AIHAM AL THEEB, BSc

Aiham al theeb, bsc

bookmark on deepenrich
Followers of AIHAM AL THEEB, BSc153 followers
  • Timeline

  • About me

    Quality-driven mechanical engineering professional and leader,operational excellence, and cost efficiency across diverse environments| Technical team leader 16 years’ industry experience | Health&Safety Expert

  • Education

    • Faculty of mechanical and electrical engineering in damascus

      1996 - 2005
      Bachelor's degre - no.17862 industrial and product design 57,98 %

      Activities and Societies: ORDER OF ENGINEERING *during my study in the college i designed and fabricated many sound speakers in my workshop to match the HIFI speakers famous brand around the world *graduated with honors in the project of last year which was semi automatic gear box ( design and fabrication in the college workshop)

    • Pearson electrotechnology centre (pec) - lester b. pearson school board

      2021 - 2022
      Diploma of education electrician

      Diploma of Vocational Study: ElectricityLester B.Pearson , Pearson Electrotechnology Centre

  • Experience

    • Ruba factory

      Aug 1999 - Sept 2001
      Mechanic

      Led the development, modification and installation of various manufacturing equipment supporting the production of various pharmaceutical goods. Responsibilities• Viscosity modifications, development of machinery and installations to improve the accuracy and productivity in the manufacture of pharmaceutical goods.• Development of machinery for enhanced productivity in the manufacture of ointments.• Maintenance, testing and reporting of machinery and upholding faultless manufacturing.• Calibration of all equipment and machine components according to specification.• Trouble-shooting and repair of all mechanical equipment of machinery. Show less

    • Wincom computer accessories

      Jul 2002 - Jun 2003
      Team leader

      Strengthened expertise in managing equipment installation, diagnosis and repair in a fast moving consumer environment. Received consistent favorable remarks from clients for efficient and timely service. Responsibilities • Computer assembly to specification and software installation.• Computer repair and post-sale customer support.• Problem and solution logging for analysis.

    • Pharmasyr

      Jun 2003 - Jul 2006
      Maintenance engineer

      Led a team of building maintenance technicians responsible for monitoring and improving the operation of machine and water pump systems. Key Achievements• Directed the implementation of a purified water circulation system using 7 self-priming multi-stage centrifugal SS pumps controlled by Moeller COMPACT PLC.• Maintained adherence to HSE standards while motivating staff to attain high productivity when managing machinery for tablet manufacturing throughout the design and implementation process.• Modifying inverters for the company’s bottle filling machines. This created an efficient and productive machine with various speed settings. Responsibilities • Document control including all standard operating procedures and AMC services.• Leading and mentoring a technical team.• Oversight on all design, specifications and costing at the project initialisation phase.• Research and development, compliance officer and trainer for company’s execution of Industrial Health & Safety measures.• Machine and water pump testing.• Repair and modification of system components including sensors, transmitters and programmable logic controllers. Show less

    • Excellent pipes company

      Aug 2006 - May 2011
      Sr.maintenance engineer

      Spearheaded the management of various plant equipment and machinery ensuring adherence to HSE compliance standards. Key Achievements• Eliminated a serious safety issue by installing a pneumatic system to strengthen the structural integrity of the table supporting the GRP flange pressure test machine that was moving involuntarily.• Analysed and resolved a technical performance issue where the hydraulic system of the GRP pipe pressure test machine was malfunctioning due to high temperature and improper design. • Safely and accurately completed the fabrication of sand conical silo and supporting the structure of Mild Steel for VEM GRP/GRE machine. • Solved a problem that a manufacturer could not fix by modifying the tuning on “X” axis CNC GRP flange milling machine by adding reduction gearbox to both moving shafts. This lessened the backlash error in gearbox tolerance.Responsibilities • Regular maintenance for chillers and water lines , strategic oversight and implementation of preventative manufacturing programmes.• Health and safety compliance, training and enhancement against fire and other industry hazards.• Document control including all standard operating procedures and AMC Services.• Trouble-shooting and investigation of malfunctions.• Performance reporting on all mechanical functions including matrix, machinery, noise levels, fire-prevention, fuel, water and electricity consumption.• All aspects of plant production including planning and designing of the factory and production equipment, procurement, installation, commissioning and qualification of all plant equipment and machinery.• Project management of the implementation of in-plant projects and new factory installations.• Maintenance and repair of all mechanical hardware and systems.• Strategic oversight and implementation of preventative manufacturing programmes.• Staff training on company programmes and safety protocols. Show less

    • Fraser suites doha

      Nov 2011 - Jun 2017
      Maintenance manager

      Partnered with the property leadership team to plan and execute a flawless and high-profile launch of the new facility in 2011. Directed maintenance engineering planning and operations during the preopening through grand opening phases. Maintained reliable systems uptime to ensure quality customer experiences following opening. Entrusted with managing the administration of building drawings, blueprints, electrical schematics and other systems. Key Achievements• Optimized hot water delivery times from 10 minutes to less than 8 seconds by analysing and refining the structure of the piping system with NRV & PVR, a new circulation pump set and Rockwool insulation material.• Increasing the water heating tanks performance by replacing the existing heaters with new one has special design and separating the main water supply tank to cold and hot tank.• Increase the water heater housing life from 2month to 8month by adding reverse osmosis before the heating tank which protect the housing from lime and calcification• Played an influential role in the property having a favourable environmental responsibility reputation by installing LED lighting and an automatic capacitor bank in a low voltage room that reduced power consumption by 30% while boosting the power factor from 0.85 to 0.95.Responsibilities • Directed maintenance engineering planning and operations during the preopening through grand opening phases.• Partnered with the property leadership team to plan and execute a flawless and high-profile launch of the new facility in 2011.• Entrusted with managing the administration of building drawings, blueprints, electrical schematics and other systems. • To implement and manage planned preventative maintenance (PPM) schedules for all Fraser Suites Doha plant , equipment and operating assets to ensure efficient and continuous operation.• Responsible for the pre-opening phase in engineering department. Show less

    • Ibn ajayan projects

      Oct 2017 - Jun 2020
      Mep projects engineer

      Working diligently to facilitate timely attainment of projects goals within set budget in accordance with customer expectations and the highest standards of quality in the industry in addition to monitoring project operations to evaluate progress and implement corrective actions as required , maintaining clear lines of communication with consultant, client and local authorities to promote amicable professional relationships, endure mutual understanding on all issues , expedite the successful completion of necessary procedures , obtain approval for MEP works and provide effective practical solutions for any problems , evaluating the requirement of all project resources according to schedule , and arranging for timely availability of material, machinery and manpower.Accomplishments:• Manages daily site activities including manpower planning, daily work scheduling, quality issues, equipment and tools selection, material take-off and resolve mechanical site issues thru qualified site engineers and site supervisors for entire mechanical department (centralized water supply system, centralized firefighting system and centralized gas system ,automatic irrigation system, sprinklers rain water , septic tanks , grease tanks).• Attend consultant, client and authority meetings discussing site technical and progress issues.• Handles testing and commissioning team for whole mechanical system of the project.• Coordination with suppliers, quantity surveyors and construction department.• Equipment specifications and selection (chillers, AHUs, FCUs, pumps, fans, grills and diffusers, dampers and other auxiliary equipment).• Involved in testing and commissioning works for HVAC air and chilled water balancing.• Manage the installation and commissioning of various pumps and rotary equipment (centrifugal pumps, blowers, reciprocating pumps –etc.). Show less

  • Licenses & Certifications

    • Mechanical desktop 2005 release 8.00

      Specialist sciences center
      Dec 2005
    • Moeller plc level i

      Specialist sciences center
      Feb 2005