Tayyab Ali, MSPM, PMP®

Tayyab ali, mspm, pmp®

bookmark on deepenrich
location of Tayyab Ali, MSPM, PMP®Riyadh, Saudi Arabia
Followers of Tayyab Ali, MSPM, PMP®6000 followers
  • Timeline

  • About me

    Deputy Project Manager I AGL Electrical Specialist

  • Education

    • The islamia university of bahawalpur

      2012 - 2016
      Bachelor of engineering (b.e.) electrical power a

      Electronic Devices & Circuits, Digital Logic Design, Signals & System, Control Systems, Digital Signal Processing, Communication Systems, Instrumentation & Measurements, DC Machines, AC Machines, Advanced Machines, Electrical Machine Design, Electrical Power Generation, Transmission, Protection, Power Distribution & Utilization, Power Economics & Management, Power System Operations & Control and High Voltage Engineering.

    • Bahria university

      2019 - 2020
      Ms project management summa cum laude

      Agile Project Management, Cost & Finance Management, Risk Management, Procurement & Contract Management, Quality Management, Project Monitoring, Evaluation & Control Management, HR & Communication Management, Fundamentals of Project Management, Dynamics of PMO & EPM Server, Leadership & Negotiation.Projects: Installation of AFL (Scheduling, Execution, M&C) on Primavera P6 and MS Project.

  • Experience

    • Northern power generation (genco-iii)

      Jun 2014 - Jul 2014
      Intern

      - 1st week at annual maintenance of Gas Turbine Power Plants (GTPP)- 2nd week at operations & control of Steam Turbine Power plant (STPP)- 3rd week at working procedure of cooling tower, chemical procedure for purification of water for STPP- Last week at workshop of WAPDA Engineering Academy to gain knowledge regarding winding of rotor, defect repair & corrective maintenance of turbines, Tungsten Inert Gas (TIG) welding, Arc Welding, oxy welding & oxy-fuel cutting

    • The imperial electric company

      Jan 2017 - Jun 2021

      Since the inauguration of Islamabad International Airport, I have overseen the operations, maintenance, troubleshooting, and defect repair of the Aerodrome Ground Lighting (AGL) system, including CCRs, AGLAS, ALCMS, SFL, and induction loops. Additionally, I also managed allied equipment such as MV/LV switchgears, 500KVA transformers, 200KVA UPS, DC chargers, backup DG sets, and apron floodlights, ensuring continuous and efficient airport operations.- Supervised and managed an AGL team of 30 personnel, ensuring efficient operation and maintenance.- Maintained and operated the AGL system in compliance with relevant regulations.- Developed and implemented operational, preventive, and corrective maintenance plans.- Established and monitored AGL Key Performance Indicators, Standard Operating Procedures (SOPs), and Work Instructions.- Diagnosed and resolved breakdowns through effective troubleshooting and root cause analysis.- Ensured all maintenance and troubleshooting activities adhered to OEM guidelines and industry best practices.- Managed adverse weather and low visibility conditions according to SOPs.- Maintained documentation in compliance with SQMS audit requirements.- Prepared and developed quality control documents, including forms, checklists, PPM plans, and schedule reports.- Ensured the AGL system maintained the required level of serviceability per ICAO standards.- Conducted workshops and provided necessary training to the maintenance team.- Identified and monitored risks, developed response strategies, and implemented risk response plans.- Managed stakeholder relationships, particularly with clients, and attended scheduled meetings.- Managed AGL spares and inventory, ensuring the team had sufficient tools and spares for -maintenance activities.- Supported management with budgeting, reporting, audits, inspections, planning, projects, and asset management.- Liaised with clients on key technical issues to address DAAR observations. Show less Project: Handled various projects for clients including the Pakistan Civil Aviation Authority (PCAA), Pakistan Air Force (PAF), and the Pakistan Navy- Planned, scheduled, and monitored projects to ensure successful completion using MS Projects and Primavera P6.- Designed heliports, aircraft warning lights for high-rise buildings, and AGL layouts (CAT-I, CAT-II, CAT-III) in compliance with ICAO standards and client requirements.- Developed comprehensive project schedules with key milestones, creating detailed Work Breakdown Structures (WBS), Resource Breakdown Structures (RBS), and Cost Breakdown Structures (CBS).- Estimated the resources and participants needed to achieve project goals efficiently.- Created work plans and project methodologies for the execution of AGL projects.- Prepared technical and financial proposals in response to AFL Requests for Proposals (RFPs) in accordance with PPRA guidelines, and managed Requests for Information (RFI) and Requests for Quotation (RFQ).- Inquired and followed up on RFQs from foreign principals (ADB Safegate, AXA Power, Cavotec) and local vendors.- Attended pre-bid and bid opening meetings to ensure compliance and competitiveness.- Initiated negotiations and proceedings for contract signing after receiving Letters of Award (LOA).- Coordinated with the supply chain department to ensure on-time delivery of materials.- Managed the successful closing of projects upon completion.- Defined Sales Orders (SO), Purchase Orders (PO), Goods Receipt Notes (GRN), Delivery Notes (DN), and invoices in SAP as required. Show less Project: ILS CAT-IIIB/A-SMGCS Upgradation Project at Allama Iqbal International Airport, Lahore-Pakistan- Established and implemented work systems for the efficient management of maintenance services- Involved in installation, testing & commissioning of CAT-IIIB AFL, Airport Smart Power, NAVAIDS, Surface Movement Radar & Advanced Visual Docking Guidance System- Prepared daily site progress reports- Prepared & processed Interim payment certificate (IPC)- Ensured utmost safety during the work on AGL systems at site- Ensured that team members carried out their tasks efficiently while compliance with ICAO & relevant standards Show less

      • Assistant Manager (Aviation Projects)

        Apr 2018 - Jun 2021
      • Planning & Estimation Engineer

        May 2017 - Apr 2018
      • Project Engineer

        Jan 2017 - May 2017
    • Bahria university islamabad,pakistan

      Feb 2021 - Aug 2021
      Visiting faculty member

      Courses taught to MS Project Management students were as follows:1) Dynamics of PMO & EPM Server2) Primavera P6

    • Continental engineering services (pvt.) ltd.

      Jul 2021 - Sept 2022
      Deputy project manager i afl engineer

      Managed operations and maintenance of Airfield Ground Lighting systems at Continental Engineering Services (Pvt.) Ltd. Oversaw project setup, planning, and stakeholder management. Led a team of 30 Manpower to ensure quality management and resource optimization. Achieved compliance with audit requirements.

    • The imperial electric co.

      Oct 2022 - Jul 2023
      Lead electrical specialist (airside systems)

      Project: Service Level Agreement for Operations & Maintenance of Airfield Lighting (AFL) & allied system at Islamabad International Airport.

    • Almabani general contractors

      Jul 2023 - now
      Agl project & planning engineer

      Project: Construction of Airfield Signage & Airfield Lighting at King Khalid International Airport (KKIA).- Proficiently create schedules using Primavera P6, ensuring accurate representation of project timelines and critical paths.- Develop detailed schedule reports, providing stakeholders with comprehensive insights into project progress and potential challenges.- Implement effective monitoring mechanisms to track project milestones, dependencies, and deviations from the baseline schedule.- Utilize Primavera P6 capabilities for resource allocation, optimizing project timelines, and enhancing overall project efficiency.- Generate regular schedule updates, highlighting key accomplishments, milestones, and any adjustments made to the project plan.- Proficiently craft Extension of Time (EOT) requests and prepare claims in my current role.- Conduct meticulous delay analysis and coordinate critical paths for effective project management.- Manage risks, ensuring alignment with project timelines and adherence to budgets.- Showcase expertise in construction claims management, documenting and analyzing claims with precision.- Apply schedule compression analysis to optimize project timelines and resource allocation.- Responsible for progress tracking and the application of Earned Value Management (EVM) for comprehensive project performance evaluation.- Leverage a comprehensive understanding of construction planning methodologies to contribute significantly to successful project delivery.- Develop comprehensive Project Control Plans to guide project execution and control processes effectively.- Foster effective communication through the documentation of project progress, issues, and resolutions.- Contribute to the development and improvement of project management processes and documentation standards.- Craft detailed Baseline Schedule Narratives, providing a clear understanding of the project schedule's key components and milestones. Show less

  • Licenses & Certifications

    • Negotiation associate (ncn-a)

      Ng study
      Mar 2019
    • Programmable logic controller

      B.tech automation
      May 2016
    • Generative ai overview for project managers

      Project management institute
      Mar 2024
      View certificate certificate
    • Pmi certified member

      Project management institute
      Nov 2020
    • Pmbok guide 7th edition review 18 pdu's, renew the pmp

      Udemy
      Oct 2023
    • Indra normeka frangible masts

      Adb safegate
      Dec 2022
    • Project management professional (pmp)®

      Project management institute
      Dec 2020
      View certificate certificate
    • Fundamentals of waterfall project management

      Project management institute
      Apr 2022
      View certificate certificate
    • Alis fundamentals and on-site registration

      Adb safegate
      Dec 2022
    • Introduction to adbsafegate

      Adb safegate
      Jul 2023
  • Honors & Awards

    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Recognition Institute of Electrical & Electronics Engineers Dec 2015 Awarded for promoting IEEE activities in Branch as a Vice Chair, IEEE-PES Chapter, UCET-IUB
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Recognition Institute of Electrical & Electronics Engineers (IEEE) - Power & Energy Society (PES) Nov 2015 Outstanding Performance in the Presentation Competition on "Energy Crisis and it's Solutions"
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Recognition IEEE - The Islamia University of Bahawalpur Oct 2015 Contribution in Organizing IEEE Week 2015
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certifcate of Appriciation PSYWC Aug 2015 Attending 9th episode of Pakistan Student/Young Professionals/Women in Engineering Congress 2015 held at COMSATS Institute of Information and Technology, Islamabad
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Recognition IEEE & The Islamia University of Bahawalpur Nov 2014 Significant Contribution in Organizing 6th, IEEE AEPEX 2014 at IEEE UCET IUB
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Appreciation Higher Education Commission & Islamia University Bahawalpur Aug 2014 Attended 03 days International Conference on Renewable Energy Resources (ICRES-2014)
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Merit Fazaia Degree College Rafiqui Mar 2008 2nd Position in Science Exhibition
    • Awarded to Tayyab Ali, MSPM, PMP®
      Certificate of Merit Fazaia Degree College Rafiqui Jun 2007 2nd Position in Annual examination_2007