
Timeline
About me
Senior Planning Engineer
Education

Project management institute
2019 - 2019Pmp® certified project management, pmbok 6th edition
Amal jyothi college of engineering, mahatma gandhi university- kerala,india
2008 - 2012Bachelor of technology (btech)- mechanical engineering mechanical engineering first classActivities and Societies: Volley ball college team, Athletics. Quiz club
Experience

Jcb india-techs ltd
Oct 2012 - Dec 2013Management trainee• Carryout and Supervise Pre-delivery inspection of BHL.• Assist service engineer to coordinate service equipment and resolve the maintenance and repair works within the time frame• Provide information; assist in planning and implementing cost-effective equipment modifications to help improve safety and reliability throughout.• Organize fuel trial expo throughout the territory.• Scheduling sales works carried out, retaining purchase orders and invoices for materials required for maintenance work. Making sure a product is made reliably and will perform consistently in specified operating environments.• Presenting schedule of works to others in the company who is involved in the processes.• Monitoring the sales and maintenance processes at different stages of its development.• Recommending modifications following prototype test results. Show less

Bharat petroleum corporation limited
Jan 2014 - Feb 2015Maintenance engineer (contract)Predictive Maintenance (Rotary)-• Trained and experienced in Emerson’s machinery health collector CSI 2130 and Emerson’s machinery health Analyzer.• Lead the worker team to different refinery plants on the basis of pre-planned monthly schedule, so that the entire team covers 1500+ equipment thrice in one month.• Vibration monitoring includes the vibration measurement of pumps, motors, compressors, turbines, engines, FD and ID fans and blowers.• Reporting the abnormalities observed via data collection and preliminary vibrational analysis to CRC vibration analysis department. Working with the team to predict the upcoming issues and also to suggest the proper maintenance solution.• Scheduling the notifications from different refinery plants and suggesting the maintenance remedies.• Conducting time framed Lube oil analysis to find the wear, contamination and chemistry of the sample with the help of equipments like Emerson’s lube analyzer 5200 and viscosity analyzer 5*DV. Microscopic analysis of the sample and proper reporting.• Ensuring the workers safety through providing them with adequate safety materials.Maintenance (Static)• Duties including visual and dimensional inspection, Isometric and P& ID Drawing’s interpretation and welding inspection of Pipes, valves, flanges, fittings etc.• Inspect and approve material used in the project in accordance with engineering specifications and conduct material traceability.• Perform pre-welding, in-process welding and post welding inspection.• Perform in-process and final inspection using NDT methods and Witness the NDT inspections like PT, MT and UT.• Perform pad leak testing as per applicable QCP.• Review the PWHT reports and chart.• Witnessing processes like Valve testing, Bolt torquing etc.• Familiar with codes and standards like ASME B 31.3, ASME BPVC SEC IX, BPVC SEC II, BPVC SEC V, ASME B 31.4, ASTM, API and SAES-W-011 Show less

Shilpi engineering pvt. ltd
Nov 2014 - Nov 2014Maintenance supervisor- staticShutdown Maintenance of static equipments in Vacuum Gas Oil Plant (Contract)

Arabtec construction llc
May 2015 - nowProject 5: Al Wasl Tower (2020T), Sheikh Zayed Road, Dubai, UAE.Designation: Planning Engineer (Aug 2020 to present), Project Brief: Main Tower: 2B + GF + 62 F (Offices + Hotel Floors + Residential + Roof & Upper Roof+ Landscape + Gym+ SPA + Swimming Pools. Car Park: 2B +GF +12 Floor. BUA: 169,320 Sq.mClient: Wasl LLC.Consultants: Werner Sobek, UN Studio.Project cost: AED 1.46 Billion.Project duration: 1035 days. Show less Project 5: VERA & REVA Residential Towers, Business Bay, Dubai.Designation: Planning Engineer (Jan 2019 to Aug 2020), Project Brief: Construction of Residential Twin towers (VERA (521 keys) & REVA (535 keys)). VERA (Tower 1): 1B+G+3P+25 Typical Floors + Roof & Upper Roof+ Landscape+Gym+SPA REVA (Tower 2): 1B+G+3P+27 Typical Floors + Roof & Upper Roof+ Landscape+Gym+SPAClient: DAMAC World Real Estate.Consultants: Engineering Consortium Consulting Engineers (ECCE).Project cost: 300 Million.Project duration: 730 days. Show less Project 4: Media City Hotel (Grand Plaza), Dubai Internet City, Dubai (5 Star hotel)Designation: Planning Engineer (Aug 2016 - Dec 2018), Project Brief: Construction and completion of 235 Key Media City 5 Star Hotel with a structured basement parking. The development consist of 3 Basements, Ground floor and 25 floor level including the 5 level podium/ public area. Client: Thalia Real Estate LLC.Client Representative: Mirage Leisure and Development.Consultants: Archgroup.Project cost: 341 Million.Project duration : 669 days Show less Project 2: Louvre Museum, Sadiyat Island, Abu Dhabi.Designation: Planning Engineer (Nov 2015 – Jul 2016)Joined Louvre Museum project at its ‘Construction & Finishes Phase’ as a Planning engineer of Arabtec-Sanjose-Oger (ASO) JV, reporting to the JV Planning Manager. Involved in the preparation of detailed programme for security gate house buildings and also for landscape works package. Got responsibility to handle these areas for programme updates, KPI reports, sub-contractor coordination & progress reporting.Project Brief: 64000 SQM Built up area with architectural design excellence (16+Individual buildings), Dome with 180 metre dia, Marine works(break waters), Landscaping, Security Gate houses, MEP systemsClient: Tourism Development Investment Company(TDIC).Consultants: Buro Happold & Atliers Jean Nouvel.Project cost: 2.8 Billion. Show less Project 1: Najmat Plot C14 , Reem Island, Abu Dhabi.Designation: Planning Engineer (May 2015- Nov-2015) Joined Najmat C-14 Project at its ‘Finishes and Closeout’ as a Planning engineer reporting to Senior Planning Engineer. Was involved in close monitoring & follow up of Balance works, Snagging & De-Snagging activities, Testing &Commissioning, Authority approvals and Project Closeout documentation procedures. Project Brief: Residential Tower of 3B + G+2P+ 23 floors including Pent houses, Roof and Upper Roof and Landscaping worksClient: Aabar Investment PJSC.Consultants: Architecture & Planning group (APG).Project cost: 300 Million. Show less
Planning Engineer
Aug 2020 - nowPlanning Engineer
Jan 2019 - Aug 2020Planning Engineer
Aug 2016 - Dec 2018Planning Engineer
Nov 2015 - Jul 2016Planning Engineer
May 2015 - Nov 2015

Shaanxi construction engineering group corporation limited, dubai, uae
Dec 2020 - Apr 2022Senior planning engineer• Prepare detailed Resource & Cost loaded Baseline Programs, Master Schedules, weighted ‘S- Curves’ inaccordance with the Contract requirements & obtain approvals.• Updating, monitoring and reviewing the construction schedules. Performing schedule analysis based onCPM Methodology.• Reviewing, Monitoring and commenting Sub-contractors’/ Supply chains’ Planning submittals,Engineering submissions, procurement and delivery logs.• Implement Recovery/ Mitigation programs to avoid non-Excusable delays & contractual delay damages.• Drafting contractual correspondences inline to the Particular & General conditions, FIDIC versions.• Contributing in Main Contract & Subcontract administration.• Extension of Time (EOTs) (Interim & Final Particulars) claim preparations using the methodologiesstipulated in the Contract (E.g., Time Impact Analysis, Impacted As Planned, Window analysis),submissions & obtain approvals. Notice of Claims submissions in line with Contract Clauses.• Schedule updates & analysis using software Oracle Primavera P6 latest versions. Advanced MS-Officeskills are utilized for detailed work monitoring and tracking.• Preparing and tracking the resource requirements & allocations. Generate Resource Histograms, &Control KPIs'. Computing SPI & CPI. Planned Vs Actual Vs Forecast reviews.• Earned Value implementation (EVM) & analysis to ensure adequate visibility to the Project Manager.• Gathering the performance data and updates as required including narratives, tabular reports, varianceanalysis, forecasts, trends, Resource Forecasts, Productivity tracking & monitoring.• Risk identification and tracking changes, actual and potential, to the project scope, ensuring estimatesof schedule impact for giving visibility to the client and project management.• Generate, Publish & obtain approvals for Periodic Progress reports (Monthly & Weekly). Review otherStakeholders EOTs’, Programs & reports. Show less

Jll project and development services
May 2022 - nowSenior planning engineer
Licenses & Certifications

Aciarb
The chartered institute of arbitrators- View certificate

Project management professional (pmp)- pmp®
Project management instituteDec 2019 - View certificate

Advanced primavera p6
LinkedinApr 2020 
Asnt level 2
The american society for nondestructive testing
Volunteer Experience
National Service Scheme
Issued by organization on Jun 2006
Associated with Ron Noble PMP®, ACIArb®
Languages
- enEnglish
 - hiHindi
 - maMalayalam
 
Recommendations

Ingy saban
Process Responsabile at Bozankaya A.SConstanţa, Romania
Florentina martin
Product Marketer | Content Marketing Manager | Content Strategist | Branding Consultant | Marketing ...Chennai, Tamil Nadu, India
Manikandan ramasamy
Cloud Certified Senior Technical Product Manager | Certified Microsoft Azure Solutions Architect Exp...Farmington, Michigan, United States
Augustine gentilucci
Project, Technical & Engineering ManagementHouston, Texas, United States
Carol magdalena
UX/UI Design | UX Research | Product DesignRio de Janeiro, Rio de Janeiro, Brazil
Inmaculada rodríguez gómez
Administrativo comercialZafra, Extremadura, Spain
Burkhard selent
Director Scientific AffairsDeutschland
John c. haynes, jr.
Graduate Student, M.A. in History program. Missouri State UniversityMilton, Florida, United States
Christer emil rognsøy
Report developerNorway
Srija veeramalla
Programmer Analyst TraineeHyderabad, Telangana, India
...