Vĩnh Nguyễn Văn

Vĩnh Nguyễn Văn

Electrical Engineer

Followers of Vĩnh Nguyễn Văn31 followers
location of Vĩnh Nguyễn VănVietnam

Connect with Vĩnh Nguyễn Văn to Send Message

Connect

Connect with Vĩnh Nguyễn Văn to Send Message

Connect
  • Timeline

  • About me

    Electric designing Manager

  • Education

    • Hà Nội University of Science and Technology

      -
      Bachelor Power System Engineering

      Activities and Societies: Secretary of Young Union Secretary of Young Union

    • Hà Nội University of Science and Technology

      2000 - 2005
      Bachelor of Applied Science (B.A.Sc.) Power System Engineering
  • Experience

    • Trang An Limited Company

      -
      Electrical Engineer
    • Toàn Đức Construction & Investment Joint Stock Company

      Aug 2005 - Aug 2009
      Technical Engineer

      Designing power lines and transformer substations with voltage up to 110kV and supervising construction at site.Some typical project:Designing a 110kV line for Vinakansai plant in Ninh Bình Province.Improve medium voltage grid in Do Son District, Hai Phong Construction of underground cables and transformer substations 400 kVA-22/0,4 kV to supply power for the BIDV branch at 38 Hang VoiConstruction of underground cables and transformer stations 2x1000 kVA-22/0.4 to supply power for Hong Ngoc Hospital - HanoiMission:Find out the capital requirements, the conditions of work, and the documents related to the projectsConducting regular field visits to monitor and evaluate project activities in accordance with work plan.Monitoring project database and checklist for monitoring and statistics.Electrical Design at the request of chief designer Preparing Acceptance Test, As-built and Quantity Documents for Advance Payment, Final Account, Reason of Delay for Extension the Schedule of Project.Perform other duties as requested by the project leader of the site. Show less

    • Power Investigation and Designing 4 One Member Company Limited.

      Aug 2009 - now
      Electric designing Manager

      Designing power lines and transformer substations with voltage up to 110 kV.Some typical projects:Effective power distribution DEP 2 in Hai Duong Province: including low voltage power line in 10 communities in Kinh Mon DistrictPower supply to remote communes phase 4 – Lai Chau Province: including 77 km medium voltage lines, 6 transformer substations and 10 km low voltage power linesImproving rural power distribution system in Ninh Giang District, Hai Duong Province: including low voltage power grid in 22 communities in Ninh Giang DistrictEffective power distribution DEP 2 in Dien Bien Province: including low voltage power grid in 10 communities in Dien Bien District and Dien Bien Phu CityLower the medium voltage power line 373E3 and 375E3 from 35 kV to 22 kV: new construction of 1,000 m underground cable of 24 kV for power substation of Times CityConstruction of the rural power distribution system in Quang Ninh Province (phase II): including 10.8 km medium voltage power lines, 2 transformer substations and 10.8 km low voltage power linesDesign 22 km Line and transformer substation of 110 kV in Muong SoDesign 12 km Line and transformer substation of 110 kV to supply power for the steel plant in Cao BangMission:Find out the capital requirements, the conditions of work, and the documents related to the projectsDevelop the outline of the field survey mission and field survey plansParticipate in the survey to better grasp the characteristics of the workDesign electric work Make the total project cost estimates Uphold the design documentPrepare biding documentPreparing Acceptance Test, As-built and Quantity Documents for Advance Payment, Final Account, Reason of Delay for Extension the Schedule of Project Show less

    • Trang An Industrial & Commercial Joint Stock Company (ITA.,JSC)

      May 2013 - now
      Management of Power System Design

      Management of design for power lines and transformer substations with voltage up to 110kV. Some typical projects:Improving the capacity of the transformer substation in Thanh Xuan District 2014 (phase I&III): including 26 transformer substations and additional low voltage power line of 4 kmConstruction of new transformer substations in Hai Ba Trung District 2014 (Phase I): 10 transformer substationsConstruction of new transformer substations in Hai Ba Trung District 2014 (Phase II): 8 transformer substationsConstruction of new transformer substations in Hai Ba Trung District 2015 (Phase II): 5 transformer substationsConstruction of 2x2000 kVA-22/0,4 kV transformer substation to supply power for high-tech building of Viet Duc hospitalImproving medium voltage distribution grid in Cao Bang Town – Cao Bang Province: including 78 km of medium voltage power line and 114 transformer substations Improving Rural power distribution system in the South of Ha Noi – Thanh Oai District: including all medium and low voltage grids in 6 communitiesSupply power to villages without electricity in Điện Biên ProvinceConstruction of 2x2000 kVA transformer substation to supply power for the Cancer Center in Quang Ninh ProvinceMission:Identify the capital needs of a project to determine the scale and order of the project implementation in compliance with the provisions of each funder.Find out the current status of work (document storage, the period of repair, etc.)Develop the outline of the field survey mission, conceptual design and basic design. Estimate construction cost.Direct the topographical and geological survey with the survey manager and decide the design plans. Make preliminary calculation of options and assign designer to perform particular calculation of items before design.Develop the list of documentsAssign a designer to develop detailed designReview the particular calculation, detailed designs for accuracy and consistency. Show less

  • Licenses & Certifications

    • Certificate of designing line and transformer substation with voltage up to 110kV

    • Certificate of designing power systems in civil work.