Jaynesh Shah, MBA

Jaynesh Shah, MBA

Intern

Followers of Jaynesh Shah, MBA1000 followers
location of Jaynesh Shah, MBAHouston, Texas, United States

Connect with Jaynesh Shah, MBA to Send Message

Connect

Connect with Jaynesh Shah, MBA to Send Message

Connect
  • Timeline

  • About me

    Project Management | Business Development and Operations | Reservoir and Production Engineer

  • Education

    • Bellaire High School

      2002 - 2006
    • Texas A&M University

      2006 - 2010
      Bachelor of Science (B.S.) Chemical Engineering

      Activities and Societies: Hindu Students Council

    • Mays Business School - Texas A&M University

      2015 - 2017
      Master of Business Administration (M.B.A.) Business Administration
  • Experience

    • Entrix, Inc.

      Jun 2005 - Aug 2005
      Intern

      - Provided computer support in the form of file transferring, Excel data management, and PowerPoint presentations

    • Arcadis

      Jun 2006 - Aug 2006
      Intern

      - Performed several administrative projects related to gathering engineering data and design information

    • ConocoPhillips

      Jun 2007 - Aug 2007
      Production Engineering Intern

      - Reconciled equipment discrepancies between WellView and actual well rod pumping system in 10-20 wells to insure XSPOC/POC was providing accurate information- Prepared 2 well failure (pre-pull) recommendations utilizing WellView with RODSTAR design analysis- Participated in various site visits & upstream production activities with field personnel- Completed several computer based training & safety courses

    • ConocoPhillips

      Jun 2008 - Aug 2008
      Production Engineering Intern

      - Determined Plunger Fall Rates using the Echometer well analyzer tool- Optimized Plunger Performance in conjunction with gas production wells using gathered data- Gained a further understanding of production and facility engineering in gas fields

    • ConocoPhillips

      Jun 2009 - Aug 2009
      Reservoir Engineering Intern

      - Compared air-flood performance at Cedar Hills North Unit with water-flood performance at Cedar Hills South Unit- Analyzed field and well/pattern level production performance for Cedar Hills North Unit- Identified trends within logical well groups for future CO2 flood performance throughout the Williston Basin- Investigated air-flooded fields to compare & quantify the effects of potential CO2 flooding in the Williston Basin

    • ERM

      Jun 2010 - Oct 2010
      Air Quality Engineer

      - Developed a tool that performs GHG and Criteria Pollutant Emission calculations for Federal and State regulatory compliance - Performed a BACT assessment for cost effectiveness in facility design regarding NOx and VOC controls - Worked on a comprehensive air permitting support project involving NSR and Title V permit renewals- Prepared multiple permits by rule (PBRs) for various manufacturing facilities to authorize emissions

    • ConocoPhillips

      Oct 2010 - Apr 2015

      - Developed well completion procedures with process safety measures to maintain/enhance production rates and reserves (Recompletions: 19; Remedials: 28; P&A: 29)- Created a robust and reliable well database for asset production surveillance programs- Performed economic analyses using PEEP software to control/reduce costs - Designed and optimized production equipment (pumping units, rod insert pumps, etc.) for greater operating efficiency across over 40 production & injection wells in multiple fields and formations- Established chemical treatment programs to improve well flow conditions - Assisted with multiple EOR projects including multiple water-flood re-development and CO2 pilot projects- Maintained waterflood performance for over 40 injection patterns via pressure management and conformance- Developed and implemented an infill drilling program that converted a 5-spot waterflood pattern to a line-drive pattern and added 500+ BOED with 6 producers- Forecasted and coordinated the production budget for base and all planned uplift from capital projects for 1.9 to 2.0 MBOED in a field of over 300 wells Show less - Employed decline curve analysis forecasting production rates, ancillary in property evaluation and development planning, concurrent with analyzing well proposals/potential opportunities applying decision-making criteria attaining 100% compliance with state and federal regulatory mandates- Studied various operating parameters (flowrate, pressure, porosity, permeability, etc.) for reservoir assessment- Developed Key Performance Indicator (KPI) report to communicate capital expenses (capex), volume metrics and inventory management in support of a cost-effective reservoir monitoring program - Estimated reserves for various operated assets using decline curve analysis (DCA)- Evaluated over 1,000 partner-operated ballot proposals over 180,000 gross acres, working closely with reservoir characterization, land, and finance teams, resulting in the construction of $95MM in present value- Created a database tracking all working interest wells to aid in reporting and budgeting of $695MM capital program- Architected data mining workflow for drilling, completions, and production reports for auditing and competitor benchmarking, increasing efficiency of technician workflow by 40%- Accounted for 65% of yearly non-op auditing reviews and reserves bookings, adding 15 MMBOE of proved reserves Show less

      • Production Engineer, Permian Operations

        Aug 2012 - Apr 2015
      • Reservoir Engineer, Bakken Development

        Oct 2010 - Aug 2012
    • Layline Energy Holding Company LLC

      Sept 2015 - Nov 2015
      Senior Reservoir Engineer

      - Arrived at $240MM company valuation by employing decline curve analysis, applying economics theory, aggregating data, calculating well reserves arriving at reserves value- Assessed multiple (3+) oil and gas properties for potential acquisition and divestiture (A&D) - Evaluated offset wells, including collaboration with geologists and landmen, employing well-database then establishing P50 statistical decline curve towards identifying, and meeting, business metrics reporting results to key stakeholders- Executed tertiary enhanced oil recovery (EOR) project according 8 injector wells and 2 producer wells employing CO2 and miscible gas injection attaining financially favorable outcomes Show less

    • Bp

      Dec 2015 - now
      Consultant

      - Team lead for BP Egypt West Nile Delta (WND) Project - Client facing role in collecting business requirements related to upstream operations, distribution of products across the supply chain and procurement of gas and condensate- Managed project delivery framework methods, configuration and milestones for successful and on-time delivery of WND Projects (Phase 1 and 2)- Interviewed 4 BP representative teams, two-rounds, classifying global standards and processes endorsing business-process collaboration, team communication, and across-the-globe compliance with organizationally mandated best-practices attaining 100% institutional objectives- Implemented Energy Components software as the desired solution to ensure minimal loss across the value chain- Designed RACI Diagram, Risk Register and Project Execution Plan (PEP) to track project progression Show less

  • Licenses & Certifications

    • 40 hours HAZWOPER OSHA Safety Related Training

      May 2010
    • EIT

      Texas Board of Professional Engineers
      May 2010
  • Honors & Awards

    • Awarded to Jaynesh Shah, MBA
      BP Safety Award for Presentation on Plant Safety BP
    • Awarded to Jaynesh Shah, MBA
      ConocoPhillips SPIRIT Scholars Scholarship ConocoPhillips
    • Awarded to Jaynesh Shah, MBA
      National Merit Sponsorship Scholarship -