
Jean Tham

Connect with Jean Tham to Send Message
Connect
Connect with Jean Tham to Send Message
ConnectTimeline
About me
Project Fabrication Engineer at Dayang Enterprise Sdn Bhd
Education

Curtin University
2006 - 2011Bachelor of Chemical Engineering Chemical Engineering
Experience

Dayang Enterprise Sdn Bhd
Mar 2012 - nowPETRONAS BARONIA COMPLEX REJUVENATION 2016 VISIT (RM200 Million) Prepare daily fabrication progress report which is inclusive of preparing planning S-curve and tracking actual progress against planned percentage. Prepare weekly progress meeting to update clients on project and material status and resolve on-site issues. Monitor and supervise pre-fabrication progress for structural and piping works. Discuss and coordinate with disciplines engineer in-line based on client request and requirement. Close monitoring of project’s milestone and update client’s representative and ensure planned progress is achieved within the given time frame. To coordinate, follow-up and resolve technical issues with the project team, client and vendor/supplier through issuing Site Technical Query. Collaborate closely with procurement teams and suppliers on purchase and delivery of project materials as of Material Take-off List. To compile and verify all pre-fab materials (piping and structural items) are correctly arranged according the fixed load-out date for offshore installation. Monitor the projects man-hours expenditure. Provide alternatives and justify the man-hours which disturbs the distribution of S-curve to the respective client representative and project team. Review and verify the progress arrival of project materials supplied from the supplier/vendor via material verification report online website. Ensure all the pre-fabricated items are gathered with complete loose spool pieces and flanges before being loaded-out for offshore installation. Certify that the correct colour coding are painted for each pre-fabrication items. Review and compile all fabrication report for final document compilation. Produce Surplus Material Report at end of project. Show less Main job activities include preparation of maintenance Workpack which include: Carry-out kick-off meeting for clarification and establishment of demarcation scope of work. Prepare work-scoping checklist inclusive of deck level, size of working area, types of scaffolding erected or any exceptions/precautions that need to be taken into account. Arrange job-card challenge sessions with client to further optimize the manhours and manpower required for the projects. Tabulate the manpower, nominal schedule equipment specification, consumables and material take-off required for each project execution. Incorporate planning schedule developed by Planning Engineer Verify the project materials such as prefabricated piping and structural items are accurately allocated/labelled with work order, proper consignment note attached to each scope before load-out for offshore installation. Prepare hotwork assessment according to the Hazardous Area Classification (HAC) for scope of work that requires hotwork for each platform. Calculate the paint consumption required each painting scope. Compute the painting system for each piping and structural scope Prepare the sump isolation/positive isolation checklist that is verified by the client on-site for each platform. Prepare the summary of controlled bolt tightening checklist for each piping works for each project. Compute Job Hazard Analysis (JHA) for each scope of work, boat transfer and wash-down station. Prepare markup drawing for piping and structural scope and submit to the Shell drawing office for updating purpose. Pro-active in providing feedback to client’s technical clarifications and attend meetings with clients for verification. Review and verify the fabrication maintenance work sheet design that indicates accurate work order, location of deck level attached with complete P&ID drawing. Understand and implement codes and standards (Shell Design and Engineering Practices (DEPs)Manual) Show less • Segregation Scope of Work (SOW) to be shutdown scope or non-shutdown scope.• Workpack preparation which is inclusive of :o Compute the Material Take-Off list for each project execution.o Review and verify the fabrication maintenance work sheet design. Estimate the manpower, nominal equipment and consumables that is required for the project execution. o Tabulate the manpower and equipment list.o Prepare cost estimation by using the cost estimation package for manpower and nominal equipment. o Prepare manhours summary, jobcard index summary, maintenance jobcards, hand-over certificate and task weight factor. o Produce Hotwork Assessment if sow are involved with hotwork activities.o Prepare Job Hazard Analysis (JHA) for each sow and other general activities.• Produce detailed lifting procedures for the removal and reinstatement of the shutdown valve and actuator. • Tabulate weekly project cost monitoring and reporting. • Always obey the company Safety & Health Policy to certify that the compliance of statutory requirement (OSHA Act 1994).• Monitor the safety performance for the whole on-going project and conduct safety sessions/audits with the client representative on-site. • Implemented of new alternatives/ ideas of the works, supervised and monitored work progress. • Advised the client on the progress of project execution if there is any “hiccups” or disturbance involved while the project is on-going.• Notify the Project Management Team (PMT) regarding any changes to the applied work such as measurement cutting on the pipeworks and obtain approval to proceed forward.• Ensure compliance with the provisions of the contract.• Attended week progress meeting (WPM) with the client to discuss the progress of the on-going project, discuss and resolve area of concern with any issues that required immediate decision from the client in order to minimize the impact on the duration of the project execution. Show less • Preparation and update the Weekly Progress Meeting (WPM) template after received comments/feedback from client. • Develop and submission of reports which is inclusive of Daily Progress Report (DPR), Site Instruction ( documenting additional jobs that were not captured in the workpack), Site Technical Query (STQ) (documenting technical query during project execution). • Coordination of resources such as (materials, manpower, equipment) and logistic arrangement. • Develop Close-Out Report to document the chronology of the project. Report was submitted to client’s review and approval. Show less
Project Fabrication Engineer
Mar 2016 - nowWorkpack Engineer
May 2015 - nowScheduler Cum Workpack Engineer
Mar 2014 - nowGraduate Engineer
Mar 2012 - now
Licenses & Certifications
- View certificate

Graduate Member of Board of Engineers Malaysia
Board of Engineers MalaysiaJan 2013 - View certificate

GradEAust
Engineers AustraliaJan 2013
Honors & Awards
- Awarded to Jean ThamFine Acedemic Achivement Professor Ming Ang Chemical Engineering Department - Head of Department Aug 2010
Recommendations

Thirusha naidu-maharaj
Managing Editor @ AfricanLII | Editorial Standards, Generative AIAfrican Legal Information Institute
Melika ansari
Business analyst | Gamification designer At didimoonTehran, Tehran Province, Iran
Edilberto matallana
Director técnico en SONOX SASColombia
Josie st. peter
School Psychologist at Pankalo Education Center, Founder of TCIT SpedSt Paul, Minnesota, United States
Stanislav smorodskiy
Road engineerUzhhorod, Zakarpattya, Ukraine
Faisal hamdi
Production Engineer at UCICEastern Region
Chandan goyal
Manager - Strategy & SolutionsNoida, Uttar Pradesh, India
Cristina chalacán
Ingeniera en TelecomunicacionesGuayaquil, Guayas, Ecuador
Wes schooley
Command Chief Engineer at United States Transportation CommandIllinois, United States
Yusra khan
Talent Sourcing Specialist at Fisher InvestmentsMcKinney, Texas, United States
Stacey gianas
Gardener Lead at University of WashingtonSeattle, Washington, United States
Rachel ayley
Coach sportifBretagne, France
Shubhangi shetake
Full Stack Web Developer | Angular | ASP.NET | MySQL | Postgresql | Node.jsKolhapur, Maharashtra, India
Waldir bambino de rezende
Commercial Grupo Force - Marketing and Sales SpecialistSão Paulo, São Paulo, Brazil
Miguel angel guevara mayta
INGENIERÍA METALÚRGICAArequipa Metropolitan Area
Kennedy kremer
Founder and CEO of Social Solutions MarketingNashville, Tennessee, United States
María josé maldonado sepúlveda
Diseñadora de interioresCullera, Comunidad Valenciana / Comunitat Valenciana, España
Maëlle trescinski
Marketing & Communication Director at Air MoanaPapeete, Windward Islands, French Polynesia
Aaron rhoades
Software Engineer | Angular, JavaScriptPattersonville, New York, United States
Sajith purushothaman
Engg. | DeveloperBengaluru, Karnataka, India
...