Théophile Balland

Théophile balland

bookmark on deepenrich
location of Théophile BallandLyon, Auvergne-Rhône-Alpes, France
Phone number of Théophile Balland+91 xxxx xxxxx
Followers of Théophile Balland885 followers
  • Timeline

    Jan 2014 - Jan 2016

    President & Founder

    Junior Conseil utt
    Jan 2015 - Aug 2015

    Junior Industrial Engineer

    Alstom Transport
    48 Rue Albert Dhalenne, 93400 Saint-Ouen
    Sept 2016 - Mar 2017

    Assistant to the Production Manager

    CHANEL
    May 2017 - Nov 2017

    Procurement and Inventory Manager

    Futura Trailers Ltd
    Current Company
    Nov 2018 - now

    Manager

    Wavestone
    Lyon, Auvergne-Rhône-Alpes, France
  • About me

    Manager Performance & Digitalisation chez Wavestone

  • Education

    • Lycée franco-hellénique eugène-delacroix

      2005 - 2011
      Sciences spécialité maths mention "bien"

      Activities and Societies: Théâtre, Foot Lycée d’Athènes

    • Université de technologie de troyes

      2011 - 2016
      Master of engineering (m.eng.) industrial engineering

      Activities and Societies: President & Creator of the Junior Conseil of UTT

    • University at buffalo

      2014 - 2015
      Industrial engineering

      Activities and Societies: Équipe de foot intramuros

    • Universidad tecnológica nacional

      2016 - 2016
      Master's degree industrial engineering

      The OSS specialization aims at the development of valuation models and performance optimization for controlling industrial processes.Regarding the control of industrial processes, we can distinguish the following major issues :- Design, organization and management of production systems combinatorial problems for scheduling and locating, inventory management and workflow),- Logistics ( optimization of transport and distribution , control of the supply chain),- Complex Systems… Show more The OSS specialization aims at the development of valuation models and performance optimization for controlling industrial processes.Regarding the control of industrial processes, we can distinguish the following major issues :- Design, organization and management of production systems combinatorial problems for scheduling and locating, inventory management and workflow),- Logistics ( optimization of transport and distribution , control of the supply chain),- Complex Systems Dependability (evaluation and optimization of system reliability , industrial risks),- Monitoring and diagnostics systems (monitoring the state of a system, locating and diagnosis failures). Show less

  • Experience

    • Junior conseil utt

      Jan 2014 - Jan 2016
      President & founder

      • Creation of a student association to help students find jobs in relation with their studies• Working on inter-school cooperation• Canvassing and first missions from local businesses

    • Alstom transport

      Jan 2015 - Aug 2015

      POC (Proof of concept) of new functionalities on Delmia V6 in collaboration with Dassault Systems:- Plant Layout Design (PLA license)- 3D Simulation of the Manufacturing Process (MAE, EEV)The objective was to determine the effectiveness of these functionalities to identify the potential gains they could have for Alstom Transport. Optimisation of a metro production line :- Reduction of the method times to be able to acheive a take time of 1 day with 2 teams working 8 hours per day,- Continuous improvement of the tooling in collaboration with Altran,- Reduction of the cycle time.We were working in collaboration with the Katowice industrial team.

      • Junior Industrial Engineer

        Jul 2015 - Aug 2015
      • Intern - Optimisation Production Chain - Rolling Stock Dpt

        Jan 2015 - Jun 2015
    • Chanel

      Sept 2016 - Mar 2017
      Assistant to the production manager

      • Production Management of the ready-to-wear products • Management of the VIP special requests • Interface between the manufacturers, the different services and the boutiques

    • Futura trailers ltd

      May 2017 - Nov 2017
      Procurement and inventory manager

      - Delivery◦ Keep track of stock levels, delivery times, and transport costs◦ Ensure inventory under and over stock targets achieved◦ Analyze data to assess performance and implement improvements- Cost ◦ Ensure lowest component price without compromising quality or safety◦ Managing freight to ensure on time delivery at least cost- Weekly Reporting ◦ Stock level to target – Quantity and Value◦ Cost savings to plan- General◦ Escalating issues and challenges in a timely manner ◦ Kaisen - Continuous improvement of inventory and procurement management systems◦ Any other tasks as required Show less

    • Wavestone

      Nov 2018 - now

      Consultant de la practice manufacturing.

      • Manager

        Apr 2023 - now
      • Senior Manufacturing Consultant

        Nov 2020 - May 2023
      • Manufacturing Consultant

        Nov 2018 - Nov 2020
  • Licenses & Certifications

    • Delmia training pilot

      Alstom transport
      Jan 2015
    • Certifications lean six sigma

      Asq - world headquarters
    • Certified safe® 5 agilist

      Scaled agile, inc.
      Mar 2022
      View certificate certificate