Mir Shayan Rafi

Mir shayan rafi

bookmark on deepenrich
location of Mir Shayan RafiLahore District, Punjab, Pakistan
Phone number of Mir Shayan Rafi+91 xxxx xxxxx
Followers of Mir Shayan Rafi4000 followers
  • Timeline

    Jun 2011 - Jan 2012

    Event Head

    SPADES (Society for Promotion And Development of Engineering and Science)
    Jun 2012 - Jul 2012

    Intern

    Punjab Industrial Estates Development and Management Company
    Jul 2012 - Aug 2012

    Intern

    Descon Integrated Projects Limited (DIPL)
    Jun 2013 - Aug 2013

    Intern

    Ufone
    Dec 2013 - Jan 2014

    Intern

    MAN Diesel & Turbo
    Nov 2014 - Nov 2014

    Intern

    Eastern Testing Services
    Jan 2015 - Jan 2024

    Maintenance Manager | Electrical & Instrumentation Services

    ICI Pakistan Limited
    Shekhūpura, Punjab, Pakistan
    Current Company
    Jan 2024 - now

    Technical Lead - International Executions

    Avanceon Middle East & South Asia
  • About me

    Technical lead | Maintenance Manager | Expert in Electrical & Instrumentation Services | Leading shutdowns & outages | Proven track record at ICI Pakistan Limited

  • Education

    • Crescent model higher secondary school

      2008 - 2010
      Gce a-levels mathematics, physics & chemistry 2a*, 1a

      Activities and Societies: Was head Proctor for the duration of my college education.

    • Crescent model higher secondary school

      2006 - 2008
      Gce o-levels sciences 7a, 1b
    • Lahore university of management sciences

      2010 - 2014
      Bachelor of science (bs) electrical engineering

      Activities and Societies: Rugby team, IEEE, SPADES

  • Experience

    • Spades (society for promotion and development of engineering and science)

      Jun 2011 - Jan 2012
      Event head
    • Punjab industrial estates development and management company

      Jun 2012 - Jul 2012
      Intern

      Operations and Maintenance

    • Descon integrated projects limited (dipl)

      Jul 2012 - Aug 2012
      Intern

      Project Management

    • Ufone

      Jun 2013 - Aug 2013
      Intern

      Worked on a project on purpose and working of Power Control, OVSF and Scrambling Codes in 3G

    • Man diesel & turbo

      Dec 2013 - Jan 2014
      Intern
    • Eastern testing services

      Nov 2014 - Nov 2014
      Intern

      Surface Well Testing, Drill Stem Testing

    • Ici pakistan limited

      Jan 2015 - Jan 2024

      Key accomplishments include:* Spearheaded the execution of SHE actions across multiple teams, ensuring all Section targets were met while enhancing workplace safety standards by 30% within one year through rigorous training programs.* Reviewed and controlled revenue expenditure effectively, achieving a cost reduction of 15% in operational expenses by identifying inefficiencies in resource allocation and implementing targeted strategies.* Supervised E&I maintenance activities for Utilities and PowerGen plants which maximized equipment availability to 95%, significantly reducing downtime through improved scheduling of preventive maintenance tasks.* Led comprehensive investigations into critical equipment failures that resulted in a 40% decrease in repetitive breakdown incidents by addressing root causes with actionable insights and solutions.* Maintained an updated list of plant shutdown jobs that resulted in a 100% implementation rate during scheduled outages, optimizing operational efficiency during critical maintenance periods.* Monitored spares consumption meticulously to prevent equipment outages due to non-availability of parts; achieved a 20% reduction in inventory holding costs while ensuring all necessary components were always on hand.Skills: Electrical Engineering, Maintenance Management, Safety Health Environment (SHE), Cost Control, Project Management. Show less ACHIEVEMENTS: • Currently looking after the maintenance of 2x45 tph and 2x80 tph Coal Fired Boilers with 3MW and 18MW Extraction Steam turbines including their plant auxiliaries. • Successfully Managing CAPEX/OPEX of $700,000.• Successful maintenance and troubleshooting of plant DCS based on Siemens S7-400 redundant architecture and ABB Winmation. • Prepared a thorough plan for capital, revenue and inventory budget management regarding maintenance of the plant.• Looking after the maintenance of 18MW Turbo generator/Steam turbine with WOODWARD Micronet Plus governor and Bentley Nevada 3500M protection system.• First-hand knowledge of working with Siemens and ABB VFD/Soft starters with a maximum power rating of 400KW.• Currently leading Safety Improvement Team (SIT) representing E&I at the Soda Ash works site.PROJECTS• Successfully involved in commissioning of 75 KTPA light ash production plant expansion project. Led commissioning of plant DCS based on Siemens S7-400 redundant hardware and PCS 7 & all 11kV plant HT switch gear. • Erection and commissioning of 1.5 MW, 11kV Diesel generator for plant Black start-up and synchronized running. • Design, erection and commissioning of HP steam (32Bar) Vent valve with silencer for steam header pressure control duty. • Design and installation of a CCTV system for surveillance and monitoring of plant equipment at the CFB Power plant.• Installation of load-shed control system for CFB Power plant.• Area, MCC and HT room lighting automation using Photo/motion switches at CFB Power plantFATs:• Carried out FAT of 7 11kV HT switchgear panels (5 Incomers and 2 feeders) at Schneider Electric Factory in SITE area, Karachi. Show less • Independently looking after the maintenance of Services & Utilities area.• Directing and controlling the daily planning and execution of all maintenance-related activities.• Procurement of Instrument spares, tools and consumables through the procurement department keeping in view their consumption and Min/Max Level for optimization of inventory level.• Perform and review detail engineering activities like preparation of data sheets/specifications, material requisitions, purchase requisitions for all instrumentation items• Execution of predictive, preventive and corrective maintenance jobs through SAP for maintenance of history, reducing the downtime and increasing the reliability of Instrumentation.• Comprehensive planning and scheduling of I & C works for major turnarounds and short shutdowns. Responsibilities include daily job planning, the arrangement of resources required by the technical team, job supervision, quality assurance, and daily progress monitoring.• Preparation and control of capital and revenue budget regarding instrumentation of plant.• Preparation, implementation and follow-up of training plans for instrument staff on the basis of TNA (Training Need Analysis) for improvement of their skills. Show less • Successfully completed project commissioning and responsible for maintenance of 2x50 T/hr Circulating Fluidized Boilers and 15MW extraction condensing steam turbine including plant auxiliaries for power generation & plant steam requirement.• The auxiliaries include coal conveying and crushing system, limestone conveying and crushing system, waste removal system, compressed air system and cooling water system.• Major responsibilities before commissioning included verification of installation with designsand suggesting solutions and modifications where necessary• Successfully identified and captured opportunities for improvement in equipment maintainability and reliability using Reliability Centered Maintenance methodology• Designed maintenance strategies, procedures and methods to improve efficiency and quality as well as interfacing with the SAP maintenance management system to support service planning and execution• Developed complete plant inventory to ensure reliable supply of spare parts and replacement equipment • Coached and counselled employees on job performance and teamwork.• Participated in commissioning activities of DCS (Siemens S7-400), Control system Field Instrumentation for 15MW Power Project.• Gained working knowledge on configuration and integration of SEIMENS S7 Series (S7 200, S7 300 & S7 400).• Wrote Standard Operating Procedures (SOP) for various critical equipment installed on plant i.e Woodward 505E Turbine Governor Controller, ABB Unitrol Excitation System, SEIMENS SIPROTEC Synchronization device and ABB REG Series Protection relays. • Conduct regular Preventive Maintenance activities of different field instrumentation installed at the plant site. • Hands on experience trouble shooting DCS logic files (Siemens S7-400) during commissioning phase as well as punch listing field instrumentation and control loops against design documents of the project. • Obtained working knowledge in Enterprise Resource Planning software SAP-ERP. Show less

      • Maintenance Manager | Electrical & Instrumentation Services

        Dec 2021 - Jan 2024
      • Construction Manager E&I - Special Projects

        Apr 2021 - Dec 2021
      • Assistant Manager, Electrical & Instrumentation (Coal Fired Power Plant)

        Jan 2017 - Apr 2021
      • Trainee Engineer, Services & Utilities Area

        Oct 2015 - Dec 2016
      • Trainee Engineer, CFB 15 MW Power Plant

        Jan 2015 - Oct 2015
    • Avanceon middle east & south asia

      Jan 2024 - now
      Technical lead - international executions

      Key accomplishments include:* Led a team of engineers in designing and implementing innovative control systems that improved operational efficiency by 25% across multiple projects within the first year of tenure.* Collaborated with cross-functional teams to define project goals and deliverables, achieving a 100% on-time delivery rate for all assigned projects while maintaining budgetary constraints.* Provided technical direction and mentorship to team members, resulting in a 40% increase in team productivity through skill development initiatives and hands-on training sessions.* Developed comprehensive User Requirement Specifications and engineering design packages that streamlined project execution processes and enhanced stakeholder satisfaction ratings by 20%.* Spearheaded the design and implementation of PLC, DCS, and HMI software solutions for various industries, leading to a reduction in system downtimes by 15% post-implementation.* Conducted regular system reviews and quality checks to ensure compliance with industry standards, which significantly improved system integrity and overall performance metrics.Skills: Control Systems Design, Automation Solutions, Project Management, PLC Programming, DCS Integration Show less

  • Licenses & Certifications

    • Industrial automation: advanced scada

      National institute of design & analysis
      Jan 2016
    • Project management foundations: leading projects

      Lynda.com
      Apr 2018
      View certificate certificate
    • Leading teams for impact

      Engage consulting
      Jul 2017
    • Creative thinking & collaboration

      Ici pakistan limited
      Mar 2017
    • Introduction to engineering standards & procedures

      Ici pakistan
      Jan 2017
    • Foundations of engineering applications

      Ici pakistan limited
      Nov 2016
    • Hse awareness

      Ici pakistan
      Feb 2015
    • Interviewing techniques

      Lynda.com
      Apr 2018
      View certificate certificate
    • The seven habits of highly effective people

      Franklincovey(pakistan)
      Apr 2018
    • Plant condition monitoring

      Institute of reliability centered maintenance
      Mar 2018
  • Honors & Awards

    • Awarded to Mir Shayan Rafi
      Chief Executive HSE&S Initiative Award 2018-2019 ICI Pakistan Jul 2019 Won the Chief Executive HSE&S Initiative Award for proposing and implementing an on-site Motor Storage shed for storage and up-keep of over-hauled and emergency spare motors. The initiative resulted in overall improved in stored equipment integrity and plant house-keeping.
    • Awarded to Mir Shayan Rafi
      Explore Challenge Champion ICI Pakistan Jul 2019 In January 2019, ICI Pakistan launched their first company-wide Intrapreneurship platform by the name of "Explore Challenge". Main focus of the platform was to inculcate innovative and out of the box thinking throughout the company. We were awarded the 'Gold Award' in the competition and won a 3 Day trip to Dubai. We proposed and designed a Steam conditioning station for our existing equipment at the plant site which would result in an overall saving of more that Rs 250M per year in… Show more In January 2019, ICI Pakistan launched their first company-wide Intrapreneurship platform by the name of "Explore Challenge". Main focus of the platform was to inculcate innovative and out of the box thinking throughout the company. We were awarded the 'Gold Award' in the competition and won a 3 Day trip to Dubai. We proposed and designed a Steam conditioning station for our existing equipment at the plant site which would result in an overall saving of more that Rs 250M per year in terms of savings in cost of fuel to produce energy. The idea resulted in zero consumption of LP Natural Gas at the plant site in favor of coal. Show less
    • Awarded to Mir Shayan Rafi
      Top Learner of the Year 2018-2019 ICI Pakistan Jul 2019 Was declared one of the top learners across the company on the Learning & Development online portal at ICI Pakistan. The portal features courses from Lynda.com as well as in-house resources.