Latif Gul (PMP®)(PMI-RMP ®)

Latif gul (pmp®)(pmi-rmp ®)

bookmark on deepenrich
location of Latif Gul (PMP®)(PMI-RMP ®)Al Khobar, Eastern, Saudi Arabia
  • Timeline

  • About me

    Project Manager Low current Division at Saja Energy Co.

  • Education

    • Quaid-e-awam university of engineering, sciences and technology nawabshah

      2006 - 2009
      B.e in electronic engineering electrical and electronics engineering a grade

      কার্যক্রম ও সমাজঃscada system and its soft wear programes as well as plc's heard wear and soft wear

    • Pakistan steel cadet college

      2004 - 2005
      Fsc pree engineering a+
  • Experience

    • Al watnia company for project management

      Dec 2009 - Apr 2010
      Plant enginee

      To provide all the service which required in power plant capacity 64 MGW.

    • Project technology company taif

      May 2010 - Feb 2015
      Electrical engineer

      working in project technology company taif as a project manager of taif. During this job i have been worked on plc, scada, power generation, substation , under ground distribution over head distribution.

    • Hadania corporation

      Apr 2015 - Dec 2015
      Project manager
    • Delta united company

      May 2016 - Dec 2016
      Project manager

      Project manager in power & Telecom department

    • Mishnan group

      Jan 2017 - Apr 2019
      Cheif engineer

      Handling 100 Million SEC-Project( underground & overhead distribution),During this project manage skilled team & preparing budge for 3 years.Unified contractor, Saudi Electricity Company & FTTX,FTTX along with STC, Mobily, ITC, & MOI.• Detailed Fiber Network Design.• Detailed design of Fiber distribution, Fiber Aggregators and splitters to produce Design Overview Report, Node Configuration Design Data, Network Design Layout.• Co-ordinate with the Contractor organizations responsible for project control and execution including direct experience in the management of Engineering Contractors during Front End Definition and Detailed Acceptance Engineering (PAT/OIL).• Prepare and Update the bill of quantities (BOQ) to process the Final Detailed Engineering Design (FDED).• Prepare work orders after receiving FDED approval from Client.• Generate Preliminary Acceptance certificate (PAC), Oil Clearance Certificate (OICC), and Final Acceptance Manual after the sites are approved by client.• Prepare Implementation schedule, Installation and Design documents for the project sites.• Preparation of Preliminary Acceptance Test (PAT) documents for the acceptance testing of new sites in the network region.• Monitor daily progress of work, cost and schedule. Conduct weekly progress review and technical meeting with the client.• Manage the Handover of FTTH ISP/OSP systems from the System Integrator and assuring design has been fulfilled and quality required has been achieved. কম দেখুন

    • Al kifah contracting

      Apr 2019 - Jun 2021
      Project manager

      Telecom, Electrical & Low current projects along with Armco, Sabic, SEC,MOI, STC, Mobily ETCStructured Cabling systems: Installation and testing of the FDR, BDR (Data Center) and MDF. Testing and troubleshooting of the Fiber (SM and MM) using the Exfo FTB 200 OTDR Testing andidentification of the Cat6 UTP cables using the Fluke DSX-5000 Cable analyzer. Testing and troubleshooting of the Cat 3 multi-pair cables for backbone Voice applications. Worked on fiber optic connector ST, SC, LC & Fiber cables (SM & MM). Worked on Fujikura Splicing Machine FSM 80S & Fitel S178A. Preparation of Shop Drawings (Riser, Floor/LC room layouts, Rack Elevations), As- Built.Preparation of Project documents (Method of Statement, O&M manual etc.) Supervising thehandling of preventive and corrective maintenance. Active systems: Installation of the Access and Core switches (HP Aruba/Cisco). Installation of the Wifi access points and conducting the post heat map study. Installation and set-up of the Wireless controller in the Data Centre. Installation and set-up of the Routers, Servers andFirewalls. CCTV systems: Installation and testing of the IP cameras..Installation and setup of the Fusion IV/Maxpro PE Network Video Recorders.. Setting up of theCCTV security control centres Preparation of CCTV control room furniture layouts, Shop drawings, As Built etc. কম দেখুন

    • Saja energy co.

      Jun 2021 - now
      Project manager low current division

       Review design, Material, progress for all the project activities. Installation of UPS for cabinets up to 5 kva. Installation of generators for each building (30 Buildings). Installation of the analogue microwave barrier systems (CIAS) Installation of the Field mediaconverters in the FEC. Termination and continuity testing of the control cables. Setting up of the IB-system interface for integration. Preparation of Termination schedules, Shop diagrams, As-Built etc. Preparation of T&Cdocuments (SAT procedures, O&M manuals etc.) Installation of the SC-3 multimode sensing cable (Fiber Sensys). Installation of the Alarm processing units in the FEC. Termination and testing on the multimode cable. Setting up of the server with genetic plug in interface. Active and Passive systems: Installation and testing of the Building TR/DC with all the ICT components. Installation and testingof the outdoor IP rated FEC with all its ICT components. Testing and troubleshooting of the STP/UTP and SM/MM fiber using Exfo OTDR and Fluke DSX 5000.Installation and setup of the Genetic servers/storage, access/core switches, firewalls etc. Preparation of Shop Drawings (Riser, Floor layouts, Rack Elevations),  Installation and testing of the FDR, BDR (Data Center) and MDF. Testing and troubleshooting of the Fiber (SM and MM) using the Exfo FTB 200 OTDR Testing andidentification of the Cat6 UTP cables using the Fluke DSX-5000 Cable analyzer. Testing and troubleshooting of the Cat 3 multi-pair cables for backbone Voice applications. Worked on fiber optic connector ST, SC, LC & Fiber cables (SM & MM). Worked on Fujikura Splicing Machine FSM 80S & Fitel S178A. Preparation of Shop Drawings (Riser, Floor/LC room layouts, Rack Elevations), As- Built.Preparation of Project documents (Method of Statement, O&M manual etc.) Supervising thehandling of preventive and corrective maintenance. Installation of the Access and Core switches (HP Aruba/Cisco). কম দেখুন

  • Licenses & Certifications

    • Project management professional (pmp)

      Project management institute
    • Certification as pm

      Saudi electricity company
    • Sec safety certificate

      Saudi electricity company
    • Pmi risk management professional (pmi-rmp)

      Project management institute
      Jun 2022