
Timeline
About me
Process Engineer at Malaysia LNG Sdn Bhd
Education
Universiti malaysia sarawak
2012 - 2017Bachelor degree of chemical engineering with honours chemical engineering and energy sustainabilityUniversiti malaysia sarawak
-Bachelor degree in chemical engineering (honours)
Experience
Shell
Jun 2016 - Sept 2016Hps demo intern*Validated Process Engineering Flow Scheme (PEFS) for HPS Demo to allign with As-Built HPS Demo Plant. -Assessing as-built PEFS & Plant Changes (PC)*Goal Zero Walk with HSSE team*Done line tracing for As-Built HPS Demo Plant.
Press metal group
Jul 2017 - Apr 2018Production engineer* Production Engineer for Aluminium Billet Operation at Casthouse Department (Phase 2)* Establish Standard Operating Procedures (SOPs) for Aluminium Billet Production Process* Leader for 50 production team members including 3 Chinese, 5 Myannmese, 4 Indonesian operation staff -Conduct toolbox briefing to the team on safety compliance & task need to be done -Giving internal training to the team on production SOPs & safety compliance -Assurance for SOP compliance to be practiced on production site*Planning furnace pre-heating timeline for commissioning*Engaging with different disciplines from Finance & Purchasing, General Building & Infrastruture Maintenance (GBIM), Quality Assurance & Quality Control, Electrolysis (QAQC) & also Power Distribution (PD) departments * Working together with Planning & Press Metal Klang (PMK) Sales Marketing Department for aluninium billets production targets including the delivering & shipping * Involve in registration of machineries in casthouse Phase 2 to the Environment Safety & Health (EHS) department to meet Department of Safety & Health (DOSH) requirement* On Job Training (1 month) at Casthouse Department Press Metal Sarawak (PMS), Mukah* Create an Excel Programme for Alloy Charging for Aluminium Ingots* Create Casthouse Phase 1 Emergency Layout by using Microsoft Visio for EHS compliance* Create Work Instruction (WI) for Pot Health Monitoring (During 6weeks attachment at Electrolysis Department)*Involve in Accident Review Meeting (ARM) with EHS team for accident case. Done the Accident Investigation Report (AIR) as well.*Purchasing raw material and diesel to ensure the stock availability for billet production.*Contribute to cast house phase 2 for 5S improvement.Internal Trainings That Have Been Attended* Effective Supervisory Training* One Point Lesson (OPL)* Environmental Compliance* Merit Demerits Training* PPE Compliance Training* Barcode System for Aluminium Products Show less
Petronas
May 2018 - now-Process technologist focal for MLNG DUA Gas Treating units covering Slugcatcher (U200), Gas Metering Units (U1000), Acid Gas Removal Unit (U2100), Dehydration & Mercury Removal Unit (U2300), Acid Gas Incinerators (U2900) & Reclaimer (U2200).-Gave technological advices for a continuous process improvement/optimisation-Supports during plant pit-stop, shutdowns and start-ups-Developed monthly technological report on overall unit performance-To assure plants operates as per process design- To provide advise/way forward during process plant troubleshooting/investigation & developed process improvements when required Show less 1. Implementing the real time monitoring tool that have avoided three occurrences of 2 tank tops on 1st June & 15 September & 1 tank bottom on 23 May 2021. This real time monitoring tool have been complementing Alpha LNG monitoring by Production Planning & LMT Group inventory management forecast. The avoidance of tank top & tank bottom could cause around RM500k of demurrage & RM90K extra port charges2. Coordinated LPG Jetty Recommissioning Project on 28th February 2021. Activities were executed as per schedule without any recordable HSE incidents. The recommissioning of LPG jetty will add on extra revenues from the LPG export of about 80.8 kton per year which is equivalent to RM180 million.3. Coordinated the PLL-OO Btu & FOTS Alignment meeting since March 2021 which resultant into many successful execution of important events such as CoF Renewal for 3 LNG Jetty Equipment which led to timely completion of CoF renewal shutdown activity have prevent total downtime of 7days which lead to cost savings around RM90 million.4. Led Operational Excellence of LPG Plant Unit (2020). Increase LPG Train B operations reliability & availability by 50%. Successfully reinstate both LPG Train A&B switchover quarterly.5. • Prevention of LOPC & Potential HSE Incidents During MCO in 2020. Operation lead for emergent CAT 1 & 2 Line repair. Successfully coordinate & safely managed LPG plant, LPG & LNG Tankage abnormal operations during the emergent work activity. This has led to reduction of Terminal Process Safety Risk Index from Medium to Low & prevent any minor/major LOPC. Show less 1. Manage Solvent Inventory of Acid Gas Removal unit by coordinating solvent top-up activity to comply 100% solvent requirement specification for the unit. 2. Site coordination for Chemical Injection into Fresh Cooling Water of Propane & Mixed Refrigerant System3. Focal Person for Schedule Waste Management of Operations Department in MLNG. Monitoring compliance of schedule waste generated.4. Focal Person for Registration Chemicals Used in MLNG DUA Operations Department5. Process Engineer for MLNG DUA Incinerator Unit (A2911,A2921,A2931 & A2941) a) Lead Shutdown & Start-Up of Incinerators Unit 2019b) Establish guideline of refractory dry-out of the incineratorsc) Establish Abnormal Operating Procedure (AOP) of MLNG DUA Modules Operating with Two Incinerators onlyd) Establish AOP of Unavailability of Low Pressure Steam (LPS) Supply from B-Track Header to Incineratorse) Establish AOP of Low Pressure Fuel Gas (LP FG) K.O Vessel without Draining Facilitities6. Process Engineer for MLNG DUA Reclaimer Unit a) Managed Reclaiming of Solvent from MLNG SATU & DUA Modules to ensure DIPA-OXA in process modules are within the specification b) Lead Shutdown & Start-Up of Reclaimer Unit 2019 c) Monitoring process & critical parameters of Reclaimer Unit d) Establish AOP of Reclaimer Unit Operating without LPS & HPS supply7. Site Coordination for Emergent Spool Replacement due to hard scale & wall loss (CAT1&2) a) Coordinate 12m 2" spool replacement (cold work) activity b) Coordinate 72m 3" spool replacement due to 78% wall loss by performing trial test, establish AOP for the online rectification activity8. Lead for PEMS installation for MLNG DUA incinerators, A2911 & A2921 a) Managed including planning & scheduling A2911 & A2921 shutdown for PEMS installation to comply Clean Air Regulation 2014 required by DOE9. Focal area for Health Risk Assessment for MLNG DUA operation dept. Show less
Gas Treating Technologist
Aug 2023 - nowProcess Engineer, Terminal Operation Department
Jan 2019 - Jul 2023Process Engineer, MLNG DUA Operation Department
May 2018 - Dec 2019
Licenses & Certifications
Graduate engineer
Board of engineers malaysiaMember of institution of chemical engineers (icheme)
Institution of chemical engineers (icheme)
Honors & Awards
- Awarded to Savena FabianZecon Excellence Award 2017 Zecon Berhad November 1, 2017
- Awarded to Savena FabianDean's List Award Semester 2 2016/2017 UNIMAS GPA:3.81
Languages
- enEnglish
- maMalay
Recommendations
Jyoti mishra
Campaign and Product Marketer | Writer | MICA | ex-WhatfixNew Delhi, Delhi, IndiaGökhan özyalaz
Turkcell şirketinde Master Expert Data Center Facilities EngineerTürkiyeYihan bian
Project ManagerChangning District, Shanghai, ChinaKelli owen
Public Safety Training Instructor - School Resource Officer SectionUnited StatesYara andijani
Regulatory Compliance officer @Alinma Bank |CCO, CME-1B, CME-2B | compliance, Risk managementRiyadh, Riyadh, Saudi ArabiaCraig weston
Test ArchitectWest Midlands, England, United KingdomPrabhath mayadunnage
Head of ManufacturingAthurugiriya, Western Province, Sri LankaTremayne burdsal
IT Service Technician at Skagit Farmers Supply & Country StoreBellingham, Washington, United StatesRishi zaveri
Global Mobility Manager at EYBengaluru, Karnataka, IndiaFira nita
Auditor at BDO in IndonesiaPancoran Mas, West Java, Indonesia
...