Ullas Kamath, B.E. (Inst), PMP.

Ullas kamath, b.e. (inst), pmp.

bookmark on deepenrich
location of Ullas Kamath, B.E. (Inst), PMP.Qatar
Phone number of Ullas Kamath, B.E. (Inst), PMP.+91 xxxx xxxxx
Followers of Ullas Kamath, B.E. (Inst), PMP.493 followers
  • Timeline

    Oct 1989 - Mar 1992

    Project Instrumentation Engineer

    ICB Engineers & Contractors, Mumbai, Maharashtra India
    Mar 1992 - Mar 1998

    Assistant Manager - Instrumentation

    Finolex Industries Limited
    Apr 1998 - Dec 2002

    Area incharge Instrument Maintenance Engineer

    Kentz
    Dec 2002 - Jun 2008

    Senior Instrumentation Engineer

    HOT Engineering And Construction Co.
    Jun 2008 - Mar 2016

    Project Manager

    IMCO Engineering & Construction Company
    Mar 2016 - Mar 2019

    Senior Project Manager

    VENTARE ENGINEERING W.L.L.
    Mar 2019 - May 2022

    Senior Project Manager

    Galfar Al Misnad Engineering and Contracting W.L.L.
    Current Company
    Apr 2023 - now

    Operations Manager

    Mekdam Technology, W.L.L.
  • About me

    Operations Manager at Mekdam Technology W.L.L.

  • Education

    • Malnad college of engineering, hassan, karnataka

      1984 - 1988
      Bachelor of engineering (be) instrumentation technology

      Activities and Societies: Leo Club - MCE chapter - served as Leo Tamer and Leo secretary; Students Association of Instrumentation Technology (SAIT) - served as member; Civilian Rifle Club - MCE chapter - served as Joint Secretary.

    • Pompei junior college, aikala, kinnigoli, mangalore

      1982 - 1984
      Pre university course pcmb

      Activities and Societies: Student representative

    • Manipal college of pharmacy

      1979 - 1981
      Diploma in pharmacy pharmacy
  • Experience

    • Icb engineers & contractors, mumbai, maharashtra india

      Oct 1989 - Mar 1992
      Project instrumentation engineer

      Joined as a PROJECT ENGINEER -INSTRUMENTATION and Promoted as SENIOR ENGINEER – INSTRUMENTATION.Carried out the Construction & Commissioning activity for various Projects / Contracts right from the initiation stage until commissioning and handing over. Projects / Contracts Executed 1) Vinyl Acetate Monomer (VAM) – Project for M/s. Vinyl Chemicals India Ltd., at Mahad – Maharashtra State, India2) RPL Phase -1 Petrochemical Complex - Projects for Reliance Petrochemicals Ltd., at Hazira, Surath - Gujarath State, India. Comprising of Mono Ethylene Glycol (MEG) Plant , Vinyl Chloride Monomer (VCM) Plant, Ethylene Transfer Facility (ETF) Plant, Off sites & Utilities Plants, Suspension grade Poly Vinyl Chloride(SPVC) Plants, Tank Farm area.Prepared the detailed Scope Of Work / BOQ, Prepared and implemented the Project execution Plan and Planning schedule for Instrumentation work activitiesEstimated, Planned, mobilized & Managed the Man Power, Equipment & Material resource for the project Prepared the procurement plan and executed the procurement activities for the project materials like Raising procurement request, Techno–Commercial Evaluation & negotiation with vendors, Selection & finalizing the vendors till receipt of materials at site Prepared and implemented the HSE Plan/ Procedures, QA/QC Plan & Procedures Actively participated in the Project progress review meetings Technical review meeting & follow-up meetings with Client, Consultants & other contractors / vendors.Coordinated for the complete Construction, Installation, Inspection, Calibration / testing & Loop Testing for the complete Instrumentation activities for the project. Assisted the Client /Consultant in carrying out the SAT, Pre-Commissioning and commissioning activities for all the Instrumentation works.Carried out the Field Red Line mark up & As Built Documentation and other close out activities Show less

    • Finolex industries limited

      Mar 1992 - Mar 1998
      Assistant manager - instrumentation

      Joined as a Plant In-charge Senior Instrumentation Engineer and Promoted as ASSISTANT MANGER - INSTRUMENTATION Carried out the EPIC Project for SPVC Ploymerization Plant, SPVC / EPVC Pneumatic Conveying Plant, Storage & Bagging Plants Instrumentation activity works for Detail engineering, procurement, construction, Testing , Pre-commissioning & commissioning activity during the Project Phase and there after continued in Maintenance services for the above plants & facilityCarried out Day to Day Instrument Maintenance & Trouble shooting for the smooth operation of the plants / units.1) Actively participated in the day to day plant O&M and progress review meetings2) Preventive & Corrective Maintenance activities and Annual Shutdown / Turn around jobs 3) Planned & Managed the Man power, Equipment and Materials 4) Prepared the Technical Specification for Instrument spares, Initiated & Followed-up for procurement actions.5) Carried out Feasibility / Constructability studies for implementing the Field Change Orders on plant modification / improvement / Problem solving schemes/upgrade for Instrumentation & Control to minimize / avoid further failures, break- downs & losses.6) Document updating, imparting training & guidance, rewarding to sub-ordinates.FOR IN-HOUSE PROJECTS, CARRIED OUT THE FOLLOWING ACTIVITIES Carried out the EPIC activity for the In-House project and plant upgrade / change order modification work Instrument activities right from initiation to close out Developed Planning Schedule and executed of the Instrument Installation works, Calibration, Inspection & testing, Loop – checking, Pre-commissioning and Commissioning activities.Developed & Implemented methodology for safe running and operation of the existing units & facilities during execution of new project / upgrade & modification activities Updated the various documents in Red Line mark up and As- Built Show less

    • Kentz

      Apr 1998 - Dec 2002
      Area incharge instrument maintenance engineer

      Served M/s. Kentz Overseas Ltd, Kuwait for the Instrument Maintenance contract with KNPC Mina Al Ahmadi Refinery, KuwaitCarried out complete Instrumentation Maintenance activities for the KNPC MAA Refinery Gas Plant area Utilities, LPG handling & Storage area, South Pier LPG Ship Loading Berths, Sulphur Handling, Granulation, Storage & Sulphur Ship Loading Berths Deputed as Area In-Charge Instrument Engineer for AGRP PROJECT in KNPC MAA Refinery, carried out review of detail engineered documents from maintenance point of view , prepared & finalized the SPIR & Spares requirement, updated the CMMS system and carried out Construction & Commissioning works. Duties & Responsibilities carried out:Day to Day Instrument Maintenance & Trouble shooting in the plants / units.Attended various (daily, monthly, yearly) Production Review meetings for monitoring the Plant status, operation & production, maintenance issues.Carried out Planning & Execution of :- 1) Preventive & Corrective and Shutdown Maintenance jobs 2) Managed Man power, Equipment and Materials for maintenance contract3) Prepared the Technical Specification for Instrument spares, Initiation & follow-up of procurement actions.4) Carried out Feasibility studies, evaluation, Detail Engineering and Implementing of Instrumentation for the Field Change Orders on plant modification / improvement schemes.5) Coordinated & Interfaced with other discipline engineers for the smooth plant maintenance / Operation / Shutdown activities.6) Actively participated in Group discussions for Problem analysis, suggesting & implementing solution from Instrumentation point of view of suitable alternatives and Up-Grade of instruments to minimize / avoid further failures, break- downs & losses.7) Carried out Annual Shutdown / Turn Around activities for plant Instrumentation8) Document updating, imparting training & guidance, rewarding to sub-ordinates. Show less

    • Hot engineering and construction co.

      Dec 2002 - Jun 2008
      Senior instrumentation engineer

      Executed the following EPIC PROJECTS for KOC & KNPC, Kuwait.1) KOC #17278: Installation of VSM Driven Crude Transit Pumps at 11 GC's South & East Kuwait – KOC . 2) KOC #29464: Upgrading of Brackish Water Network in West Kuwait –KOC (at GC-16, 17, 27 & 28, Abdulliyah Brackish Water Center & Minagish Water Injection Plant) - EPIC Contract. 3) KNPC #CA/FPPD/ 001 : Transferring of 3.3 KV & 440 V loads from M33 & M35 Substations to New M31A substation at KNPC Mina Al-Ahmadi Refinery AS A PROJECT ENGINEERManaged & Carried out all aspects of the PROJECT INSTRUMENTATION ACTIVITIES right from initiation till close out for the ProjectParticipated & Contributed actively in the various Project Progress Review meetingsCoordinated & Carried out the Detailed Engineering activities.Developed & Implemented the Planning Schedule for Instrumentation activities Coordinated for the Procurement activity Project Instrumentation materialsPrepared & Managed Man Power & Equipment mobilization plan, the QA/QC Documents for Instrumentation activityExecuted the complete Instrument Construction, Installation, Inspection, Calibration & Testing, FAT, SAT, Pre-Commissioning and Commissioning activities/worksCarried out complete documentation for the project like Red Line Markup, As-Built and Project Dossier documentation works Completed the handing over of Project Deliverables & Project Close out Activity AS ESTIMATION & COSTING ENGINEER : Prepared the Costing & Estimation of the Instrumentation SOW for the Oil & Gas Project Tenders from KOC/ KNPC / MEW/ JO/ EQUATE/ PIC. Prepared detailed Project Tender SOW & BOQ / BOM in line with the Tender Technical Specs & contractual requirement for Instrument works and prepared the Cost Estimation for the bid and finalized the Bid with the ManagementPrepared Tender documents for submission inline with the client's tender submission requirements.Carried out Administration activities of E&I Department & Manpower Resource Management. Show less

    • Imco engineering & construction company

      Jun 2008 - Mar 2016
      Project manager

      Successfully Executed EPIC projects for Qatar Petroleum 1) GC11106400: EPIC For Upgrade of Antisurge and Turbine controls at Khatiyah North, Khatiyah Main, Fahahil Main, Jaleha & RG Plants.2) GC07102900: EPIC Of Control, ESD, F&G and SCADA Systems Upgrade For All Khuff Wellhead Treatment Plants(KWHTP) New Control Room For KWHTP’s E,G & H, L and New Central Workshop at Plant G.3) LC11104200: EPIC For Cold Flare System Upgrade At Gas Recycling Plant Within Dukhan FieldsManaged all aspects of the EPIC Projects right from Project Initiation to Close Out Processes - including Planning, Execution, Monitoring & Controlling processes.Met the Project Objective and Stakeholders expectations within the Project scopeDeveloped and Managed the Budget & implemented Cost Control measures Mobilized & Managed the Project team for the timely and successful completion of the projectDeveloped & Implemented the Project Execution Plan and Project Planning Schedule in Primevera. Managed the Detail Engineering activity and the Procurement Activity for the ProjectDeveloped & Managed the Project Risk Management Plan, Identified Risks & Opportunities and took appropriate action to mitigate Risks & exploited the OpportunitiesConducted the Project Progress Review Meetings, Technical discussion meetings, internal progress review meetings & follow-up meetingsDeveloped & Implemented the Project Quality Assurance & Quality Control Plan & procedures, the Project Communication Plan & procedures and the Project HSE Plan, Policies and Procedures.Organized & Conducted the FAT / SAT / PAT & Inspection activity for the various Project Materials and O&M Training for the Client personnel by OEM trainers Prepared the Lessons Learnt Record and implemented the corrective / preventive actions to improve the ongoing / upcoming milestone / project activitiesOrganized the systematic handing over of Project Deliverables & Project Close out Show less

    • Ventare engineering w.l.l.

      Mar 2016 - Mar 2019
      Senior project manager

      Managing the OPERATIONS AND PROJECTS for the INFRA STURCTURE PROJECTS - MEP WORKS HVAC / ELECT / FIRE FIGHTING/ FIRE ALARM / P&D / ELV works contracts & Sub-contracts

    • Galfar al misnad engineering and contracting w.l.l.

      Mar 2019 - May 2022
      Senior project manager

      Successfully completed QatarEnergy contract GC17104400 : EPIC for Halul ICS upgrade & New LER-1 Project for QatarEnergy.Project Key Objectives:Honeywell ICS Automation System upgrade project with Cyber Security System and Construction of a New LER-1 building (G+1) complete with MEP, Building services, Utilities & Landscaping etc.,Upgrading and Relocation of all the existing facilities from Old LER building to Newly constructed New LER-1 buildingCreating a Parallel Backup Facility for Operation & Maintenance, Control of Halul facility. Previously the same was done through NCB / CCB only. Key Challenges Met:Executing the Project without disturbing the Normal Operation of the Halul facilities during the ICS System upgrade change over by taking shutdown only for ICS System upgrade and maintaining the Halul facility Operational. Managed the project execution during the severe Covid-19 hardship period taking care of Health of safety of the team in close guidance & coordination with the QatarEnergy team.Managing the Marine Logistics issues for Material & Manpower mobilization / demobilization activity. Show less

    • Mekdam technology, w.l.l.

      Apr 2023 - now
      Operations manager

      Managing Operations and supporting execution of on going Oil & Gas EPIC Projects with QatarEnergy and Kahramaa

  • Licenses & Certifications

    • Project management professional

      Project management institute
      May 2014