Farid M.

Farid M.

Completions Engineer

Followers of Farid M.287 followers
location of Farid M.Azerbaijan

Connect with Farid M. to Send Message

Connect

Connect with Farid M. to Send Message

Connect
  • Timeline

  • About me

    Sr. Completion and Intervention Engineer

  • Education

    • N1

      -
    • Azerbaijan State Oil Academy

      2003 - 2007
      Bachelor Petroleum Engineering
  • Experience

    • BP SD

      Sept 2007 - Jun 2009
      Completions Engineer

      Jack-up and Semi-submersible rigs. Gas condensate producer field.Design and execute well Completions and Re‐completions (up to 7km deep).Prepare a completion risk register and apply the risk assessment process throughout the planning andexecution phases of the project.Perform timely completion planning to meet requirements.Develop complete list of BP / third party required completions equipmentPrepare completions and workover Programs and determine completion performance targets.Specify and witness tool / assembly makeup and testing at vendor base sites.Review and prepare Load Out and POB lists.Prepare cost and time estimates for completions and workovers and ensure accurate cost monitoring isperformed and reconciliation.Monitor daily completion and workover operations.Prepare Completion End of Well Report. Work within multi-discipline team of subsurface, drilling, interventions engineers and service providers. Show less

    • BP ACG (EA)

      Jun 2009 - Apr 2011
      Completions Engineer

      Performing Completions Supervisor and Offshore Completion Engineer roles as required.Design and execute well Completions and Re‐completions - oil producer and water injector wells (OHGP, DTS, ESS, ERD).Design and execute well Completions and Re‐completions.Driving safety during planning and execution, offshore and onshore.Design options of suitable sand face and upper completion technology.Prepare a completion risk register and apply the risk assessment process throughout the planning andexecution phases of the project.Perform timely completion planning to meet requirements.Develop complete list of BP / third party required completions equipmentProvide completion installation / integrity assurance and production optimization through: flowmodelling, tubular sizing, stress analysis, torque/drag modelling, equipment specification and sand facecompletion philosophy adherence.Prepare Lower and Upper Completions and Recompletions Programs.Prepare well SOR's and AFE'sSpecify and witness tool / assembly makeup and testing at vendor base sites.Ensure correct procedures and QA/QC process are followed.Review and prepare Load Out and POB lists.Prepare cost and time estimates for completions and ensure accurate cost monitoring is performed andreconciliation.Monitor daily completion operations and verify adherence to authorized Completion Program.Prepare Completion End of Well Report.Provide Completion Engineering support to subsea production operations, well performancetroubleshooting and general well operating procedures.Work within multi‐discipline team of subsurface, drilling, interventions engineers and service providers. Show less

    • BP ACG (CA)

      Apr 2011 - Jun 2013
      Completions Engineer

      In addition to previously mentioned:Design and execute well Completions and Re‐completions, oil producer, gas injector and CRI wells(OHGP, C&P, DTS, ERD).Performed ECD Reducing Open Hole Displacement.Design and execution of wireline (including tractors) perforation, logging, standing valve/plug runningand ASV setting.Installation of first pulse set (interventionless) ASV in the world.Developed improved mud conditioning process.

    • BP ACG (EA)

      Jun 2013 - Jun 2016
      Completion Engineer

      In addition to mentioned before:Performing several Interventions jobs for other platforms (planning and execution).Design and execute well Completions and Re‐completions, oil producer, gas injector, water injector andCRI wells (OHGP, C&P, DTS, ESS, ERD, Interventions).Developing procedures and support Drilling team in well suspension project.Organizing, attending and developing procedures for SUT/SIT's as required.Performing Casing wear and Flux calculation analysis.

    • BP AGT

      Jun 2016 - Jul 2017
      Completions Engineer

      Design, planning and execution of the first Cased Hole Gravel Pack Project in the Region.Organized, attended and developed procedures for SUT/SIT's as required.Analyzing Tubing Stress, Torque/Drag and Wireline deployment.Performing equipment selection for CHGP project and issuing Technical File notes.Review and apply best practices from other regions and suppliers verifying application for the project.Performed and presented Casing wear and Flux calculation analysis for CHGP project.Designed the way on trapping underbalance during perforation while keeping the well full of overbalanced fluid.Developed CHGP Emergency Shut down procedures during Completion Operations.Review and analyze stress orientation and existing regional fracturing experience to assess feasibility of fracturing.Developed an option with two Side Entry Sub assemblies allowing to pull string above perforationsdirectly after perforation.Performing detailed design, equipment and procedure reviews with vendors, senior colleagues, TL's, Superintendents and Central Team.Created drawings, technical specification and equipment manufacture orders as required for equipment not existing in the inventory for CHGP project, provision of full scope of work, required dates and proper material. Show less

    • BP

      Jul 2017 - Aug 2018
      Completions Engineer

      Design and execute well Completions and Re‐completions, oil producer, gas injector, water injector andCRI wells (OHGP, C&P, E-line and TCP perforating, DTS, ESS, ERD, Interventions, CHGP). Prepare completions and workover programs and determine completion performance targets. Act a steward for BP and only create quality requisitions within my area of responsibility.Thoroughly review vendor service quality issues, invoices to ensure we are being charged and reimbursed appropriately.Work closely within multi-discipline team of Central Completions, Completions Engineering, Petro physicist, Geology, Base Management, Drilling and Interventions teams.Performing Completions Supervisor and Offshore Completion Engineer roles as required.Prioritize and support offshore team in driving Safety during operations (stopping the job if required, discussing specific risks during pre-shift meetings/TBT's, procedure reviews with offshore team, discussions and meetings with Operations team and OIM).Assuring that all changes to the SOR, completion design and program are appropriately documented and risk assessed both onshore and offshore. Show less

    • BP AGT

      Aug 2018 - May 2020
      Wellsite Engineer

      Provide engineering support to assist the offshore team in delivering safe, compliant, reliable, and cost-effective wells. Reporting to Wells Superintendent with solid line and DETL with dotted line. Provide engineering perspective and challenge to all rig operations.Participate in the development of Rig Work Instructions (RWI) and hole section guidelines, provide risk identification and an engineering perspective.Identify key differences in actual well operations versus the plan; as necessary.• Act flexible and fill gaps proactively to support offshore and onshore teams as necessary, optimize efficiency of well operations. Foster a thorough awareness of well operations and the interface with the office-based engineering role.• Mentor Challenge and junior engineers while offshore.• Participate in onshore CWOP's / DWOP / Intervention meetings.• Provide engineering support to assist the offshore team in delivering safe, compliant, reliable and cost-effective wells.• Actively participate in all HSE initiatives and safety meetings with active participation and explanation of operational procedures and risks as required.• Safe and efficient execution of ALL well activity in conformance with BP’s policy/ practices, standards, programs and regulatory requirements.• Support alignment and integration between Production and Wells during operations.• Environmental compliance with company standards and government legislation.• Giving due consideration to Process and Personal Safety.• Coordinate AAR after every phase with input gathered from 3rd party contractors and gather lessons the LL register for weekly discussion with the onshore team.• Look for and evaluate opportunities to reduce well cost or improve residual safety risks through elimination of scope, propose modifications of the well design, or by developing different ways to deliver the well quicker or cheaper, all while balancing risk and demonstrating effective risk management. Show less

    • Bp AGT

      Dec 2021 - now

      Research, evaluation, analysis and execution support of new technology in the region. Responsible for all related Completion and Intervention aspects within the assigned project. Responsible for assessing requirement, planning and execution for platform Intervention activities as a single point of contact.

      • Senior Interventions and Completions Engineer

        May 2024 - now
      • Completion and Intervention Engineer

        May 2020 - now
      • Interventions Engineer

        Dec 2021 - May 2024
  • Licenses & Certifications

    • WellSharp Drilling Operations, Surface/Subsea, Workover Completions, Supervisor

      IADC
      Sept 2024
    • "BOSIET” Basic Offshore Safety Induction and Emergency Training with EBS

      RelyOn Nutec (Global)
      Jul 2019
    • IWCF - Combined Surface and Subsea BOP Stack, Level 4

      International Well Control Forum
      Nov 2016
    • WellSharp Drilling Operations, Surface/Subsea, Workover Completions, Supervisor

      IADC (International Association of Dredging Companies)
      Aug 2018
  • Honors & Awards

    • Awarded to Farid M.
      SRA Award BP AGT Jun 2018 For support in delivering wells, as well as coaching new Completions team members.
    • Awarded to Farid M.
      SPOT Recognition Award BP Wells Sep 2017 In recognition of effort in delivering first CHGP in the field with a special mention of operational supportto make this project successful and dedication during the first CHGP job in the field for the outstandingquality of the job, safety, great results (~50% above the estimated production delivery) and unlockingfuture opportunities.
    • Awarded to Farid M.
      Regionally Commended Helios Award BP AGT Sep 2014 Regionally Commended Entry in “Excellence” category:Offline Mud Conditioning and ECD Reducing Open Hole Displacement Technique
    • Awarded to Farid M.
      AGT Region Annual Engineering Awards (2nd place) The Well Engineering BP Values category BP AGT 2013 Installation of first pulse set Annular Safety Valve in the world
    • Awarded to Farid M.
      SPOT Recognition Award BP Wells 2011 In recognition of hard work and commitment for successful Completion planning and installation.