Anugrah E. Eryantono

Anugrah e. eryantono

bookmark on deepenrich
location of Anugrah E. EryantonoEast Java, Indonesia
Phone number of Anugrah E. Eryantono+91 xxxx xxxxx
Followers of Anugrah E. Eryantono542 followers
  • Timeline

    Jan 2012 - Jan 2012

    Facility Engineer Intern

    Chevron
    Jul 2013 - Feb 2014

    Field Maintenance Engineer (Mechanical)

    PT. Pupuk Kujang (Persero)
    Feb 2014 - Apr 2016

    Inspection Engineer (Mechanical)

    PT. Pupuk Kujang (Pupuk Indonesia Group)
    Apr 2016 - Dec 2017

    Reliability Engineer (Mechanical)

    PT. Pupuk Kujang (Persero)
    Jan 2018 - now

    Industry Analyst

    Ministry of Industry
    Current Company
    Nov 2023 - now

    Junior Researcher

    The University of Queensland
  • About me

    Mechanical Engineer

  • Education

    • Sma n 1 jember

      2005 - 2008
      High school natural sciences
    • Smpn 1 jember

      2002 - 2005
      High school science
    • Institut teknologi bandung (itb)

      2008 - 2013
      Student mechanical engineering

      Beside Studying, I've also been following several organisations and assistant of the lecturers.

  • Experience

    • Chevron

      Jan 2012 - Jan 2012
      Facility engineer intern

      The project related to the Gas Pipeline Review. The scope of the work included analyzing the existing conditions of the gas pipeline in Sumatera Operations Chevron Pacific Indonesia (CPI), doing simulation using software to change gas flow directions and generate a design of the piping system in CPI gas pipeline.

    • Pt. pupuk kujang (persero)

      Jul 2013 - Feb 2014
      Field maintenance engineer (mechanical)

       Doing preventive maintenance program of turbomachinery such as oiling, tightening and cleaning. Overhaul or repair of rotary machine.

    • Pt. pupuk kujang (pupuk indonesia group)

      Feb 2014 - Apr 2016
      Inspection engineer (mechanical)

       Doing inspection program to all static and rotating equipment such as visual inspection, NDE and condition monitoring using CSI (bearing housing vibration), System One and ADRE (shaft vibration monitoring). Posed as Inspector during Turn Around (Minor and Major Inspection) in primary reformer, compressor and steam turbine. Familiar with technical standard such as API and ASME

    • Pt. pupuk kujang (persero)

      Apr 2016 - Dec 2017
      Reliability engineer (mechanical)

       Making maintenance strategy (Preventive and Predictive Maintenance) for all mechanical equipment. Evaluate the failures that happened in the plant, particularly for mechanical equipments. Evaluate the maintenance plan for mechanical equipment.

    • Ministry of industry

      Jan 2018 - now
      Industry analyst
    • The university of queensland

      Nov 2023 - now
      Junior researcher

      1. Perform systematic analysis related to green hydrogen production2. Draft a systematic review and policy brief manuscripts

  • Licenses & Certifications

    • Rbi engineer (basic level)

      Professional certification agency of oil and gas indonesia (lsp migas)
    • Static equipment inspector

      Lsp pupuk
      Jan 2016