ahmed kamal

Ahmed kamal

bookmark on deepenrich
Followers of ahmed kamal309 followers
  • Timeline

  • About me

    Project engineer at ACICO group

  • Education

    • Alexandria university

      2004 - 2009
      Civil engineer
  • Experience

    • Tmgh

      Sept 2009 - Apr 2011
      Site engineer

      Madinaty project Madinaty project stretches over 33.6 million m2 with investment 2.5Billion DollarDuties:1- Meet with the General Contractor to keep the project on time and on budget.2- Analyze survey reports, maps, drawings, blueprints and other topographical or geologic data to plan projects.3- Plan and design transportation or hydraulic systems and structures, following construction and government standards, using design software and drawing tools.4- Compute load and grade requirements, water flow rates, and material stress factors to determine design specifications.5- Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards.6- Direct or participate in surveying to layout installations and establish reference points, grades, and elevations to guide construction.7- Estimate quantities and cost of materials and equipment.8- Ensuring all materials used and work performed are as per specifications.9- Resolving any unexpected technical difficulties, and other problems that may arise.10- Provide technical advice regarding design, construction, or program modifications and structural repairs to industrial and managerial personnel11- Conduct studies of traffic patterns or environmental conditions to identify engineering problems and assess the potential impact of projects.• Contact details.34/36 Mussadak St.Tel: (202) 33016701/33312000 (30 lines). Fax: (202) 33362198www.talaatmoustafa.com / [email protected] عرض أقل

    • Plena group

      Apr 2011 - Apr 2012
      Business development engineer

      Duties:1- Undertaking technical and feasibility studies and developing detailed designs.2- Communicating and liaising effectively with architects, subcontractors, contracting civil engineers, consultants, co-workers and clients3- Formulation of strategy and market plans.4- Thinking both creatively and logically to resolve design and development problems.5- Study and researching the Market size and competitors.6- To position the product to the prospect to create the need for the solution using client reference and case study.7- Co-ordinate with the technical team to study the customer specific challenges and communicate the product specific features to address these challenges.8- Co-ordinate with the technical team or handle customer centric presentation of the product.9-Supervising tendering procedures and putting together proposals, calculate budget of projects.Contact details.Corniche EL-Nil-Saray El-Madii, Tower B-Madii 11431-Cairo-EgyptTel: +20-2-5277793/4/5/6- Fax: +20-2-5277797www.plenaegypt.com / [email protected] عرض أقل

    • Selem-bioconservacion

      Apr 2012 - now
      Project engineer

      KUWAIT projects :  Worked on KIPIC (KNPC) Al-Zour Refinery Project EPC package (4), acting as a performing Authority from SAIPEM under SPES JV/ IREM spa contractor. Worked on preparing feasibility studies of Abu Halifa Hotel project planned to be constructed with investment 65 million Kuwait Dinars owned by ACICO. Renovation and maintenance of 4 building complex of mixed use with investment 1.6 million Kuwait dinars at Mangaf Kuwait.SAUDI ARABIA Project : MC1&MC2 phases of Azizya project with investment 635 million Saudi Riyals on building 380 resident villas in AL Dahran, Saudi Arabia. Development includes infrastructures, mosques, mall, schools and recreation facilities. Duties: 1 - Developing detailed designs, Coordinate, support and supervise the project construction, installation and fit-out up to building hand over. 2- Identify the project risks and provide the proposal to solve and/or mitigate.3- Supervising tendering procedures and putting proposals.4- Managing budget and maintain the project financial sheets, cost, committed spend, payments.5- Direct construction, operations, and maintenance activities at project site.6- Compiling, checking, approving reports and manage scope change claims during the project execution.7- Monitor project progress and performance, schedule and direct team actions to successfully achieve established budgetary and contractual targets.• Contact details.P.O Box 1306-AL-Kobar 31952-Saudi Arabia / 6th floor- Awquaf Complex- Sharq- KuwaitKSA Tel. +966-3-8675588 -Fax: +966-3-8962422 / KUWAIT Tel. +96599958863www.acicogroup.com / www.selemint.com / www.biconservacion.eu عرض أقل

  • Licenses & Certifications

    • - authorized to sign permit as performing authority from saipem (kipic al-zour refinery project epc) card no. ptw-0063 - certified engineer at kuwait socity of engineers (kse). - certified engineer from saudi council of engineers (sce).

    • Pmp

      Pmi