Ayan Mukherjee

Ayan Mukherjee

GET, Electrical

Followers of Ayan Mukherjee229 followers
location of Ayan MukherjeeSiliguri, West Bengal, India

Connect with Ayan Mukherjee to Send Message

Connect

Connect with Ayan Mukherjee to Send Message

Connect
  • Timeline

  • About me

    Executive Engineer Electrical at Engineers India Limited, B-Tech (EE), M.I.E (IEI). C.Eng ; P.Eng

  • Education

    • Baluhati

      -
    • Indian Institute of Technology Delhi

      2024 - 2025
      Certificate Programme in Project Management Project Management

      CEP - Project Management. Expertise in Cost management, Risk Management, Project Planning, Project Scheduling using MS Project, SCM etc.

    • West Bengal University of Technology, Kolkata

      2003 - 2007
      B-Tech Electrical Electrical engineering 7.05
  • Experience

    • Schwing Stetter India

      Jul 2007 - Jan 2008
      GET, Electrical

      Project: 2000MW Hydro Project, NHPC, Arunachal Pradesh Pivotal role in Erection, Testing, Commissioning of Batching Plants as well as maintenance

    • Paharpur Cooling Towers

      Feb 2008 - Jun 2009
      Engineer Electrical

      Project: Naptha Cracker Project (IOCL), Panipat, Haryana Involved in supervision of Erection, testing and commissioning of Electrical Systems like MCC, MLDB, HT< Motor (CGL), Transformer, HT Switchgear (Siemens) etc. Erection of Cable Tray, Design of telephone , Lan, PA, Inspection of Electrical material like – H.T. & L.T. Motor, earthing strip, Trafo-H.T., Panels with EIL and IOCL and Clearing IMIR(Inward Material Inspection Report) Preparation of cable schedule & conceptual cable routing diagram of Electrical Systems like MCC, MLDB, HT< Motor, Transformer etc. in Substation and LCR Preparation of QAP, ITP, Format of all electrical work and instrumentation work and getting approval from EIL, Inspection of Electrical Item and getting IMIR Clear from EIL Show less

    • ENGINEERING PROJECTS (INDIA) LIMITED ( A Govt. of India Enterprise )

      Dec 2009 - Dec 2014
      Manager Gred. I I

      IOCL, Paradeep Terminal Project. Paradeep, Odisha (Updating of old Sub-Station to New 6MVA 33/11KV & Allied Instrument work) : BCPL (JV of GAIL & IOCL), Dibrugarh, Construction of 3 Nos. 33/6.6 /.433 KV Sub-station, Client : EIL. Preparation of Tendering documents, NIT, bidding, rate submission, preaparation of Technical specification and material requisition. Preparation of QAP, ITP, Format of all electrical work and instrumentation work and getting approval from EIL, Inspection of Electrical Material & Installation work and getting IMIR Clear from EIL.Supervision Team of 40 Manpower including 2 Contractor Engineer, erection, testing, commissioning of 33KV as well as 11KV panels VCB, Capacitor Bank 11KV, 7 km cable laying 11kv as well as 33kv with HV test, Control Cable laying & Testing, Erection & Testing of LT Motor, 6 MVA transformer 33/11KV , 1.6 MVA 33/.415KV transformer etc, 600KVA DG Set with AMF Panel. Erection of Cable Tray, Design of route & laying of telephone , Lan, PA Cable, Inspection of Electrical material like – H.T. & L.T. Motor, Earthing strip, Trafo-H.T., Preparation of cable schedule & conceptual cable routing diagram of Electrical Systems like MCC, MLDB, HT< Motor, Transformer etc. in Substation and LCR. Interconnection schedule, Cathodic Protection as per EIL Standerds. Also Retrofication of existing 3.1 MVA Transformer, VFD, PMCC, Control and metering panel. Experience in P&IDs, Risk Analysis, and Hazardous area Classification, as well as conversied with Codes & Standards. IS Code and IEC. Inspection of Material as well as Installation work. Getting IMIR clear. Coordinating with Consultants regarding B.O.Q& Licensing Board, CEA. Show less

    • Al Gihaz Holding

      Jan 2015 - Jun 2017
      Project Electrical Engineer

      Worked on 110/13.8 KV Grid Sub-station, National Grid, Saudi Electricity Company Jeddah & Port & Oil terminal, SAUDI ARAMCO – Project Project Management Activities : Preparing vendor document, RFQ, Follow up with Procurement Department for PO & other matters,, uploading enquiry about all electrical item and maintaining Project Document (DTS) regarding design as well as Procurement. Worked on a Team of 15 Engineers. Reviewing and recommending improvements to system designs to improve performance and reliabilitySite Execution work progress including monitoring & preparation of site progress report to submit customer to meet customer satisfaction with proper safety at site. Assist lead project planners also updating on schedules under lead project planners guidance Follow up with vendors and consultants regarding Engineering activities and coordination with the vendors for Detail Design and Base Design and Co-ordination of Approval from Mott McDonald (Consultant) timely manufacturing and the delivery of equipment to the site. Inspection of Invoices after delivery of material to site Responsible for site inspection and preparing reports and documentation of site inspection. RFI (Request for Inspection) and RMI (request for Material Inspection). Preparing Budget Follow-Up for drawing and design approval from Mott.Mcdonald with our Design Department conducting meeting Including handing taking over process for each item, spare parts EMS approval and handing over the material as per process of with creating MRR. Till completion of whole process. Co-Ordination wih Mott-Mcdonald for Design related query Preparing Client Invoice and checking Contractor and Supplier/vendor’s Invoice and MeasurementPermit Holder of Saudi Electricity for Shutdown Maintenance. Show less

    • Engineers India Limited

      Jul 2018 - Dec 2019
      Deputy Manager Electrical

      Project : MDPL Pipeline Project, IPS Pindwara, Rajasthan. From : 25th July2018 to 30th November’2019.Drawing Design follow up from engineering department. Supervise team of 4 Engineers and 20 technician.Site Inspection of Installation, Testing & Commissioning of Electrical & Instrumentation activity including 33KV 6.3 MVA Sub-Station, Installation of VFD, HT Panel (33 & 6.6KV – Bus Bar CRM Testing, IR Value, Contact Resistance, Timing Test, Scheme check, Auto change over Commissioning), PMCC Panel,HT Motor,Transformer 33/6.6 KV 6.3 MVA, Cable Tray, 33KV Transmission line, Control room (PLC, SCADA, SDH, EPABX,UCP), Bus-duct, LT Panels (LDB), Emergency DG Set with AMF Panel and UPS Schemes, I/O interface, Safety interlocks, MOV loop checking. Making Interconnection scheme. Process Area instruments like PT, DPT, PG, FT, HC Detector, UV Detector etc. Field instruments like level switches, flow meters, , Inst. Tubing & calibration, cold & hot loop checks, Stroke checking and function of control/on off valves and actuators, 2 MW HT Motor with Pump (Crude oil pump), JBs, Impulse piping, cathodic Protection as Specification of EIL & Is standerds, including invoice checking of Contractor. Of IPS Station. Show less

    • Engineers India Limited

      Dec 2020 - Mar 2023
      Executive Engineer Electrical

      Deputed in Dangote oil refinery project. Dangote Refinery Project, Lekki, Lagos, Nigeria.Site Inspection of Installation Testing Commissioning of 66/11 KV 40 MVA Substaion, 11KV, 14MW Motor, Compressor, reactor, 415 volt Motor, lighting, cable laying, cable tray, Control Room and allied Instrumentation, F&G, Telecom Activities of Mild Hydrocracker Unit.

    • Engineers India Limited

      Dec 2023 - now
      Engineer Grade 2
  • Licenses & Certifications

    • Quality Management System Auditor (QMSA)

      TUV Nord
      Jul 2020
    • Associate Engineer Electrical

      Saudi Council of Engineers
      Jun 2015
    • Chartered Engineer

      Institution of Engineers of India (IEI), Kolkata
      Oct 2021
      View certificate certificate