_Nicoll.webp)
David (Dave) Nicoll
Systems Development & Flight Trails Engineer

Connect with David (Dave) Nicoll to Send Message
Connect
Connect with David (Dave) Nicoll to Send Message
ConnectTimeline
About me
Senior Project Manager at FORMULA ONE MANAGEMENT LIMITED
Education

Preston Polytechnic (Part-Time)
1980 - 1982HNC Mathematics, Statistics and Computing Distinction
Hutton Grammar School
1970 - 1977A-Levels and O-Levels Biology, Maths, Chemistry, Physics, English, French (etc)
Newcastle University
1982 - 1985BSc Joint Honours Mathematics and Computing Science
Experience

BAE Systems
Apr 1978 - May 1991Systems Development & Flight Trails EngineerProject Manager responsible for the development of an engine management system, successfully used in prototype aircraft in advance of the production engine and control system becoming available.Member of a small multi-disciplinary team responsible for the development of a full authority safety-critical digital Flight Control systems for an unstable aircraft. Computer modelling of aircraft and systems. Support to flight trials and system analysis.

TRW
Jun 1991 - Dec 1998Project Manager & Engineering Manager (Braking & Chassis Systems)Engineering Manager responsible for the development of a range of new products, and the provision of resources and engineering skills. Products included:- Electronic Power Assisted Steering (EPAS)- Autonomous Cruise Control (ACC)- Vehicle Stability Control (VSC)- Anti-Lock Brake Systems (ABS)- Heating Ventilating and Air-Conditioning (HVAC)Coordination with vehicle manufacturers and sister companies across Europe and USA.Project Manager responsible for the development of an anti-theft device for automotive diesel engine control systems. Managed the simultaneous development to manufacture of seven variants of the product. Full development lifecycle including software, hardware (electronics), manufacturing support and after-market. Show less

Vivista
Jan 1999 - May 2005Implementation & Development Project ManagerSenior Deployment Project Manager responsible for the simultaneous deployment and go-live of two new products at three different police forces. Responsible for managing the coordination across different stakeholders including senior Police Officers, Police Authority, Courts, and HMG representatives, and the integration of the systems with existing local and national IT systems. Change management including training, legacy data, and transition to Business as Usual.Senior Development Project Manager responsible for managing a large UK development team as part of an HMG sponsored national programme for the Police service (NSPIS). The multidisciplinary team were developing two new large scale business critical n-tier (client-server) products to support all UK forces.Senior Development Project Manager responsible for remedial activities on a large scale legacy C&C system for the police and other emergency services. Show less

Silver Software
Jun 2005 - Jun 2008Senior Project and Programme ManagerProject Manager responsible for the development and integration of the embedded software for a safety-critical rail control and signalling system. Responsible for all aspects of the project, including development process (Agile), safety analysis, recruitment, contract terms and variation orders. Monthly progress presentations direct to customers CEO and board. Development team of 75 direct engineering reports across three countries (UK, India, Spain). Subject to external independent safety assessment and project audit and compliance with CENELEC 50128 Safety-Critical (SIL-4).Project Manager responsible for the formalisation of a customers safety-critical embedded RTOS for rail applications.Short-term secondment to Madrid (Spain) in support of a flight refueling control system project.Project Manager responsible for several aerospace development and verification projects (DO-178B). Show less

Silver Atena
Jul 2008 - Nov 2008Project & Programme ManagerProject Manager responsible for the first joint business with Silvers new partner Atena. This was a Validation & Verification (V&V) project for an aerospace engine management system, with control logic defined in MatLab.Resolution of issues with a telecomms related project.

Project Realization
Oct 2008 - nowFounder and DirectorProject Realization provides project management consultancy, training and software development services.The company was founded in 2009 to help organisations improve their project delivery and software development processes and capabilities, to deliver their technology projects more effectively, and to gain a meaningful ROI as quickly as possible. PRL offers consultancy and guidance or can act as an interim to enable projects to get started quickly when clients resources may be otherwise occupied. Our software development capability can be used to expand a customers own capability or for outsourcing packages of work to PRL.Please contact me if you would like to know more.Tel: +44 (0) 1793 250149 Show less

Government Department
May 2009 - Oct 2010Senior Project ManagerResponsible for the deployment into service of a number of telecommunications projects and the end to end delivery through the coordination of a multi-disciplinary project team in a complex user environment.

Babcock International Group
Jan 2010 - May 2011Deputy Programme ManagerThe Future Strategic Tanker Aircraft (FSTA) is a consortium that provides a flight refuelling capability to the Royal Air Force that will be run as an independent small airline.The programme involves the provision of everything required by an airline, from support to the aircraft, crew, ground staff, maintenance engineers, provision of spares, fuel handling, and associated mission planning systems. Building of new hangars, briefing rooms, IT infrastructure, telecomms, training and simulators, multimedia, furniture etc. Show less

Government Department
May 2011 - Apr 2012Senior Project ManagerResponsible for the development of a new complex embedded system with innovative features, and a critical immovable end-date. Management of a multi-disciplinary team over the whole product development life-cycle from prototype to pre-production, including software, electronics, mechanical and manufacturing.

Oil Advisory and Technical Services (OATS)
Mar 2014 - Jun 2014Consultant (Agile Development)Introduction of Agile development processes and organisation of development teams.

Siemens Rail Automation
Jul 2014 - Mar 2015Senior Project Manager & Agile ConsultantProject Manager responsible for the development of a Train and Signalling Control Centre across the full end-to-end development lifecycle from system requirements through to system integration and test. Agile development processes in compliance with CENELEC 50128 SIL-2, with emergent system requirements.

Oil Advisory and Technical Services (OATS)
Mar 2015 - Jul 2015Consultant
Hitachi Information Control Systems Europe (formerly RWE)
Apr 2016 - Oct 2016Senior Implementation Project Manager (Contract)To October 2016Responsible for managing a team defining the data that describes the local track geography and control requirements for a Rail Operating Centre (ROC), and the subsequent system test and go-live. Internal reporting to the Operations Manager for project schedule, resourcing, costs, risk identification and mitigation activities. External reporting to Hitachi's immediate customer and others in the contract chain to the end-user organisation.

UK Atomic Energy Authority / Culham Centre for Fusion Energy
Dec 2016 - Feb 2018Project #3: MAST Upgrade - Installation of IT network for Control System for fusion vessel First-Bake (Nov 2017 to Jan 2018)The first major milestone for MAST-U is the initial ‘bake’ of the fusion reactor, which requires a number of essential monitoring and diagnostic systems to be available and integrated into the control room via the operational network. In absence of any clear priorities directed and led the installation of the network, connectivity to equipment and switches and associated configurations. All activities completed by end December 2017 ready for first bake in Jan 2018 Show less Project #2: MAST Upgrade - Design and Installation of New IT Server Room, Power, Cubicles and Networks.Responsible for the uplift of the IT infrastructure of the £30M upgrade to the Mega Amp Spherical Tokamak (MAST) experimental fusion plasma facility. This involves the development and implementation of several new capabilities including improved control and monitoring of nuclear fusion experiments, the recording, display, replay, storage and distribution of very high-speed video, the development of a new Virtual Server Farm, design and implementation of a new IT Server Room including the design of new high availability cubicles, installation of new power supplies including 100KvA UPS, and networks. Reporting directly the head of MAST-U Control and Instrumentation for project schedule, costs, risk identification management and resolution, engagement with 3rd party suppliers and subcontractors, close liaison with the overall programme team (including construction, diagnostics, analysis, control) and across multiple departments at senior engineer to department head level, directors and external suppliers. Made several improvements to internal business processes, including schedule and estimating, incremental delivery, estimating, progress tracking, risk identification and mitigation activities. Show less Project #1: Implementation of a new Modular Data Centre (MDC) and High-Performance/High-Performance/High-Throughput supercomputer for modelling the behaviour of nuclear particles. Reporting to the Head of CODAS (JET Control and Data Systems) for the delivery of the whole end-to-end project requiring close coordination and cooperation across many departments ranging from site Estates, Civil engineering, ground workers, IT infrastructure, networks, Procurement, Finance, H&S, internal and external suppliers, and theoretical physicists. The supplier contract was awarded at the end of December 2016 with a challenging target go-live of end March 2017, Responsible for the development and maintenance of a credible and realistic project schedule, risk identification and mitigation, resource planning, skills profiling, cost accounting, and management of third party suppliers in UK and Italy. The project stressed many site procedures but through the application of some Lean and Agile techniques delivered a fully operational system in mid-March 2017, two weeks ahead of schedule. Show less
Senior Project Manager (Contract)
Dec 2017 - Feb 2018Senior Project Manager (Contract)
Nov 2017 - Jan 2018Senior Project Manager (Contract)
Apr 2017 - Oct 2017Senior Project Manager
Dec 2016 - Apr 2017

FORMULA ONE MANAGEMENT LIMITED
Feb 2018 - Oct 2018Project #2: Curve Braking DistanceManaging the development of a Proof of Concept (PoC) product to demonstrate driver braking and acceleration behaviors in the approach and exit from a curve. Determining the precise location of a racing car with respect to the track is extremely difficult due to the speeds involved and the volume of data that needs to be processed across multiple vehicles in semi real-time. By using an innovative combination of data processing technologies from the financial industry and a high-performance database a working PoC has been demonstrated at live races, with new televised graphics being broadcast worldwide. The PoC is now being extended to show those drivers who braked closest to the apex of a curve, considered to be a major factor contributing to a drivers final race position and potentially an early predictor of final race position. Show less Project #1: New Timing SystemThe race timing system is fundamental to the operation of a race (for Formula-1 series and others), it records details of the race times for competitors, intermediate times at points around the track, details of the preceding practice sessions, qualifying sessions, penalties and pit-stops. Data is broadcast live worldwide, and accumulated over the season to determine the overall World Championship and Constructors Championship positions, and produces formal race reports to the FIA for worldwide distribution. The current timing system is based on old unsupported technology and has been substantially modified so maintenance is now a concern.Responsible for project managing a small team developing a replacement timing system using current .NET technologies with C#, CSS, HTML, and XML, with Visual Studio incorporating ReSharper, SonarQube and TeamCity in an Agile approach with Scrum and JIRA. Prior to my involvement the project team had no understanding of their development timescales or resource requirements with no delivery road-map. Responsible for developing a sequence of top-level milestones that steer the development to the completion of the final product, with meaningful interim product releases that can be run at a race as a shadow to the current live system enabling the code to be subject to real-world operational experience with direct comparison to the live system and opportunities for user feedback.Used team performance to provide an estimate of future achievements, identifying resource short-falls and escalating as necessary, leading to other departmental resources being reprioritized and reassigned. Identifying and resolving functional risk areas and priorities with race operations teams. Show less
Senior Project Manager
May 2018 - Oct 2018Senior Project Manager (Contract)
Feb 2018 - Oct 2018

Altran
Dec 2018 - Oct 2019Senior Project ManagerRail industry project developing control software for a European client with Scandinavian end-user. Safety-critical (loss of life) developed in accordance with CENELEC 50128 (SIL4).Agile approach to software development using JIRA, integrating with the clients Waterfall (stage-gate) approach to monitoring project progress.

Rotork
Jan 2020 - Apr 2020Senior Project ManagerManaging a project to uplift an existing actuator control system to extend its manufacturing life and extend its functionality in order to secure its future market position. Uplifts to software/firmware and electronics, some future mechanical uplifts being considered. Managed as a Scrum development project using JIRA with 2-week sprints, sprint-end retrospectives including developer demos.Project was also pioneering/pipe-cleaning the organisations new product development process.Following concerns over potential impact of Corona virus on manufacturing the in-house development team has been successfully working from home, but to protect costs contractors were released. Show less
Licenses & Certifications

Training the Trainers (BTEC Level 4)
PearsonAug 2015
Kanban
LeanKanban UniversitySept 2013
Scaled Agile Framework (SAFe) - Programme Consultant (SPC)
Scaled Agile, Inc.Jan 2014- View certificate

PRINCE2 - Practitioner (renewal)
BCS, The Chartered Institute for ITJan 2016 
Scrum Master - Certified
Scrum AllianceApr 2015
Managing Successful Programmes (MSP) - Practitioner
APM GroupApr 2007
Prosci Change Management Certification Programme - Practitioner
ProsciAug 2013
Agile Project Manager (AgilePM) - Practitioner
APM GroupMar 2013
PRINCE2 Agile - Agile Practitioner
APMG-InternationalJan 2016
PRINCE2 - Practitioner
APM GroupDec 2003
Languages
- enEnglish
- frFrench
Recommendations

Bharat sreepada
Associate Consultant @ PwC India | Climate Change | Microsoft Dynamics 365Chennai, Tamil Nadu, India
Andrew southard
Land Acquisition Analyst for Academy Development in Houston, TexasCollege Station, Texas, United States
Prachi dixit bhaidkar
Investor, DirectorKarnataka, India
Yasin tohmaz
Chief Phamacist Senior Buyer - B.Pharm . Preparing BCPSSalmiya, Hawalli, Kuwait
Bruna de souza oewel
PhD Candidate in Informatics @ UC Irvine | Human-Computer InteractionCupertino, California, United States
Roland laken, cfa
Voltiq - Renewable Energy FinanceThe Randstad, Netherlands
Daniel juárez
Analista de Sistemas | Scrum | Metodologías Ágiles | Documentador | Project ManagerGuatemala, Guatemala
Nicolai mainz
Naval Officer at The Royal Danish NavyDanmark
Pradnya hegde
Full Stack Web DeveloperAtlanta, Georgia, United States
Vaishnavi s prakash
Architect | GRIHA CP | Student at School of Planning and Architecture- SPA VijayawadaBengaluru, Karnataka, India
Jun ng
HR ProfessionalSingapore, Singapore
Nalva nascimento
Líder Multifuncional de Montagem de Resistências ElétricasCabreúva, São Paulo, Brazil
Marta román álvarez
Area Manager Banca Empresas | Comunidad FinancieraValencia, Komunitas Valencia, Spanyol
Ziyaad erasmus
Closer Today Than YesterdayCity of Cape Town, Western Cape, South Africa
Emanuel contreras cuevas
Chemist | PhD Chemistry student | CompChemEast Lansing, Michigan, United States
Henrique melo almeida
Finance Director, Engineer & AccountantGreater Campinas
Mark morris
Founder & Managing Director of Mark Divine Sports Good Private LimitedMumbai, Maharashtra, India
Tosin oludare
Quality Assurance Specialist at OlymelGreater Montreal Metropolitan Area
Sanjitha shenoy
Professional Makeup Artist and HairstylistMumbai, Maharashtra, India
Mohd mehdi zaidi
Senior Software Test Engineer |RestAPI | Database |Salesforce | SDET | Healthcare | Real State|Banki...Noida, Uttar Pradesh, India
...