Marc Caldwell

Marc Caldwell

Followers of Marc Caldwell281 followers
location of Marc CaldwellSomerset County, Maine, United States

Connect with Marc Caldwell to Send Message

Connect

Connect with Marc Caldwell to Send Message

Connect
  • Timeline

  • About me

    Estimating Manager at CIANBRO

  • Education

    • Nokomis Regional High School

      1998 - 2002
      High School
    • University of Maine

      2002 - 2006
      Bachelor's Degree Mechanical Engineering Technology 3.45

      Activities and Societies: Pi Kappa Alpha Fraternity

  • Experience

    • CIANBRO

      May 2003 - now

      Project Manager for the Vermont Transportation replacement of Bridge 8, a historic double leaf bascule bridge, that carries U.S. Route 2 over Lake Champlain between the towns of North Hero and Grand Isle. The bridge is the only vehicular movable bridge in the state of Vermont. The bridge will be replaced with a double leaf bascule bridge on a new foundation, with similar aesthetic and same draw width as the 1953 bridge it’s replacing. The project’s purpose is to ensure safe passage by providing a structurally stable roadway for the traveling public. Specifically,the project involves the replacement of the existing bridge along with associated roadway improvements and incidental items. The existing twin leaf bascule bridge provides an 80+ feet navigation channel. Consistent with the existing bridge structure, the new bridge will provide an 80+ foot wide navigation channel with 10 feet of clearance in the closed position (ordinary high water) and unlimited vertical clearance when open. Show less Heavy Civil Marine Estimator in the Transportation and Infrastructure market primarily working on movable bridge projects, focusing on bridge lift machinery and structural steel components.Past and present experience on Alternative Delivery Construction Manager/General Contractor (CMGC) projects for movable bridges. These projects are: • Sarah Mildred Long Bridge Replacement – Maine Department of Transportation• Replacement of Walk Bridge – Connecticut Department of Transportation• US Route 2 Bridge Replacement – Vermont Agency of Transportation• I-695 over Curtis Creek – Maryland Transportation Authority Show less Bates Bridge, Single Leaf Bascule Replacement ProjectNegotiated contracts with major vendors and subcontractors; coordinated all aspects of thebridge project with special attention to balancing, structural, mechanical, and electrical work toensure all fit together and were fabricated to meet specifications and schedule; reviewed shopdrawings and submittals for compliance with the contract drawings and specifications;managed drawing log and distribution of drawings to subcontractors/vendors and field;managed monthly estimate payments with MassDOT and change tracking; providedsubcontractor field coordination; and maintained the project schedule. Show less - Prepared estimate, managed material vendors and sub contractor quotes for mechanical and steel work on numerous bascule and lift bridges.- Able to take concepts from drawings, break it down to activities required and translate how that will work in reality to then scope out the quantity of work involved.- Calculate discipline estimates with material quantity requirements (take-offs), material pricing, labor costs per workhour, equipment, etc. from bid package information.- Ensure any critical materials, labor or equipment are secured through reputable Vendors and Subcontractors to ensure timely delivery to support project schedule.- Establish project schedules with direction and input from others.- Maintain documentation regarding Basis of Bid, as well as all estimating information for future use.- Developed site layout drawings work staging drawing to be incorporated into technical proposals for the owner.- Review proposal specifications and drawings to determine scope of work and required contents of estimate. - Participation in the estimate review process alongside the Senior Management Team. Show less Hornbeck MPSV Conversion Project- Interpreted design/drawings to create structural mid ship work packages and details for the conversion of two sulfur tankers to the world’s largest multi purpose supply vessels to support offshore drilling operations; This required working through consistent engineering challenges.- Resolved many structural issues on this project; including problem identification, resolution, and follow-up on execution.- Created as-built drawings in AutoCADD.- Maintained % completes on all midship, bow and other misc activities.- Direct contact for structural field issues and assisted other disciplines as well on structural interferences.- Assisted with drawing packages to be submitted for RFI’s.- Responsible for ensuring material and technical information was complete for construction activities and material fabrication.- Estimated change order work. Show less -Summer 2005, Sappi Paper Mill Maintenance Account - Worked as a millwright helper performing coupling and shaft alignments on various motors and pumps, completed boiler inspections checking clearances and alignments during shutdowns, and worked with prints to layout piping systems and layout of pumps. -Summer 2004, Penobscot Energy Recovery Corporation Maintenance Account– Primarily worked as a fitter assisting in welding preparation during the construction of cat walks, numerous conveyor systems, and the replacement of boiler grates.-Summer 2003, Amethyst Oil Rig Project - Assigned to a flush and testing crew hydro testing vent lines, oil tanks and voids on both oil rigs. Show less

      • Estimating Manager

        Dec 2024 - now
      • Chief Estimator

        Jan 2024 - Nov 2024
      • Estimating Manager

        Aug 2020 - Dec 2023
      • Project Manager

        Apr 2018 - Aug 2020
      • Estimating Manager

        Jun 2017 - Mar 2018
      • Senior Project Estimator

        Sept 2015 - May 2017
      • Project Estimator

        Aug 2013 - Sept 2015
      • Project Engineer/Movable Bridge Coordinator

        Feb 2010 - Jul 2013
      • Project Estimator

        May 2008 - Feb 2010
      • Field Engineer

        Dec 2006 - May 2008
      • Estimating Engineer

        Oct 2006 - Dec 2006
      • Field Engineer

        Jun 2006 - Oct 2006
      • Summer Intern

        May 2003 - Jun 2006
  • Licenses & Certifications

    • General Contractor Qualifying Agent

      Georgia Secretary of State
      Mar 2017