Efron Dwi Poyo

Efron Dwi Poyo

Project Completion

Followers of Efron Dwi Poyo1000 followers
location of Efron Dwi PoyoJakarta, Jakarta, Indonesia

Connect with Efron Dwi Poyo to Send Message

Connect

Connect with Efron Dwi Poyo to Send Message

Connect
  • Timeline

  • About me

    Looking for a new job.

  • Education

    • Gadjah Mada University (UGM)

      1986 - 1993
      S1 Soil Sciences
    • Jakarta Theological Seminary

      2001 - 2003
      Master Humanities/Humanistic Studies
    • SMA 1 Yogyakarta

      1983 - 1986
      High School IPA/Natural Sciences 3
  • Experience

    • Oil/Gas/Energy/EPC Company

      May 1993 - Oct 2005
      Project Completion

      Istana Karang Laut, PT, 2000 - 2005Oseil Field Development Project, Seram Island, KUFPEC Ltd.Austindo Resources Inc., 1999 - 2000Material Inventory & Documentation System for Mining DevelopmentAmoseas Indonesia Inc., 1997 - 1999Darajat II Geothermal Development ProjectTripatra Engineers and Constructors, PT, 1993 - 1997Arun Field Booster Compression Project, Mobil Oil Indonesia Inc.South Lhoksukon A & D Fields Development Project, Mobil Oil Indonesia Inc.Optical Fiber Cable Network & Microwave System Project, Excelcomindo Pratama (GSM-XL), PT Show less

    • Thiess Indonesia

      Oct 2005 - Dec 2010

      Develop, implement, supervise and monitor Practical Completion Procedure to ensure construction schedules of the Production Module and the Power Plant are consistent with pre-commissioning, commissioning, and start up schedule. Isolate the test systems and authorize the Pre-commissioning Team to do the test. Coordinate and instruct the inter-disciplines leaders at field when commencing and running the testing of the equipments.Supervise the plant operations to be handed over to the owner (PT Kaltim Supacoal). Show less Develop, implement, supervise and monitor all Mechanical Completion and Facilities Acceptance Procedures.Define all system boundaries, issue and implement the documented breakdown of facilities. Ensure construction schedules are consistent with pre-commissioning, commissioning, and start up schedule. Ensure timely inspections as per Discipline Acceptance Procedure are carried out with EPC contractor and Client personnel. Supervise the Discipline Acceptance Coordinators and Punch Listing Crews. Ensure all punch list items are recorded, executed, and completed. Ensure handover of facilities to the Client is performed in a systematic and timely manner.Maintain close coordination with the Client’s Facilities Acceptance Coordinator, such that a high level of confidence and understanding can be achieved between all concerned parties.Supervise and coordinate the handover of all commissioning and two year spare parts to the Client.Represent the EPC contractor in all communications with the Client in regard to warranty issues and post completion issues. Show less

      • Sr. Pre-commissioning Engineer/Operations Superintendent

        May 2008 - Dec 2010
      • Facilities Acceptance Superintendent

        Oct 2005 - Apr 2008
    • Kaltim Supacoal, PT - a subsidiary of White Energy Co. Ltd.

      Dec 2010 - Apr 2012
      Operations Manager (latest position)

      The plant is to upgrade the raw coal with low rank calorie (4,472 kcal/kg) to be higher caloric value (6,122 kcal/kg) by using the Binderless Coal Briquette (BCB) technology to reduce moisture contents from ±35% to be ±8%. The plant is designed to produce the BCB up to one million tons per year.My primary responsibility is to manage day to day operations of the plant and ROM coal receiving, lead, organize, and provide direction for employees to ensure outstanding performance is achieved in production, people performance, HSE & Q outcomes, and the business results. The role includes overseeing the stockpiles management.Another role is to campaign and promote the BCB as a cleaner and more efficient fuel coal to the government and users.In charge as Operations Manager commenced in January 2012 instead of Operations Superintendent. Show less

    • ConocoPhillips Indonesia

      May 2012 - Jan 2014
      Facilities Acceptance Coordinator

      Develop, review, supervise on implementation, and monitor all Mechanical Completion Procedures and Commissioning Management System which have to be done by the Contractors in order the construction schedules are consistent with pre-commissioning, commissioning, and start up schedule. These tasks cover the handover of facilities and spare parts as well.

    • JOB Pertamina Talisman Jambi Merang

      Feb 2014 - Dec 2015
      Mechanical Completion Engineer

      Develop, review, supervise on implementation, and monitor all Mechanical Completion Procedures and Commissioning Management System which have to be done by the Contractors in order the construction schedules are consistent with pre-commissioning, commissioning, and start up schedule.

  • Licenses & Certifications

    • Path Maker - Commissioning Management System