Panagiotis Asproulias

Panagiotis Asproulias

Quality Control Engineer

Followers of Panagiotis Asproulias504 followers
location of Panagiotis AsprouliasGreece

Connect with Panagiotis Asproulias to Send Message

Connect

Connect with Panagiotis Asproulias to Send Message

Connect
  • Timeline

  • About me

    Senior Technical Advisor at LAMDA Development S.A.

  • Education

    • King's College London, U. of London

      2011 - 2013
      MSc Construction Law & Dispute Resolution Pass with Merit

      This was a two-year full-time MSc course. Modules:Introduction to the English Law;Construction Law I;Construction Law II;Arbitration and Alternative Dispute Resolution;DissertationDissertation subject: "To what extent can a designer or a contractor rely on information provided by the employer?"Award: Commendation

    • The University of Law (Moorgate Centre, London)

      2012 - 2014
      Bachelor of Laws (LLB) Law

      A Bachelor of Laws degree comprising of a Graduate Diploma in Law (GDL) and a PgDip in International Legal Practice (LPC). Graduate Diploma in Law (GDL) Modules:Legal Method;Contract Law;Tort Law;Land Law;Equity & Trusts;Public Law;EU Law;Criminal Law;Written Assessments.Postgraduate Diploma (PgDip) in International Legal Practice (LPC) Modules:Company & Partnership Law & Practice;Property Law & Practice;Civil… Show more A Bachelor of Laws degree comprising of a Graduate Diploma in Law (GDL) and a PgDip in International Legal Practice (LPC). Graduate Diploma in Law (GDL) Modules:Legal Method;Contract Law;Tort Law;Land Law;Equity & Trusts;Public Law;EU Law;Criminal Law;Written Assessments.Postgraduate Diploma (PgDip) in International Legal Practice (LPC) Modules:Company & Partnership Law & Practice;Property Law & Practice;Civil Litigation;Criminal Litigation;Solicitors' Accounts;Wills;Advocacy & Interviewing;Code of Ethical Conduct.Electives:International Joint Ventures;International Mergers and Acquisitions;International Arbitration.Award: Commendation Show less

    • Technological Educational Institute of Athens

      1999 - 2003
      Bachelor of Engineering (BEng) Honours Civil & Infrastructure Engineering

      I completed my thesis on the design of a retaining wall made of reinforced concrete with flexible foundation, based on ground susceptible to differential settlements due to the presence of underground water – Structural & Seismic analysis. I was awarded a Distinction for my thesis.

  • Experience

    • VINCI

      Jan 2002 - Jan 2004
      Quality Control Engineer

      Vinci Construction Grands Projets was the leader in a Joint Venture for the construction of Rion - Antirion Bridge Project, a unique 2.252km multi-span cable-stay bridge, which was delivered 5 months ahead of schedule.This Bridge is one of the longer multi-span cable stayed bridges on the world with its 2,252 meters continuous and fully suspended deck and has been awarded 9 International Awards by the scientific community.Project Value: € 800 Million Worked as a QC engineer, responsible for the quality control on:- Piers construction 'In-Situ' concrete works (reinforcement, slump, flow & temp. tests, repairs, injections, covermeter / crackmeter surveying, prestressing)- Main bridge deck concrete works, steel deck bolting and painting- Waterproofing, Asphalt Works and New Jersey barriers Preparation of quality record packages following the company’s QA systemIn this project, I was fortunate to work alongside reputable engineers and experts and experience their skills in construction management and problem solving, in a unique but also challenging project.I learnt how to be a good team player and developed appropriate communication skills, dealing with staff of all levels of seniority and multi-national backgrounds.I developed ‘an eye for the detail’ and learnt to be responsible and accountable for my work at an early stage of my career. Show less

    • KEA Constructions Ltd

      Dec 2005 - Aug 2007
      Project Manager

      The company was active in the design and construction of luxurious residential villas.Responsibilities included:- Project management of 12 different projects located all around the island, owned either by individual employers or by developers. Managed the whole life-cycle of the projects, from excavations and concrete works to the formation of the exterior surrounding spaces. I was also responsible for the payments, certification and had the authorisation to order variations.

    • VINCI Construction Grands Projets

      Jan 2007 - Jan 2010

      A 'design and build' (PPP) concession project for the construction of a Motorway linking Athens to Thessaloniki. VINCI was responsible for 13% of the entire project and its scope of works included the construction and rehabilitation of a part of motorway (30km) as well as the construction of a traditionally bored bi-tubed Tunnel of 2 lanes plus emergency lane (2,4km long).Project Value: €120 Million of an €1.2 Billion project.Responsibilities included:- Contract management and cost control for all the open section works, for a part of 30km of Motorway, reporting directly to the Project Director;- Co-ordination with our in-house legal and procurement departments regarding the preparation of Invitations to Tender, Variations, Claims and subcontractual negotiations; - Company representation in dispute resolution procedures (mainly DAB’s and Arbitrations);- Company representation/communication with the other JV Partners, designers, subcontractors and public authorities;- All matters of Quality (QA/QC) regarding the open section areas; and- Management of staff comprising of more than 100 individuals from all levels of seniority and background. Main achievements in this job included:Management of staff and subcontractors for an effective and timely project execution, without compromising in quality, cost and deadlines;Achieved as an office income a very large percentage of the total budget for this part of the project due to the timely work completion, as was required by the 3rd contractual milestone of the concession agreement.In addition to the above, through this position, I developed innovative approaches to problem solving, learnt to grasp quickly a wide range of complex issues, learnt to think critically and to remain focused under pressure. Show less A 'design and build' (PPP) concession project, for the construction of a Motorway linking Athens to Thessaloniki. Project value: In excess of €15 Million.Responsible for:- The demolition and reconstruction of a two-span bridge (70m length) and the river lining works of the stream with reinforced concrete (350m long - 6000m3 concrete)- The total range of rehabilitation works of the entire open section (30km) of Motorway including concrete, asphalt and E/M works- Maintenance works at the existing structures (bridges, culverts and retaining walls).- The construction of anti-flood protection works of the Motorway.Holding this position, I was involved in simple contract management and effective cost control of the construction. I developed strong leadership and planning skills and learnt how to multitask and be resourceful. I developed innovative approaches to problem solving without compromising in quality, cost and deadlines. I was responsible and accountable for my work. Show less

      • Project Manager & Quality Executive (Open Section Area)

        Jan 2009 - Jan 2010
      • Site Manager

        Jan 2007 - Jan 2009
    • SALFO & Associates

      Jan 2010 - Jan 2011
      Technical Consultant

      ESIC Joint Venture was the Technical Consultant for the construction of Ionia Odos Motorway, a 'design and build' (PPP) concession project in Greece. The contractors were two Spanish companies, Dragados and Ferrovial, together with the Greek TERNA.Project Value: €1.4 Billion.Acted as technical consultant for the construction of the Motorway. The area of responsibility extended to an area of 40km of a new (under construction) Motorway, including the construction of two traditionally bored (drill and blast) bi-tubed Tunnels of 2 lanes (with a total length of 3480m) and a 3-span twin cantilever bridge (258m long).Main achievements in this job included the preparation of meticulous technical reports concerning construction quality issues, handling the contractual violations of the constructors, and protecting the assets of the concessionaire. Show less

    • King's College London

      Jan 2011 - Jan 2013
      MSc in Construction Law & Dispute Resolution

      Two-year full-time Masters of Science course in Construction Law and Dispute Resolution. Award: Commendation.

    • The University of Law

      Sept 2012 - Aug 2014
      LLB and PgDip in International Legal Practice (LPC)

      A Bachelor of Laws degree comprising of a Graduate Diploma in Law (GDL) and a PgDip in International Legal Practice (LPC).

    • AKTOR SA

      Jan 2015 - Aug 2019

      Working as Contract & Claims Manager with AKTOR SA for the construction of a new motorway for the section between Demir Kapija and Smokvica as part of the Pan-European Corridor X, in FYROM. The Contract was based on FIDIC Red Book.Project Value: € 210 million.Responsibilities included:- Participating at the monthly Board Meetings regarding the progress of the works, representing the Contractor on the contractual issues;- Involved with the negotiation and drafting of an Addendum to the Contract in the amount of € 7,5 million;- Involved with the issuance/extensions of the Contractor’s Performance Bonds & Guarantees;- Responsible for the drafting, submission and the following up of construction claims and variations to the Contract; - Responsible for the company’s representation in alternative dispute avoidance/resolution procedures (DAB’s and Arbitrations); - Responsible for the negotiation and drafting of large scale commercial and procurement contracts in connection with the Project.Achievements in this job include:The successful negotiation and agreement with the Employer of an Addendum to the Contract providing for an Extension to the Time for Completion for a period of 14 months and an increase to the Contract value by 3,6%, covering also the Contractor’s General expenses for the entire prolongation period, subject to the Engineer’s affirmative evaluation of the Contractor’s Claims. Show less

      • Head of Contracts

        Jul 2018 - Aug 2019
      • Head of Commercial Administration

        May 2017 - Jul 2018
      • Contract & Claims Manager

        Jan 2015 - May 2017
    • GE Renewable Energy

      Oct 2019 - Jul 2020
      Contract Manager

      Advising on construction claims and dispute resolution matters, in connection to the EPC project of the electrical interconnection of the Cyclades islands and the design and build of four gas-insulated substations (GIS) of 170kV each.Project value: €42M

    • NKT

      Aug 2020 - Apr 2021
      Contract Manager

      Managing the Contract for Attica-Crete 500MW HVDC interconnection project.Project value: €113M

    • LAMDA Development S.A.

      Apr 2021 - now
      Senior Technical Advisor

      Advising on issues concerned with Procurement and Contracts for the realisation of the Hellinikon project.The Hellinikon project is the largest urban development project in Europe, designed to create a nation-wide metropolitan multi-purpose pole of international, state-of-the-art, reference.

  • Licenses & Certifications

    • Professional registration as an Incorporated Engineer (IEng)

      Engineering Council (UK)
      Sept 2012
    • Registered as Qualified Constructor with Second (B) Class Degree in Road Works & Hydraulic Works and First (A) Class Degree in Marine Works

      Greek Ministry of Public Works
      Nov 2011
    • Fellow Member of the Chartered Institute of Arbitration

      Chartered Institute of Arbitrators (CIArb) Scottish Branch
    • Member of the Institution of Civil Engineers (ICE)

      Institution of Civil Engineers (ICE)
  • Honors & Awards

    • Awarded to Panagiotis Asproulias
      Arbitral Award Writing Examination King's College London Jun 2013 The Arbitral Award Writing Examination provided by King's College London qualifies for exemption from the CIArb Fellowship examination. The pass mark is 70%.