Ahmad Abdallah

Ahmad abdallah

bookmark on deepenrich
location of Ahmad AbdallahEastern Province, Eastern, Saudi Arabia
Followers of Ahmad Abdallah4000 followers
  • Timeline

  • About me

    Construction Manager at SIC-SA

  • Education

    • El shiekh el shrakawy institute

      2005 - 2008
      Secondary school basic science 92%
    • Cairo university

      2012 - 2013
      Applied science diploma petroleum geology

      Activities and Societies: AAPG, young professional in Egypt

    • Al-azhar university

      2008 - 2011
      Bachelor of applied science (b.a.sc.) geophysics and seismology good 73%

      Activities and Societies: American association of petroleum geologist AAPG, society of petroleum geophysicist SEG

  • Experience

    • National research institute of astronomy and geophysics.

      Apr 2010 - Apr 2010
      Workshop member

      Groundwater exploration using geoelecterical method

    • Apache corporation

      Jul 2010 - Jul 2010
      Summer trainee

      Seismic interpretation TWT and Structure Mapping for different data sets (Digital 2D&3D and hard copy Data) of many areas in Egypt

    • Apache corporation

      Mar 2011 - May 2011
      Internship

      The main role of that internship to defund and understanding the workflow sequence in order to "integrated between different data set and scales “, I gained a lot of interpersonal skills that help me to be an efficient team member and sometime team leader.as addition 'I used that project to fulfillment my graduation project "under title of (Prospect generation and evaluation in East Bahariya concession ,Western Desert ,Egypt .

    • Aapg young professional in egypt

      Mar 2012 - Feb 2013
      Active member in discover of egypt series

      Out lines and sessions titles :Global Tectonic and their Structure evidence in the study area ...Stratigraphic succession ..depositional environment ...petroleum system analysis..

    • Society of petrophysicist and well log analyst spwla

      Feb 2013 - Feb 2013
      Wettability work shop member at belayim petroleum company

      The impact of wettability on production outlines :Wettability, Definition, Origin and AlterationWettability Measurements Techniquescase study

    • Petroservices gmbh

      May 2013 - Nov 2014
      Surface logging geologist

      Responsible for:* Examine and describe samples as per oil industry standards and client’s specifications. * Evaluate all samples for the presence of hydrocarbon shows.* Closely monitor gas levels, lag time and drilling parameters, and report any anomalies to the appropriate persons for action.* Monitor and evaluate all data in order to identify abnormal indications of unforeseen or hazardous events, inform the relevant drilling personnel of potential dangers, indications of drilling assembly wear/failure, etc.* Assist in core recovery and description as required.* Assist the client in the control of drilling operations. Show less

    • Gama /contest

      Dec 2015 - Dec 2016
      Qc engineer

      The main tasks and duties:• Following up site and ground investigations• Planning detailed field investigations by analyzing samples of deposits/bedrock.• Approves incoming materials by confirming specifications; conducting visual and measurement tests; rejecting and returning unacceptable materials, for example, sand and gravels.• Documents inspection results by completing reports and logs; summarizing re-work and waste; inputting data into quality database.

    • Trevi s.p.a.

      Jan 2017 - Nov 2023

      I have a multitude of responsibilities; including :• Supervise the site activities of different Ground improvement techniques and following up QAQC testing Sequence.• Reporting Production and testing progress in a daily, weekly and monthly basis.• Planning in details for Production activating and coordinate between Surveyors and setting out team.• Coordinate with the technical team to define the Production Parameter (Energy details and grids Selection) base reviewing theResults of trial area.• Update the Project Forecasts and monitoring Project KPI. • Quantity Survey and Interim payment from issuing to certify.• Control the site requirements and expenses and prepare the cost Report. Show less

      • Site Manager

        Oct 2020 - Nov 2023
      • Site /Technical Engineer

        Jul 2019 - Oct 2020
      • Site Engineer- QAQC Engineer

        Jan 2017 - Jul 2019
    • Sic-sa

      Nov 2023 - now
      Construction manager
  • Licenses & Certifications

  • Volunteer Experience

    • Teaching Religious Science

      Issued by El Nasr education office on Jan 2005
      El Nasr education officeAssociated with Ahmad Abdallah