Congestion, Assignment and Drop / HO Success)- Weekly Analysis Worst Cell 3G (Resources-CEs, Code, Power, Users, Licenses, Parameters Inconsistencies, Handover Success, Transmission Load and Extended Propagation Delay) - Creation of XML to New Sites 2G/3G with All the physical and Logical parameters (CCR);- Selection the best equipment Version (CAPEX) and Application of New Features;- 4G Performing Monitoring Analysis (Worst Cells);- SWAP Network Parameterization Mapping from Alcatel to Huawei (adaptation to new hardware);- KPIs Formulas Parameterization Mapping to Huawei, Ericsson and Alcatel;- SWAP Process Evaluation (KPIs, RF Physical and Logical Parameters and Alarms). Show less
RF Engineer (Sprint Modernization 3G/4G Project)
Nov 2013 - Aug 2014RF Engineer (Unitel Optimization 2G/3G/4G Project)
May 2011 - Nov 2013

Nokia
Sept 2014 - Aug 2020- Integration Local Manager responsible for all activities in RJ/CE/PI as Application/Monitoring of New Features, Modernization/Upgrade of Software/Hardware in BSS/BSC/RNC and Troubleshooting;- KPI Monitoring and Optimization (GSM/UMTS/LTE) managing “D+1”, “D+7”, DT and All Reports;- XML Creation to New/Modernization Sites 4G with All the physical and Logical parameters;- RF Design/Planning for New Sites, Data Fill, Performance Check and Initial Tuning;- Drive Test Coordination and Analysis (2G/3G/4G) and Survey/TSSR Audit;- Customer Interface and guarantee the Service/Performance Quality reaching the goals;- Helping Nokia programmers develop Artificial Intelligent Toll for prediction Worst Cell in the Customer;- Traffic study to reduce WCDMA Carrier to improve LTE Throughput (Refarm).- During the project Identifying Add-On sales opportunities + Resources Control and Manager Show less
RF Engineer (Oi RNP/RNO 2G/3G/4G Project)
Jan 2017 - Aug 2020RF Engineer (Claro RNP/RNO 2G/3G/4G Project)
Sept 2016 - Jan 2017RF Engineer (Claro Capacity 3G/4G Project)
Sept 2014 - Aug 2016

Connect 5G, Inc.
Nov 2020 - Apr 2022RF Engineer in U.S. Cellular- NBIoT Project U.S. Cellular: Performing NB IoT integration and Initial Tunning (Nokia)- 5G Modernization Project U.S. Cellular: Supporting the team with troubleshooting, configuration and alarm monitoring in CDMA-EVDO (Nortel), LTE (Nokia / Ericsson) and 5G (Nokia / Ericsson)

Nokia
Apr 2022 - Apr 2023RF Optimization Engineer in Claro- Radio Optimization of LTE/5G network to troubleshoot and improve KPIs Analysis of KPIs, investigation and improvement of Network Quality problems;- Responsible for Capacity Management, Coordination of Activities and distribution to the team; - LMS Optimization between technologies leaving all layers balanced and when necessary indicating expansion or new sites for the customer.

RemOpt
Apr 2023 - nowRF Optimization Engineer in Algar Telecom- Cluster Owner, working to improve KPIs and 3G/4G/5G user perception of networks; - KPI and drive test analyzes to improve network coverage and quality; - 4G capacity study to expand carriers and/or a new 5G site implamantation; - Responsible for implementing voice and data traffic strategy between technologies (3G/4G/5G); - Network Optimization: logical (parameters and features), physical (azimuth, tilt) and 5G initial tuning.
Licenses & Certifications

CDMA Technology
Aircom International
Connect v5.0
Aircom International
GSM and WCDMA Planning with Asset v5.2
Aircom International
GSM System Survey
Ericsson
GSM Technology and Optimization
Aircom International
Introduction to GSM
Ericsson
Parameters and Equipment Huawei 2G
Huawei
Ranopt v5.2
Aircom International
UMTS Technology and UMTS Planning
Aircom International
Introduction to LTE and Main Parameters to Optimization
Ericsson
Languages
- poPortuguese
- enEnglish
- spSpanish
Recommendations

Greg a. paul, p.e.
Project Engineer Principal - Engineering & Technology - Operations at Lockheed MartinFort Worth, Texas, United States
Udaysingh pawar
Software developer 👨🏻💻 | Deloitte USIHyderabad, Telangana, India
M imran sheikh
Quality Head - Rolling Stock & ComponentsKolkata, West Bengal, India
Giedre domkute
Managing Partner at AAA LawVilnius, Vilniaus, Lithuania
Julie doan-prévost
Emissions Specialist at AEREdmonton, Alberta, Canada
Viviana jordão
Social Media Manager na LUVIN - CONTENT & DIGITAL PRTorres Vedras, Lisbon, Portugal
Lisba romo
Founder of Be Brave. Be You, LLC.Greater Chicago Area
Moritz hannappel
Sportreporter im Regionalsport bei Rhein-ZeitungTreves, Rhineland-Palatinate, Germany
Jean-philippe calvo
Responsable Conduite ExploitationGreater Mulhouse Area
Beata pawlusińska
Senior Specialist Kielce University of TechnologyKielce, Świętokrzyskie, Poland
Ashley viana
ExploringUnited States
Katie cirianni-jones
Undergraduate majoring in Health Sciences at Stockton UniversityHopewell, New Jersey, United States
Diana garcía
VP of AI Research & Innovation at LottolandGibraltar, Gibraltar
Ugne leseviciute
Information Manager | Data AnalystLithuania
Tansu malçuk
Accounting and Finance ManagerIstanbul, Istanbul, Türkiye
Rocío fonseca chinchilla
Scrum Master | Product Owner - Project Manager en PGD LATAMCurridabat, San Jose, Costa Rica
Abhishek bhanderi
M.Sc in Robotics | Project Manager-IoTRuhr Region
Bedirhan sönmez
Mersin University - Studying Electrical and Electronics EngineeringMersin, İçel, Türkiye
Deepthi kalavala
Assistant Professor, KL University, HyderabadHyderabad, Telangana, India
Kuldeep sharma
Delivery Manager at Acuity Knowledge PartnersGurgaon, Haryana, India
...