
Timeline
About me
CENGİZ-KOLİN-KALYON-ÖZGÜN Business partnership şirketinde Geological Engineer at HYH (Halkalı - New Airport subway construction)
Education

Ankara kurtuluş lisesi
1991 - 1994Fen bilimleri
Karadeniz teknik üniversitesi
2000 - 2004Lisans derecesi geological/geophysical engineering
Hacettepe üniversitesi
1996 - 1998Ön lisans derecesi construction engineering technology/technician
Experience

Ankara akköprü bridge junction project (bi̇rli̇k i̇nşaat)
Jul 1998 - Sept 1999Construction technicianAfter completing my internship at Ankara Akköprü (meat-fish) bridged junction project, I started to work in the same company. I took part in Fore Pile applications. I left the company to complete my license and prepare again for the exams.

Gümüşhane torul dam (baytur-özdemi̇r joint venture)
Jun 2001 - Nov 2001Construction technicianI worked in the lead tunnel of Gümüşhane Torul Dam with a diameter of 8m and a total length of 1.9km. In tunnel excavation and fortification, I was in shotcrete shotcrete applications. I studied shortly during summer vacation because of my studies.

Tcdd ank.-i̇st. high speed train line project (alarko-ohl-gqo)
Jan 2006 - May 2008Quality control engineerHigh speed train line between Ankara and Eskişehir. I worked as. I was responsible for the works of art (tunnels, viaducts, bridges, culverts, etc.). I worked in the Polatlı tunnel.

Mi̇di̇lli̇ hepp project (taşyapi energy grubu)
May 2008 - Jun 2009Tunnel site engineerI have undertaken the task of controlling the conduit tunnels of the Mineral Water Power Plant in the Amasya center of the Taşyapı energy group. 1st Tunnel is 457m, 2nd Tunnel is 1250m. I was assigned to Taşyapı Energy Group from Administrative Direction and to 2ER Consultancy and Controlling Company from Teknik Direction.

Kadiköy - kartal metro project (pusti̇ler construction)
Jun 2009 - Jan 2012Geological engineerIstanbul (Kadıköy-Kartal metro) S 10 Bostancı, S12 Küçükyalı, S9A Kozyatağı I worked as a geological engineer on the shafts.

Acs construction (highway 9th directorate executive di̇cle univ. bridge junction project)
Jan 2012 - Jan 2013Construction managerOn the Diyarbakır-Silvan road connected to the 9th Regional Directorate of Highways, Dicle ünv. I worked as a construction supervisor in a bridged junction project. The project was completed on December 21, 2012, delivered to the highways and is in an open position. The project is in the shape of alfalfa intersection. The project is available for completion.

Aksa energy sansa regulator and hepp project (85mw) ödf yilmazlar construction
Jan 2013 - Nov 2013Construction managerSansa Regulator and HEPP Project has been delayed due to EIA reports. The project consists of a regulator structure, an energy tunnel with a length of 15040 m, three approach tunnels with a length of 1600 m, a balance bridge, a pipe and a power plant. I left the job because the project was taken by the parent company by waiting for energy.

3. bosphorus bridge, north marmara motorway project
Dec 2013 - Mar 2015Esa constructionIstanbul (Asia) - Turkey Project (İÇTAŞ-ASTALDI PARTNERSHIP) (ICE) 3.Bosphorus bridge is referred to as the North Marmara Motorway Project. I worked in the tunnels chief position, depending on the construction of ESA Riva tunnel project. Riva Tunnel 22m wide, 13m high, 600 meters long, is referred to as 2 x 4-lane highway tunnel.

Dsi̇ 9th regional directorate kanatli dam (stati̇k su- ermi̇t-yörük yapi partners)
Mar 2015 - Mar 2018Construction managerDSİ 9th Regional Directorate is in the project of Kanatlı Dam Project located in Kovancılar district of Elazığ. The project is located in the Upper Euphrates River. The aim is to irrigate a total area of ??6786 hectares according to the irrigation system on the Demirci and Kuşçu plains. Talvegden is 80 m high, Kret length 493 m, clay core, semi permeable fill dam. The 556m long Derivation tunnel was completed and stream water was tunneled. Body injections, Memba water bath filling has been completed, the body has reached 25m height and filling is continuing. Spillway production is 50% completed. The relay path has been completed. Show less

Ant tünelci̇li̇k
Mar 2018 - Mar 2020Şanti̇ye şefi̇DUDULLU- BOSTANCI SUBWAY PROJECT

Türkcan yapi
Mar 2020 - Aug 2020Tunnel section chief at türkcan yapi
Cengi̇z-koli̇n-kalyon-özgün business partnership
Aug 2020 - nowGeological engineer at hyh (halkalı - new airport subway construction)
Licenses & Certifications

Excel'de makro uygulamalari
Orta doğu teknik üniversitesiOct 2019
İş sağliği ve güvenli̇ği̇ uzmani c sinifi
T.c. aile, çalışma ve sosyal hizmetler bakanlığıDec 2016
Güneş enerji̇si̇nden yararlanma
Orta doğu teknik üniversitesiSept 2019
Recommendations

Yasser mater, phd.
Assistant Professor, Senior Structural Engineer6th of October, Cairo, Egypt
Harish gadde
Director/Structural EngineerHyderabad, Telangana, India
Manpreet kaur sandhu
Client Services Coordinator at Bayshore HealthCareKelowna, British Columbia, Kanada
Tomasz chrusciel
SEM ManagerDublin, County Dublin, Ireland_Richard_Komla_Nyamador%2C_MGhIE%2C_PMP%C2%AE.webp)
Colonel (ing) richard komla nyamador, mghie, pmp®
Serving Officer - Ghana Army II Consulting Civil & Geoenvironmental Engineer II Project Manager II T...Accra, Greater Accra Region, Ghana
Ekemini ekwere
UX/Product Designer | Champions Business Growth Via Efficient Designs & Collaborative Marketing Eff...Nigeria
Varun mehta
Branch HeadChandigarh, India
Ben taylor
IT Infrastructure and Security Manager at AgResearchCanterbury, New Zealand
Scott hill
Digital Innovation Manager at The VirtulabDurban, KwaZulu-Natal, South Africa
Thomas oxendine
Career Development Coordinator at Public Schools of Robeson County/Technology CoordinatorMaxton, North Carolina, United States
...