Raphael Flint

Raphael Flint

Internship.

Followers of Raphael Flint3000 followers
location of Raphael FlintGreater Paris Metropolitan Region

Connect with Raphael Flint to Send Message

Connect

Connect with Raphael Flint to Send Message

Connect
  • Timeline

  • About me

    Offshore Installation Package Manager at Iberdrola for Happo Noshiro Windfarm

  • Education

    • Classe prépa TSI

      2007 - 2009
    • Ecole navale

      2012 - 2013
      Master's degree Naval Architecture and Marine Engineering
    • Ecole nationale supérieure d'Arts et Métiers

      2009 - 2012
      Master of Engineering (M.Eng.) Mécanique des solide et des fluides, Matèriau, Industrialisation, production,

      Activities and Societies: BEST ENSAM (board of europeen students of technoligie) en temps que responsable et coordinateur Informatique et Technologie

  • Experience

    • In.C

      Feb 2010 - Feb 2010
      Internship.

      Manufacture of printed circuit boards, installation of component by numerical control, production control.

    • Univercell

      Oct 2010 - Feb 2011
      Internship – Assistant Engineer and Project Manager

      Internship placement in an SME.

    • Calderys

      Jun 2012 - Sept 2012
      Internship – Assistant Engineer

      Worked in the drawing office on the design of smelters furnaces.

    • Technip

      Jan 2013 - Jan 2014
      Subsea Structural Engineer

      Position as consultant for the leading French oil installations company. Working in the subsea department. Designing of subsea structures and installation aide for flexible line in Angola.

    • DCNS

      Jan 2013 - Jan 2013
      Internship – Submarine Naval Architect

      Final year study for the Frensh Navy shipbuilder. Feasibility design of a submarine capable of conveying passengers and equipment for the maintenance of submarine base.Key responsibilities:• Functional analysis of the ship.• Choosing technological solutions for each function highlighted. (Hull, propulsion, energy storage, stowage system, lock ...)• hydrodynamic studies (impact of the waves on the ship with the low dipping Diodorus software) • Structural Studies (optimization of the pressure hull to minimize this weight) • Layouts • Costing• Iterative method for converging all studies to solution vessel being the best compromise.• Calculating immersed and surfaced stability with different load cases. Show less

    • LOC

      Jun 2014 - Nov 2019

      Currently working within LOC Paris energy team, as Naval Architect and Marine Warranty (MWS) Project Manager, in both Oil & Gas and Renewables Energy projects.Responsibilities include project scheduling and budgeting, supervision of document review and of on-site technical experts, reporting to clients, Tender preparation, and supervision of Invoicing.I conduct document review for marine procedures, naval architecture and structural analyses in support to MWS approvals. I review calculations and operation procedures for lifted and trailed load-out, sea-fastening, towage, sea transportation, heavy lift, jacket, topside integration, mooring, anchoring, subsea installation and vessel survey.I attend as MWS representative for loadouts, sail-away, transportations, offloading of high value items such as foundation piles, wind turbine, jacket, topside and subsea equipment.I performed vessel surveys and attend offshore operations such as float-off, subsea installation, heavy lifts.I acted as a law firm representative to assess the damage on container ship’s, and was also involved on a legal case after the grounding on the seine river. Show less FLOATGEN - IDEOL | Jan 2017 to date - Saint-Nazaire FranceConstruction, transport and installation of a 2MW Floating Wind Turbine (FWT) demonstrator> Attended the critical construction phases, the caisson’s float-off in drydock, in harbor and sea towage, the mooring hook-up, transport and installation of the transition piece and the turbine tower. Has reviewed mooring calculation, offloading, transport and mooring procedures. Has also performed on and off-hire survey of the marine spread, including the mooring line installation vessel “FAR SAFFIRE”, the hook up vessel “JIF CHALLENGER”, harbor tugs and other crew boats. Show less

      • Independent Lifting Expert for AQUARIUS Project

        Nov 2018 - Nov 2019
      • MWS Project Manager for IFA 2 INTERCONNECTOR Project

        Jun 2018 - Nov 2019
      • Marrine Warranty Surveyor for FUTURE GROWTH Project

        Nov 2017 - Nov 2019
      • Naval Architect

        Aug 2015 - Nov 2019
      • Marine Warranty Surveyor for FLOATGEN Project

        Jan 2017 - Sept 2018
      • MWS Project Manager for NENE phase 2A Project

        Jun 2016 - May 2018
      • MWS Manager on SPS package for MOHO NORD Project

        Jun 2015 - Jun 2017
      • MWS deputy project manager for TAT cable project

        Jan 2015 - Feb 2016
      • MWS Work Package Manager on FPU ALIMA upgrade

        Oct 2014 - Dec 2015
      • Naval Architect

        Jun 2014 - Jul 2015
    • Iberdrola France

      Mar 2021 - now

      Working on Foundation Installation Package for the Saint-Brieuc Offshore windfarm project for Aile Marine. The foundations consit of drilled pin piles and three leg's jackets.

      • Transport and Installation Package Manager for the Happo Noshiro Offshore Windfarm

        Jun 2024 - now
      • Offshore Installation Engineer

        Nov 2019 - now
      • Deputy Package Manager for the transport and intallation of Foundations

        Mar 2021 - Sept 2024
  • Licenses & Certifications

    • Intrenal Auditor

      Lloyd's Register Quality Assurance
      Apr 2017
    • ISO 9001-2015

      Lloyd's Register Quality Assurance
      May 2016
    • SOMWS membership

      The Society of Offshore Marine Warranty Surveyors (SOMWS)
      Aug 2019
    • BOSIET & EXT

      DELTA Safety Training
      Sept 2018
    • Marine Operation of Jack-Ups in the Marine renewable Industry

      LOC
      Oct 2016
    • GWO training

      FMTC Safety
      Jun 2021