Hakan HANOZU,MBA,MCMI

Hakan hanozu,mba,mcmi

bookmark on deepenrich
Followers of Hakan HANOZU,MBA,MCMI4000 followers
  • Timeline

  • About me

    Sr. Program Specialist at Honeywell

  • Education

    • Anatolian high school

      -
    • Chartered management institute

      2021 - 2022
      Level 5 diploma management and leadership
    • Cumhuriyet üniversitesi

      2003 - 2007
      Bachelor of science electrical engineering (b.s.e.e.) 72
    • İstanbul bilgi üniversitesi

      2015 - 2018
      2,88 gpa master of business administration (m.b.a.) laureate international universities | laureate education

      Activities and Societies: Courses: - Business Management - Managerial Economics - Financial Management - Strategic Management - System Analysis and Design - Operations Management

  • Experience

    • Yace engineering inc.

      Sept 2007 - Aug 2008
      Electrical engineer

      Main Activities And Responsibilities:- Revise the electrical project (shop drawing ) according to local and international standarts .- Attending meetings, electrical tests and carry out reporting missions.- Coordinate, plan and schedule electrical installations.- Responsible for coordinating supervisory missiions and handover the project on time.- Prepare and carry out BOQ (Bill of Quantity), interim payment missions with contractor company Projects: - Halkalı Intersection Lighting Project - Istinye Park Tunnel Lighting Project - Istinye Park Intersection Lighting Project - Bağcılar Engelliler Sarayı Electrical Project - Ikitelli Tem Basın Expres Road Underground and Lighting Project Show less

    • Gmd engineering inc.

      Jan 2010 - Jul 2011
      Electrical design engineer responsible for various domestic and international projects.

      Main Activities And Responsibilities:- Accomplished the Electrical and ULV System Projects with 10 electrical designer at peak point.- Design of general electrical drawings with design team according to the local and international standards.- Prepared the technical reports (Electrical Design Report), BOQs, and required calculations such as Electrical Load analysis, short circuit current calculations, voltage drop calculations, lighting calculations with relevant programs.- After load analysis , selecting the capacity of electrical equipments (Generators, transformers, cables and other electrical devices)- Coordinate with customers and obtain necessary approvals of the design documentsProjects:- OYAK Housing Project / ANKARA- Çermikler HES Project / SİVAS- Zafer International Airport / KÜTAHYA- Ortana Factory / ANKARA- School Project / ALGERIA- Bakü International Olympic Stadium / AZERBAIJAN Show less

    • Deltaom engineering

      Aug 2011 - Nov 2012
      Electrical site engineer - isaf military airport project in bastion camp -afghanistan

      Main Activities And Responsibilities:- Directed the BOQ (Bill of Quantity), submittals , interim payment missions with main contractor company (METAG).- Designed the airfield lighting project for aprons, taxiways , runways according to Unified Facilities Criteria (UFC).- Responsible for the design, specificaitons , related to general electrical systems accoring to BS and NEC standarts.- Revised the electrical project (shop drawing) according to BS , NEC standards and customer requests- Coordinate, plan and schedule electrical installations.- Attended meetings, electrical tests and carried out reporting missions to client and PM.- Responsible for coordinating supervisory missions and handover of the project on time. Show less

    • Polimeks

      Dec 2012 - Aug 2013
      Electrical site manager responsible for the yelken yacht club project

      Main Activities and Responsibilities:- Accomplished the Electrical System Project with 150 employees/staff at a peak at 9months.- Managed the design phase (shop drawings prepared by the central design office),lead the site implementation performed by subcontractors based on these shopdrawings, project specs. and Russian (R) snips.

    • Tav construction

      Aug 2013 - Nov 2016

      Main Activities and Responsibilities:- Developed the Test and Commissioning strategy by transferring know-how from ADPIngenierie - the leading company in the sector - and provided nearly ~€500M profit viausing our own resources.- Accomplished the T&C Phases (from FAT to integrated Test and Scenarios) for wholesystems (Electrical-ULV, Mechanical, IT, Special Airport Sys.) nearly within 1 years.- Managed the processes of transition from a newly constructed buildings to a fullyfunctioning airport with TAV ORAT team. (progressed in parallel with tests and orat)- Lead the Steering Committee meeting with a Client GACA prepared and followednecessary weakly technical reports.- Handed over the whole Airport to Client and Operator company with requiredtechnical documentation (Punch Lists, O/Ms, Spare Parts, Warranty Certificates,Maintenance Period Requirements etc),- Directed the Supplier Training processes for all systems.- Planned and directed the SLA processes with client and airport operator company(DAA International). Show less Main Activities and Responsibilities:Main Activities and Responsibilities:- The cost of the project was reduced by 10% via Value Engineering workshopscarried out by examining MS documents, projects specs, and and the latest designed.- Directed the design phase (shop drawings, technical calculations etc.) for Electricaland ULV systems , and accomplished the management of site installations accordingto these projects.- Directed the inspections with QA/QC department and Consultant's Engineersand and controlled the required installations per our discussions.- Guided the Variation Order (VO) processes according to the Scope ManagementPlan, documented the required drawings and technical reports.Responsible of Electrical Systems:- Power Plant – 20 MVA – 13.8 KV – 60 hz / 2250 KVA MV Generators- MV Switchgear - Ring Main Units - LV Systems – UPS - CPS- ULV Systems - CCTV - SACS – FAS – PAS – MSC – EMS – PMS – LCS- Airfield Ground Lighting (AGL)- PBB - PCA - GPU 400 hz - VDGS- SCADA - BMS Show less

      • Test&Commissioning Manager responsible for the King Khalid International Airport Terminal 5 Project

        Oct 2015 - Nov 2016
      • Senior Electrical Engineer responsible for the King Khalid International Airport Terminal 5 Project

        Aug 2013 - Oct 2015
    • Proline bilişim

      Jan 2017 - Nov 2018
      It/security project manager responsible for the istanbul new airport project (~€20m budget)

      Main Activities and Responsibilities:- Accomplished the Physcical Security System Project (€20M budget) with 235personel at peak point (~35 white collar and 200 laborer) with just 23 months.- Development of a team - Nearly 35 engineers and hundreds of workers gainedexperience in airport projects and especially in physical security projects.- Successfully coordinated the 6 Project Management Frameworks called; Cost,Scope, Quality, Customer Satisfaction, Risk and Time.- Lead the Steering Committee meeting with clients, preparing the weekly reports andfollowed necessary actions accordingly.- Directed international and domestic vendors such as Genetec, NEC, LENEL,NAVTECH, AXIS, DALLMEIER etc.- Guided Quality Control - A customer-oriented approach has been developed byavoiding feedbacks on cost and time via successful quality control management.- Systematized the Field Operations via a task management system called JIRA andProject Planning System called MS Projects.- Developed a Claim Strategy - With a successful Change Order Management, aClaim Strategy was designed and provided extra % 10 profit.- Directed the Operational Readiness, Activation and Transition Phase (ORAT) withmain contractor.- Directed the T&C Phase by developing T&C Strategies - As an achievement, out ofthe 72 airports, first we completed the integration of the systems.Managed Systems. and Scales:- Video Surveillance System – 9.600 cameras - Axis- Access Control System – 3.500 Doors - Lenel- Integrated Security Management System - Genetec- Operation and Observation Center – Videowall’s (SOC, AOC, PSOC etc.) - NEC /Vuwall- Face Recognition System – 248 Cameras Simultaneously - NEC- Ramp Control System – 36 High resolution cameras - Dallmier- License Plate Recognition System – 34 Cameras - Autovu Sharpv / Genetec- Video Analytic System - KiwiVision / Genetec- Perimeter Security and Defender System with Ground Radars – 32 km Fence,Radars (20 ea ) - Navtech Show less

    • Honeywell

      Apr 2019 - now
      • Sr. Program Specialist

        Sept 2021 - now
      • Airports Project Manager

        Apr 2019 - now
  • Licenses & Certifications

    • Engineering accreditation certificate

      Saudi council of engineers
    • Letter of recommendation and appreciation

      Aecom company
    • Us embassy project certificate

      Obo
    • Certificate of team work

      Tav academy
      Aug 2015
    • Certificate of english course

      Wall street institue
      Jan 2011
    • Exercising leadership: foundational principles

      Harvard university
      Feb 2021
      View certificate certificate
    • Pmi certificate

      Bahcesehir university
      Jun 2018
    • Itil

      Bilge adam
      Sept 2018
    • Cio / cto academy

      Bahcesehir university
      May 2018
    • Intelligent automation for project managers

      Linkedin
      Nov 2024