Mohamed Anass

Mohamed Anass

Teaching Assistant

Followers of Mohamed Anass1000 followers
location of Mohamed AnassAbu Dhabi Emirate, United Arab Emirates

Connect with Mohamed Anass to Send Message

Connect

Connect with Mohamed Anass to Send Message

Connect
  • Timeline

  • About me

    Offshore Methods Lead

  • Education

    • American University of Sharjah

      2015 - 2017
      Master’s Degree Mechanical Engineering 3.57 CGPA

      Activities and Societies: President Graduate Students Association Granted Full Graduate Teaching Assistantship

    • University of Khartoum

      2008 - 2013
      First Class Mechanical Engineering
  • Experience

    • University of Khartoum

      Sept 2013 - Aug 2014
      Teaching Assistant

      Achievements:• Prepared tutorials to third and fourth year students in both (Engineering Economy & Thermodynamics).• Prepared tests for students.• Checked tutorials and tests.

    • Ministry of Petroleum, Sudan

      Dec 2013 - Jul 2014
      Trainee

      Project:• Ministry of Petroleum Tower.Achievements:• Supervised and followed the works progress for the mounting of the VRV system in the project.

    • Kenana Engineering and Technical Services ltd.

      Sept 2014 - Aug 2015
      Mechanical Design Engineer

      Project:• Dangote Sugar Refineries (DSR): is a feasibility study and basic design of five large-scale (12000 TCD and 24000 TCD) sugar factories in Nigeria. • Dangote Sugar Refineries- Integration: is a sub-project of the DSR, concerned with the integration of all systems together in the plant and a total energy and mass balance for the plant. Achievements:• Developed new calculation sheets for equipment sizing and selection of mechanical equipment in the Sugar Factory. • Prepared and modified all conceptual and basic engineering documents (such as calculation sheets, equipment lists, operation philosophies). • Prepared specifications and datasheets for some of the mechanical equipment and components.• Developed and modified all technical drawings (including PFDs, P&IDs). Show less

    • American University of Sharjah

      Aug 2015 - Apr 2017
      Graduate Research and Teaching Assistant
    • Saipem

      Apr 2017 - Nov 2019

      NFPS iFEED - North Field Production Sustainability project aims to maintain existing offshore gas production by constructing additional production platforms, riser platforms with associated bridges, and inter-connected with intra-field CRA pipelines network, and connected to shore through five carbon steel trunklines. The project also includes brownfield modifications in both offshore and onshore, plus onshore pipelines.Client (QatarGas)Responsible for preparing offshore installation specifications, offshore installation SOW, interfacing with subsea and structural engineering in pipelines and platform design, as well as conducting Constructability workshop with the client. Show less Bid LTA 48 - Engineering, Fabrication, and Installation of 10 SSS-type oil production Jackets Client (ARAMCO)Bid LTA 53 - Installation of 11 km offshore LPG pipeline on an existing Trestle next to live LPG pipelinesClient (ARAMCO)Responsible for preparation of technical deliverables (rigging list, equipment list, installation aids list,...etc), vessels utilization plan, installation execution plan, and installation schedule to assist the Proposal team in the commercial evaluation of the bid. Also, responsible for evaluating the risks and opportunities within the bid, and providing continuous support and offshore installation advise to the Proposal team. Show less 19 SSS Jackets Project - Client (ARAMCO)The EPC project involves engineering, fabrication, and installation of 19 SSS-type offshore jackets in the fields of Marjan, Zuluf, Safaniyah, Berri, and Hasbah of the Arabian Gulf. The most challenging aspect of the project is the tight schedule to have all jackets installed in a project life of only 1 year, which required having two fabrication yards, and three installation vessels working simultaneously.I was part of a team responsible for installation methods and procedures, operation readiness, interface with Fabrication and Engineering, material readiness, and offshore support for the installation of 7 jackets in Marjan field under this project scope of work. I was also responsible for all project rigging supply, design follow up, and readiness as per schedule at the fabrication yards. Show less Karan 52/60 and Arabiyah 20/23 Projects - Client (ARAMCO): The EPC project involves 4 Jackets, 6 Topsides, 3 bridges and flare, as well as 2 pipelines, 1 cable and 1 umbilical in Karan and Arabiyah fields. Responsible for installation methods, interface with Fabrication, Engineering, Construction support (naval and structural engineering) departments, as well as the fabrication yard for the transportation and installation of topsides under the project scope. Also responsible for following up operational readiness in terms of installation aids fabrication, rigging design and procurement, and miscellaneous material required for transportation and installation of structure. Furthermore, I was providing offshore support during the installation campaign. Show less

      • Offshore Methods Engineer - FEED

        Apr 2019 - Nov 2019
      • Offshore Methods Engineer - Bidding

        Jan 2019 - Apr 2019
      • Offshore Methods Engineer

        Jan 2018 - Jan 2019
      • Offshore Methods Engineer

        Apr 2017 - Jan 2018
    • McDermott International, Ltd

      Nov 2019 - Nov 2021
      Field Engineer

      SAF8 Project - Offshore installation of six Slip-over well-head platforms, 6 subsea pipelines, 5 umbilicals and 6 cables in Safaniyah field, plus two SWOPs in Manifa field.Client (ARAMCO)Responsible for development of installation procedures, drawings, reports and analysis for the installation of all subsea scope of work under the project scope. As well as following up operation & material readiness, subcontractors, fabrication activities, and vessels mobilization.

    • Saipem

      Nov 2021 - now

      project: LTA 85, 91, 92, 93, 96 Fixed FacilitiesClient: ARAMCOResponsible as a T&I Lead Engineer for the installation engineering and support of construction vessels preparation and operation for the installation of five 4-legged jackets and six PDM/WI topsides in the offshore fields of ARAMCO in the Arabian gulf.Project LTA 124 for ARAMCO Acting as Methods Lead responsible for the engineering for the demolition of existing platforms in Marjan field and installation of five new platforms (jackets and decks) and one TP platform in Marjan. Show less

      • Offshore Methods Lead

        Jul 2024 - now
      • Sr. Principal Offshore Methods Engineer

        Aug 2023 - Jul 2024
      • Sr. Principal Offshore Methods Engineer

        Jul 2022 - Aug 2023
      • Sr. Offshore Methods Engineer

        Nov 2021 - Jul 2022
  • Licenses & Certifications

    • Verified International Academic Qualifications - Master of Science Degree in Mechanical Engineering

      World Education Services
      Sept 2020
      View certificate certificate
  • Volunteer Experience

    • President

      Issued by Graduate Student Association-American University of Sharjah on Jun 2016
      Graduate Student Association-American University of SharjahAssociated with Mohamed Anass