Deng Gong

Deng Gong

Instrument Engineer

Followers of Deng Gong572 followers
location of Deng GongChengdu, Sichuan, China

Connect with Deng Gong to Send Message

Connect

Connect with Deng Gong to Send Message

Connect
  • Timeline

  • About me

    Senior Facilities Engineer at Intel Chengdu

  • Education

    • Shenyang Ligong University

      1999 - 2003
      Bachelor's degree Automation
    • Shenyang Ligong University

      1999 - 2003
      Bachelor's degree Industry Automation
  • Experience

    • Hubei Dongfang Chemical Industry Company

      Jul 2003 - Oct 2005
      Instrument Engineer

      I was responsible for field instruments and DCS (Emerson DeltaV 6.3) system installation and maintenance. The scope of work includes: TNT production line original pneumatic instruments demolishing. New intelligent instruments and DCS system installation. Cable pulling and wiring, cold loop check. DCS system SAT, hot loop test, function test, commissioning and start-up. Instruments and DCS maintenance.

    • Chengdu Wandong Instrument Corporation

      Nov 2005 - Aug 2013
      Manager

      I was responsible for control system (DCS/SIS/F&GS/PLC/SCADA) integration management. The scope of work includes: Develop technical proposal, participate in bidding. Project and resource arrangement. Manage schedule and budget per contract. Organize kick-off meeting, manage control system supplier per contract, project design, control system integration, configuration, programming, FAT, function test, SAT, commissioning, start-up, hand over etc.

    • INTECH Process Automation

      Sept 2013 - Sept 2016
      ICPS Lead

      I was responsible for ICPS/ DCS/ SCADA system of CDB natural gas purification project which developed by Chevron and CNPC. The scope of work includes: Take system ownership from construction team. Develop construction punch list. Develop function test procedures. Conduct system SAT. Support loop test team and operation team for hot loop test. Lead function test per approved test procedures. Conduct PSSR (Pre-Start-up Safety Review). System start-up. Close punch list. Show less

    • Sichuan Daowei Petroleum Technology Co., Ltd.

      Sept 2016 - Nov 2017
      Manager

      I was responsible for overall engineering department work management. The scope of work includes: Project and resource arrangement. Provide technical support for marketing team on new client develop. Technical exchange with owner and designer. Develop technical proposal, participate in bidding. Manage schedule and budget per contract. Organize kick-off meeting, manage control system supplier per contract, review project design, control system integration, configuration, programming, FAT, function test, SAT, commissioning, start-up, hand over etc. Show less

    • Bureau Veritas Group

      Oct 2018 - May 2021
      Control discipline QAQC Engineer at Texas Instrument Chengdu

      I was responsible for Texas Instrument Semiconductor Manufacturing (Chengdu) CDAT2 Project control discipline QA/QC. Inspect and accept quality of GC construction work. Control discipline covers instrument /PLC /SCADA /Fire Alarm system. The scope of work includes: Review and approve GC submitted documents like project material submittals, shop drawings, mock-ups, construction method statement, ITP (inspection test plan), check list, commissioning procedures. Inspect and accept material per approved submittal. Inspect and accept concealed work per approved shop drawings/ mock-ups. Inspect and accept installation of instrument/PLC cabinet/Fire alarm system per shop drawings/ mock-ups/ construction method statement. Verify PLC code/ SCADA HMI per P&ID drawing/ instrumentation list/ sequency of operation. Verify fire alarm system linkage per Cause-and-Effect drawings. Issue SORs. Inspect and accept GC rectification of SORs. Input punches to punch list. Inspect and accept punches. Show less

    • Intel Corporation

      May 2021 - now
      Senior Facilities Engineer

      I’m responsible for FMS (Facilities Monitoring System)/FLSS (Fire Life Safety System) system. The scope of work includes: Develop FMS/FLSS system optimization plan and budget. Maintain critical spare parts to support system operation. Supervise and audit contractor’s daily PM/CM. Train contractor technicians, provide technical support when needed. Regular review and optimize PM procedures. Analyze system incident root cause, fix system deficiencies to improve system reliability. Support mechanical/chemical system owner on troubleshooting. Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Mar 2018
      View certificate certificate